LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
119 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Tenant lease clauses in CS 2009 WEp1: Water Use Reduction—20% Reduction |
158 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Same firm as sub-contractor and CxA in NC 2009 EAc3: Enhanced Commissioning |
172 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
RE: Streamlined Path in NC 2009 SSc7.2: Heat Island Effect—Roof |
164 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Wed, May 22, 2013 |
|
RE: Exterior Envelope Commissioning in NC 2009 IDc1: Innovation in Design |
367 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
RE: Exterior window shades controllability in Healthcare-v2009: Controllability of systems - lighting |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Number of testing point in Healthcare-v2009: Construction IAQ management plan - before occupancy |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: List of approved LEED modeling Software in NC 2009 EAc1: Optimize Energy Performance |
819 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
265 |
Joel McCreary Principal McCreary/Snow Architects, PA Wed, May 22, 2013 |
|
RE: Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
171 |
Larissa Oaks Specialist, LEED USGBC Wed, May 22, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
33 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
101 |
Rebecca Grant Dull Olson Weekes - IBI Group Architects, Inc. Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
119 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Tenant lease clauses in CS 2009 WEp1: Water Use Reduction—20% Reduction |
158 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Same firm as sub-contractor and CxA in NC 2009 EAc3: Enhanced Commissioning |
172 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
RE: Streamlined Path in NC 2009 SSc7.2: Heat Island Effect—Roof |
164 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Wed, May 22, 2013 |
|
RE: Exterior Envelope Commissioning in NC 2009 IDc1: Innovation in Design |
367 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
RE: Exterior window shades controllability in Healthcare-v2009: Controllability of systems - lighting |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Number of testing point in Healthcare-v2009: Construction IAQ management plan - before occupancy |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: List of approved LEED modeling Software in NC 2009 EAc1: Optimize Energy Performance |
819 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
265 |
Joel McCreary Principal McCreary/Snow Architects, PA Wed, May 22, 2013 |
|
RE: Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
171 |
Larissa Oaks Specialist, LEED USGBC Wed, May 22, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
33 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
101 |
Rebecca Grant Dull Olson Weekes - IBI Group Architects, Inc. Wed, May 22, 2013 |
|
RE: minimum required irrigated area in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
76 |
Kris Phillips Architect Arcadis Wed, May 22, 2013 |
|
RE: No Smoking Signs in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
189 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,362 |
HOUCINE TLEMSANI Mechanical Designer MEP Engineering Solutions, Inc Wed, May 22, 2013 |
|
RE: HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
366 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
104 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
RE: Project Participation in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
42 |
USGBC IP Account Tue, May 21, 2013 |
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Performance Period starts after construction in Performance Period |
40 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 16, 2013 |
|
LEED Campus vs LEED Schools vs LEED NC in LEED Rating System Selection Q&A |
331 |
Caroline Hedin Thu, May 16, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
|
RE: new database in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs |
27 |
Elizabeth Thompson LEED Specialist USGBC Mon, Apr 29, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
Recycled Content Range in CI 2009 MRc4: Recycled Content |
5 | 122 |
Jennifer Berthelot-Jelovic Director of Sustainability Shangri-La Construction Thu, Feb 2, 2012 |
|
RE: Recycled Content Range in CI 2009 MRc4: Recycled Content |
5 | 122 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Feb 3, 2012 |
|
School Crosswalk in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Carol Liebst Design Engineer Johnson Engineering Sat, Dec 15, 2012 |
|
entrance lighting in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Alicja Florczak Skanska Wed, May 30, 2012 |
|
RE: entrance lighting in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Alicja Florczak Skanska Wed, May 30, 2012 |
|
RE: entrance lighting in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, May 30, 2012 |
|
RE: Exterior Lighting? in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Hrvoje Kvasnicka Fri, Jul 20, 2012 |
|
Exterior pool lighting in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Natalie Tan Sun, Mar 17, 2013 |
|
Facade Lighting installed inside the building in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Mary Ann Santos Tue, Sep 4, 2012 |
|
RE: Facade Lighting installed inside the building in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Sep 5, 2012 |
|
RE: Exterior signage in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Bill Swanson PE, LEED AP Integrated Architecture Fri, Oct 5, 2012 |
|
RE: Is facade advertising included in illuminance simultions? in CS 2009 SSc8: Light Pollution Reduction |
5 | 103 |
Adam Targowski Owner ATsec Mon, Nov 26, 2012 |
|
Feedback Survey in Pilot Credit 44: Ergonomics Strategy |
5 | 23 |
Melissa Wackerle Sustainability Manager The Beck Group Mon, Nov 5, 2012 |
|
RE: Feedback Survey in Pilot Credit 44: Ergonomics Strategy |
5 | 23 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 5, 2012 |
|
RE: Feedback Survey in Pilot Credit 44: Ergonomics Strategy |
5 | 23 |
Melissa Wackerle Sustainability Manager The Beck Group Wed, Nov 21, 2012 |
|
RE: EAc5 Measurement and Verification Option 3 in NC 2009 EAc5: Measurement and Verification |
5 | 130 |
Dan Milewski Mon, Mar 4, 2013 |
|
RE: EAc5 Measurement and Verification Option 3 in NC 2009 EAc5: Measurement and Verification |
5 | 130 |
Dan Milewski Mon, Mar 4, 2013 |
|
EAc 5.1 for CS tenant spaces in CS 2009 EAc5.1: Measurement and Verification—Base Building |
5 | 64 |
charles bell principal theGreenTeam, Inc. Wed, Sep 26, 2012 |
|
RE: EAc 5.1 for CS tenant spaces in CS 2009 EAc5.1: Measurement and Verification—Base Building |
5 | 64 |
Marcus Sheffer LEED Fellow 7group Wed, Sep 26, 2012 |
|
RE: Geothermal (Sometimes you're in, sometimes you're out!) in CS 2009 EAc2: On-Site Renewable Energy |
5 | 37 |
Marcus Sheffer LEED Fellow 7group Fri, Oct 5, 2012 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
265 |
Ramon Watkins Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
porous or non-porous material in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
Rainwater collection in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
163 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
97 |
padraic o connell Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
Copyright 2013 – BuildingGreen, Inc.