Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: HVAC to meet COP, outside US
    in CI 2009 EAp2: Minimum Energy Performance
    367 SW LEE
    LEED AP
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    119 Jim Park
    Project Manager
    EAN Technology
    Wed, May 22, 2013
    RE: Tenant lease clauses
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    158 Jim Park
    Project Manager
    EAN Technology
    Wed, May 22, 2013
    RE: Same firm as sub-contractor and CxA
    in NC 2009 EAc3: Enhanced Commissioning
    172 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    Park & Community Centers = Services?
    in Schools 2009 SSc2: Development Density and Community Connectivity
    7 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    RE: Streamlined Path
    in NC 2009 SSc7.2: Heat Island Effect—Roof
    164 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Wed, May 22, 2013
    RE: Exterior Envelope Commissioning
    in NC 2009 IDc1: Innovation in Design
    367 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    RE: Exterior window shades controllability
    in Healthcare-v2009: Controllability of systems - lighting
    2 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Roofing Adhesives, Sealants & Mastics
    in Healthcare-v2009: Low-emitting materials
    3 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Number of testing point
    in Healthcare-v2009: Construction IAQ management plan - before occupancy
    5 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    819 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    265 Joel McCreary
    Principal
    McCreary/Snow Architects, PA
    Wed, May 22, 2013
    RE: Flexible furniture layout
    in NC 2009 IEQc6.1: Controllability of Systems—Lighting
    171 Larissa Oaks
    Specialist, LEED
    USGBC
    Wed, May 22, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    33 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 22, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    Title Comments Most Recent Post
    Electric Bike Fleets are ZEV's so...
    in Healthcare-v2009: Alternative transportation - bicycle storage and changing rooms
    1 John Chinnery
    Fleet Facilitator
    Small Planet E Vehicles
    Thu, Nov 15, 2012
    RE: Addition is too big for MRc1.1
    in NC v2.2 MRc3: Materials Reuse
    34 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 12, 2012
    RE: building dashboard
    in Schools 2009 IDc1: Innovation in Design
    17 Eri Spaulding
    Ashley McGraw Architects
    Fri, Nov 9, 2012
    RE: Regularly Occupied Spaces
    in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces
    42 Todd Reed
    Daylight Designer
    7group
    Thu, Nov 8, 2012
    RE: Using V4 From
    in NC v2.2 EQc2: Increased Ventilation
    14 Hernando Miranda
    Owner
    Soltierra LLC
    Wed, Nov 7, 2012
    RE: Cube Partition height 46"
    in EBOM 2009 IEQc2.4: Daylight and Views
    55 John Frey
    Wed, Nov 7, 2012
    RE: Asbestos Remediation prior to demolition
    in Schools 2009 SSc3: Brownfield Redevelopment
    4 Larry Sims
    Principal
    Studio4, LLC
    Mon, Nov 5, 2012
    RE: Green Power Purchase for LEED NC 2009
    in Pilot Credit 56: Renewable Energy – Distributed Generation
    9 Aaron Binkley
    Director, Sustainability Programs
    Prologis
    Tue, Dec 11, 2012
    RE: 3D lighting model
    in Pilot Credit 23: Quality Views
    12 Michael E. Edmonds-Bauer
    Edmonds International
    Tue, Dec 11, 2012
    RE: Calculation of baseline, "lowest first-cost"
    in ND-v2009: Infrastructure energy efficiency
    2 Eliot Allen
    AICP, LEED AP-ND, CNU-A
    Principal, Criterion Planners LEED Faculty, LP TAG
    Fri, Oct 26, 2012
    RE: Individual Thermal Control
    in Retail–NC-v2009: Controllability of systems - lighting and thermal comfort
    2 Thomas Morris
    Thu, Oct 25, 2012
    RE: SSp2 Environmental SIte Assessment (LEED Healthcare)
    in Healthcare-v2009: Environmental site assessment
    2 Larry Sims
    Principal
    Studio4, LLC
    Mon, Oct 22, 2012
    RE: Option D or Option B
    in NC v2.2 EAc5: Measurement and Verification
    23 Afonso Cardoso
    CxA
    Leaf
    Mon, Oct 22, 2012
    RE: LUSTs discovered and remediated
    in CS 2009 SSc3: Brownfield Redevelopment
    6 Larry Sims
    Principal
    Studio4, LLC
    Mon, Oct 22, 2012
    RE: Densely occupied spaces exemption
    in EBOM 2009 IEQc1.2: IAQ Best Management Practices—Outdoor Air Delivery Monitoring
    23 Hannah Bronfman
    Sustainability Consultant
    YR&G
    Fri, Oct 19, 2012
    RE: OA Measurement for small system serving small mechanical area.
    in NC v2.2 EQc1: Outdoor Air Delivery Monitoring
    14 Dylan Connelly
    Mechanical Engineer
    Integral Group
    Fri, Oct 19, 2012
    RE: Pilot Credit 21 Systems approach
    in Pilot Credit 21: Low-Emitting Interiors
    44 Randy Carter
    Manager, Global Codes & Approvals
    Steelcase Inc.
    Tue, Dec 11, 2012
    RE: Filtration Media Documentation Table
    in Schools 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
    12 Patricia Brezny
    via Integral Group
    Wed, Oct 10, 2012
    RE: Multiple Stops On Same Route
    in Pilot Credit 12: Reduced Automobile Dependence
    43 Eric Orozco
    Urban Designer, LEED AP ND
    Neighboring Concepts, PLLC
    Sat, Oct 6, 2012
    RE: Making progress?
    in Pilot Credit 3: Medical and Process Equipment Efficiency
    23 Brian Alessi
    Sustainability Project Manager
    The Sheward Partnership, LLC
    Tue, Dec 11, 2012
    Title Comments Most Recent Post
    new project admin
    in Project Re- Registration
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Oct 13, 2010
    RE: Re: Campus and Multiple Buildings Approach
    in Campus and Multiple Buildings Approach
    2 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Oct 11, 2010
    LEEDuser resources
    in LEED Letters from Manufacturers
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Oct 11, 2010
    RE: Re: CI phased project because of budget issues
    in LEED2009 CI project: Is a phased project because of budget issues?
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Oct 10, 2010
    Re: What System to Use for Industrial Existing Buildings
    in What System to Use for Industrial Existing Buildings?
    1 David Posada
    Sustainability Manager
    GBD Architects
    Fri, Oct 8, 2010
    RE: Representative Floorplans
    in Representative Floorplans in LEED Online credit form submissions
    6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Oct 8, 2010
    RE: Re: SS and MR credits for multiple contractor projects
    in SS and MR credits for multiple contractor projects within a Campus or Installation
    2 Melanie Joseph
    Designer & LEED Coordinator
    GLMV Architecture
    Wed, Oct 6, 2010
    ready-mix plants
    in re: Ready-mix concrete and Material and resources
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Oct 5, 2010
    Re: Green Cleaning Costs
    in What is the average per square foot cost of maintaining/cleaning a LEED Gold building?
    1 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Oct 4, 2010
    Re: Audit Requirements
    in Audit Requirements
    1 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Sep 30, 2010
    WEp1 LEED Online form
    in Occupant and Usage Data: Typical number of days of operation per year
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 29, 2010
    demonstrating compliance
    in How to fulfill the LEED-Requirements if you have just one occupied room?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 29, 2010
    RE: SSc3
    in Asbestos removal
    2 Aliesa Adelman
    Sustainability Program Manager
    Wendel
    Thu, Sep 23, 2010
    RE: MRc5 question
    in Secondary products for MEP systems and MR credits
    3 Fresco Green
    Fresco Green Building
    Thu, Sep 23, 2010
    see schedule thread
    in How long for LEED Certification reviewing process
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 22, 2010
    Schools mold prevention credit
    in UV lights as an ID credit
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 21, 2010
    RE: LEED-EBOM webinar
    in Activities before registration
    5 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 21, 2010
    guide to form
    in EAp2 Mininum Energy Performance
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 16, 2010
    leaving them alone
    in LEED Online
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 16, 2010
    what is scope of work?
    in Owners role versus Tenant role in LEED CI 2009
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 16, 2010
    Title Votes Comments Most Recent Post
    MRc Bio Based Materials
    in Comment on the New LEED Rating System Draft to be Released in 2012
    69 97 Linda Smithe
    Fri, Jan 14, 2011
    RE: Including "Dry Gardens" in Design Case
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    68 76 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Wed, Aug 11, 2010
    what is considered as carpool?
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    68 212 Eric JS
    Mon, Sep 13, 2010
    RE: Is PC9 seen as an additional
    in Pilot Credit 9: Street Network
    68 67 Carey Paul
    Tue, Sep 14, 2010
    Does my project qualify for pilot credit 9?
    in Pilot Credit 9: Street Network
    68 67 ZEB Tech singapore
    ESD Consultancy
    ZEB-Technology Pte Ltd
    Tue, Sep 14, 2010
    RE: CI V3 - IEQp1 Uploads
    in CI-2009 IEQp1: Minimum IAQ Performance
    68 96 Roger Chang
    Principal, Director of Sustainability
    Westlake Reed Leskosky
    Mon, Aug 30, 2010
    CI V3 - IEQp1 Uploads
    in CI-2009 IEQp1: Minimum IAQ Performance
    68 96 Malik Rehman
    Thu, Aug 26, 2010
    RE: Site with no Zoning Requirements
    in NC v2.2 SSc4.4: Alternative Transportation—Parking Capacity
    68 37 Larry Jones
    Associate
    Atelier Ten
    Thu, Sep 23, 2010
    RE: entry way from outdoor atrium
    in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
    68 37 Pablo Fortunato Suarez
    Principal ESD Consultant/Architect
    GreenArc Sustainable Building & Architecture
    Wed, Aug 11, 2010
    Original Building Compliance
    in CI 2009 IEQc7.1: Thermal Comfort—Design
    68 44 Jeremy Kuhre
    Sustainable Buildings & Operations Manager
    Sustainable Solutions Corporation
    Thu, Aug 12, 2010
    Separate design and construction commissioning agents?
    in NC v2.2 EAc3: Enhanced Commissioning
    68 43 Mara Baum
    Healthcare Sustainable Design Leader
    HOK
    Mon, May 10, 2010
    PFc Occupant Experience Survey
    in Comment on the New LEED Rating System Draft to be Released in 2012
    68 97 Linda Smithe
    Fri, Jan 14, 2011
    RE: Base Line Budget and Change Orders
    in NC v2.2 MRc6: Rapidly Renewable Materials
    68 23 Babette Jee
    Fri, Aug 20, 2010
    RE: Is it a roof-2?
    in NC 2009 SSc7.2: Heat Island Effect—Roof
    67 164 Jim Weiner, AIA
    principal
    collaborative project consulting
    Thu, Sep 23, 2010
    RE: Including "Dry Gardens" in Design Case
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    67 76 Carlie Bullock-Jones, LEED Fellow
    Principal
    Ecoworks Studio
    Sun, Aug 22, 2010
    RE: Including "Dry Gardens" in Design Case
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    67 76 Gary Ashford
    Architect
    Duket Architects Planners
    Wed, Sep 8, 2010
    RE: Documenting Controller Efficiency
    in NC 2009 WEc1: Water Efficient Landscaping
    67 236 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Feb 7, 2011
    RE: Interior lighting for residential project
    in NC 2009 SSc8: Light Pollution Reduction
    67 397 Deborah Spira
    Tue, Sep 28, 2010
    RE: Recycled water from Local Government
    in NC 2009 WEc2: Innovative Wastewater Technologies
    67 76 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 28, 2010
    RE: How to address area requirements
    in CS 2009 SSc7.2: Heat Island Effect—Roof
    67 83 Xavi B
    Thu, Sep 16, 2010
    Title Comments Most Recent Post
    International ACPs rolled into credit language
    in International Projects - alternative compliance path
    117 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Jul 25, 2012
    Tristan, this service is
    in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
    49 Larry Sims
    Principal
    Studio4, LLC
    Wed, Jul 25, 2012
    These changes were usually reserved for the next LEED Vesion
    in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
    49 Hernando Miranda
    Owner
    Soltierra LLC
    Wed, Jul 25, 2012
    ridesharing now a recognized alternative commuting option
    in EBOM 2009 SSc4: Alternative Commuting Transportation
    232 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Jul 20, 2012
    Green Globes Guiding Principles Certification
    in Government Hears Overwhelming Support for LEED
    1 John Chyz
    Commissioning Authority
    The Cross Creek Initiative, Inc.
    Fri, Jul 13, 2012
    Option 1 - Football Stadium and Bullfighting Ring
    in NC 2009 SSc2: Development Density and Community Connectivity
    121 Alicia Silva
    CEO
    Revitaliza consultores
    Mon, Jul 9, 2012
    FTE's for Convention Center
    in Calculating FTEs
    135 Kay Sieck
    LEED-AP O&M Spokane Convention Center & INB Performing Arts Center
    Spokane Public Facilities District
    Sat, Jul 7, 2012
    LEED GREEN ASSOCIATE FREE QUIZ
    in LEED Green Associate Test Prep Resources
    1 Lorne Mlotek
    LEED AP BD+C
    LeadingGREEN
    Wed, Jul 4, 2012
    U-value unheated/heated slab-on-grade floor
    in NC 2009 EAc1: Optimize Energy Performance
    819 Francesco Passerini
    Wed, Jul 4, 2012
    LEED for Existing Homes
    in LEED for EB- O&M for Homes
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Jul 2, 2012
    Interpretations Database
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    27 Marcus Sheffer
    LEED Fellow
    7group
    Wed, Jun 27, 2012
    ID Credit for New Construction Projects
    in EBOM 2009 WEc1: Water Performance Measurement
    66 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Wed, Jun 27, 2012
    Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads
    in LEED for Homes (LEED-H) Forum
    97 Kathy Kahill
    PDT Architects
    Wed, Jun 27, 2012
    Tenant storage vs Host Building storage.
    in CI 2009 MRp1: Storage and Collection of Recyclables
    48 Luis Leal
    Luis Leal
    CTE
    Tue, Jun 26, 2012
    Partial tenant occupancy with no core water fixtures
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    158 Laurent Kanago
    Partner
    Ecohill Solutions
    Mon, Jun 25, 2012
    City review of LEED project = LEED experience?
    in Do you have questions for GBCI?
    44 Valerie J. Amor
    Visionary - CEO/President/Founder
    Drawing Conclusions LLC
    Sun, Jun 24, 2012
    LEED speciality will need to match to project type?
    in Do you have questions for GBCI?
    44 Valerie J. Amor
    Visionary - CEO/President/Founder
    Drawing Conclusions LLC
    Sun, Jun 24, 2012
    EAc1 model and EAc6 calcs
    in Performing LEED Green Power Calculations
    10 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Jun 22, 2012
    Laundry drain water
    in Pilot Credit 10: Sustainable Wastewater Management
    33 Wei Jiang
    Fri, Jun 22, 2012
    Multiple Buildings
    in PI Form 2 Project Summary Details
    65 Dhanujie Jayapala
    Sustainability Executive
    MAS Active Trading Pvt Ltd
    Wed, Jun 20, 2012

    Copyright 2013 – BuildingGreen, Inc.