LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
109 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, May 24, 2013 |
|
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values in NC 2009 EAp2: Minimum Energy Performance |
1,381 |
TOMAS URIBE PROJECT MANAGER SOLUCIONES ENERGETICAS SOSTENIBLES Fri, May 24, 2013 |
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
RE: Gravel in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
167 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
RE: EA Credit 1 - Using available waste oil for heating in NC 2009 EAc1: Optimize Energy Performance |
821 |
Marcus Sheffer LEED Fellow 7group Fri, May 24, 2013 |
|
RE: Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
124 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Skateboard Wall Panels in CI 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products |
41 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Apr 17, 2013 |
|
RE: Who can be the CxA? in CS 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
49 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Tue, Apr 16, 2013 |
|
RE: SSc6.2 form in CS-2009 SSc6.2: Stormwater Design—Quality Control |
13 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 16, 2013 |
|
RE: Shower Location Outside LEED Project Boundary in NC v2.2 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
50 |
E H Sustainability Architect Tue, Apr 16, 2013 |
|
RE: May 2011 Addenda - CFC Phaseout Plan in CI 2009 EAp3: Fundamental Refrigerant Management |
38 |
Dana Villeneuve Sustainable Design Consultant Architectural Energy Corporation Tue, Apr 16, 2013 |
|
RE: Recycling Design Guidelines for large projects in ND-v2009: Solid waste management infrastructure |
7 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Tue, Apr 16, 2013 |
|
Non Potable Water Source Use in EBOM 2009 WEc4: Cooling Tower Water Management |
55 |
Rajesh Ghorla Mr First Green Consulting Pvt Ltd Tue, Apr 16, 2013 |
|
RE: Ashpalt used in MRc4 in NC v2.2 MRc4: Recycled Content |
138 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Mon, Apr 15, 2013 |
|
RE: Tenant Lease Agreement-Glazed partitions as part of fit-out work in CS 2009 IEQc8.2: Daylight and Views—Views |
25 |
Todd Reed Daylight Designer 7group Mon, Apr 15, 2013 |
|
RE: Tenant Lease Agreement - Interior glare protection in CI 2009 IEQc8.1: Daylight and Views—Daylight |
110 |
Todd Reed Daylight Designer 7group Mon, Apr 15, 2013 |
|
Open bottom planters in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat |
79 |
Michael E. Edmonds-Bauer Edmonds International Sat, Apr 13, 2013 |
|
Tenant Lease Agreement - Interior glare protection in CS 2009 IEQc8.1: Daylight and Views—Daylight |
57 |
Petr Vogel Specialist Consultant EkoWATT CZ Sat, Apr 13, 2013 |
|
Current Regs? in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases |
4 |
Robert Millspaugh Fri, Apr 12, 2013 |
|
RE: Heat Island Effect - Nonroof in a Zero-Lot Building in CS 2009 SSc7.1: Heat Island Effect—Nonroof |
42 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, Apr 12, 2013 |
|
RE: IEQc3.2 APPA audit compliance using ISO 90001 in EBOM 2009 IEQc3.2: Green Cleaning—Custodial Effectiveness Assessment |
53 |
Gerrit-Jan Teunissen consultant TRAJECT Fri, Apr 12, 2013 |
|
Test in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort |
51 |
Victor Avedano Principal JALRW Eng. Group Inc. Thu, Apr 11, 2013 |
|
RE: Multiple CxAs? in CS 2009 EAc3: Enhanced Commissioning |
27 |
Susan Walter Sr Project Architect Wilmot/Sanz Thu, Apr 11, 2013 |
|
RE: documentation in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
70 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Thu, Apr 11, 2013 |
|
RE: Capitol Cost ECMs in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation |
32 |
Robert Calloway President Global Facility Solutions, LLC Wed, Apr 10, 2013 |
|
RE: ASHRAE 90.1 Mandatory provisions within the LEED ND boundary in ND-v2009: Minimum building energy efficiency |
4 |
Meghan Bogaerts Manager, Neighborhood Development U.S. Green Building Council Wed, Apr 10, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Re: Is EBOM Cheaper than NC in Is EBOM cheaper than NC |
2 |
Eric Johnson Associate Gardiner & Theobald Fri, Nov 11, 2011 |
|
Hi Kay in Documentation Hours |
2 |
Emily Catacchio Sustainability Specialist Wight and Company Thu, Nov 3, 2011 |
|
LEED 2009 AGMBC in Multiple Buildings Connected - Campus Approach vs Standard Approach |
5 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Nov 2, 2011 |
|
RE: Credential Maintenance Guide in Live Presentation Hours |
3 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Nov 1, 2011 |
|
RE: Energy Star ratings and volume in LEED Volume: EBOM, All Need Energy Star Rating? |
5 |
Dan Ackerstein Principal Ackerstein Sustainability, LLC Mon, Oct 31, 2011 |
|
RE: Timing of LEED registration in Can you register a project for LEED CI after construction has been completed? |
3 |
Emily Catacchio Sustainability Specialist Wight and Company Thu, Oct 27, 2011 |
|
Hi Krista in LEED Core and Shell Extents |
1 |
Emily Catacchio Sustainability Specialist Wight and Company Thu, Oct 27, 2011 |
|
Rainwater Collection? in LEED 2012 – 2nd Public Comment – Water Efficiency (WE) Section |
4 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Tue, Oct 25, 2011 |
|
Automation Session at Greenbuild Shows Potential in LEED App Store Coming Soon – What's on Your Wish-List? |
3 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Wed, Oct 12, 2011 |
| LEED 2012 Greenbuild Session Seeks High Ground | - |
by Nadav Malin Wed, Oct 12, 2011 |
| Higher Appeal fee for certain credits and prerequisites | - |
by Susann Geithner Wed, Oct 12, 2011 |
| Can I get some advice on fee structure for LEED volume certification? | - |
by Valerie Molinski Tue, Oct 11, 2011 |
|
RE: Alen A350 air purifier in Air purification |
7 |
Robert Neil Tue, Oct 4, 2011 |
|
RE: Do parking garages need to be included in the LEED project? in LEED Certifications for Parking Garages No Longer Allowed |
10 |
Helen Kessler President HJKessler Associates Sun, Oct 2, 2011 |
|
RE: synergies from LEED-NC to LEED-EBOM in Sysnergies from LEED NC 2.2 carry over to EBOM 2009 |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Sep 30, 2011 |
|
RE: LEED 2012 Credit Comments in LEED 2012 – 2nd Public Comment – Sustainable Sites (SS) Section |
16 |
Glenn Heinmiller IALD, LC, LEED AP, Principal Lam Partners Mon, Sep 26, 2011 |
|
RE: O&M Manual is the bible in LEED AP EB O+M Exam |
3 |
Bazeeth Ahamed Khader Mohamed Ali Sat, Sep 24, 2011 |
|
RE: check with GBCI in Block Team Administration |
2 |
Brian Wolfe Sustainable Coordinator HKS Thu, Sep 22, 2011 |
|
RE: Public LEED Project Directory in LEED CI - PI form 5 |
2 |
Sheela I Thu, Sep 22, 2011 |
|
Pilot Credit 44 in LEED Certification and Ergonomics |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 21, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Composite materials in NC v2.2 MRc4: Recycled Content |
90 | 138 |
Gary Ashford Architect Duket Architects Planners Tue, Sep 28, 2010 |
|
RE: Composite materials in NC v2.2 MRc4: Recycled Content |
90 | 138 |
Gary Ashford Architect Duket Architects Planners Tue, Sep 28, 2010 |
|
2004 GSA Report on Cost of LEED in Understanding the Cost of LEED-NC Project Certification |
90 | 43 |
Barbara McCrary Mechanical Engineer, PE, LEED AP BD&C HHB Engineers, P.C., Prattville, AL Thu, Dec 23, 2010 |
|
RE: non-project specific RECs in CI 2009 EAc4: Green Power |
90 | 77 |
Jacob Arlein Director of Energy Services Environmental Building Strategies Fri, Sep 10, 2010 |
|
RE: Paint Colorants? in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings |
90 | 78 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 24, 2010 |
|
Independent review of contractors submittals in NC v2.2 EAc3: Enhanced Commissioning |
90 | 43 |
Brian Farrelly Wed, Sep 8, 2010 |
|
Is PC9 seen as an additional in Pilot Credit 9: Street Network |
89 | 67 |
Michael Miller Project Architect, Sustainability Resources Group SERA Architects Thu, Sep 9, 2010 |
|
Tenant paid energy, but not a lease..... in CI 2009 EAc3: Measurement and Verification |
89 | 74 |
James Wilson Fri, Sep 10, 2010 |
|
100 year flood for project outside US? in NC 2009 SSc1: Site Selection |
89 | 56 |
Eric JS Mon, Sep 13, 2010 |
|
RE: Composite materials in NC v2.2 MRc4: Recycled Content |
89 | 138 |
Anne Nicklin Executive Director Building Materials Reuse Association Tue, Sep 28, 2010 |
|
MPR's and details in LEED Minimum Program Requirements |
89 | 428 |
Yun Day Firm Administrator Shlemmer+Algaze+Associates Mon, Sep 27, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
89 | 43 |
hao zhang Sun, May 23, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
89 | 43 |
David Wardell President & CEO Leed International, LLC Sat, Jul 10, 2010 |
|
Paint Colorants? in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings |
89 | 78 |
Fresco Green Fresco Green Building Thu, Sep 23, 2010 |
|
RE: Exemplary Performance in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces |
89 | 42 |
Carlie Bullock-Jones, LEED Fellow Principal Ecoworks Studio Mon, Sep 13, 2010 |
|
RE: Smoking area in retail area in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
88 | 189 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 10, 2010 |
|
RE: Fruits & Vegetables? in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
88 | 140 |
Nena Elise Fri, Sep 10, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
88 | 43 |
Michael Heacock Architect, LEED AP Michael Heacock Architects + LEED Consultants Thu, Apr 22, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
88 | 43 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Apr 22, 2010 |
|
Alternative standards in Schools SSp2: Environmental Site Assessment |
88 | 49 |
Martin Mechtenberg Mon, Sep 13, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Wet mineral wool on spandrel in CI 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
17 |
Antonio Rodriguez LEED AP BD+C SYASA - México Thu, Mar 21, 2013 |
|
Man-made canal in NC v2.2 SSc1: Site Selection |
19 |
Ye Yao Engineer ARUP Thu, Mar 21, 2013 |
|
Dual Flow faucet in NC 2009 WEc3: Water Use Reduction |
73 |
Mariela Garate Clarke Architect Green Building Council Chile Wed, Mar 20, 2013 |
|
USGBC as Code Officials in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Hernando Miranda Owner Soltierra LLC Wed, Mar 20, 2013 |
|
Lease Agreement an option to comply with the credit requirements in PIf4: Schedule and Overview Documents |
39 |
Mary Ann Santos Wed, Mar 20, 2013 |
|
What's the surprise new MR option in LEED v4 all about? in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Mar 19, 2013 |
|
Is there no opportunity for ID pt for data sharing in CI retail in Retail–CI-v2009: Measurement and verification |
1 |
Valerie Molinski Sustainability Coordinator Vocon Tue, Mar 19, 2013 |
|
PC 26 Advanced Energy Metering - Feedback in Pilot Credit 26: Advanced Energy Metering |
17 |
SOFIA KESIDOU Mon, Mar 18, 2013 |
|
PC 25 Water Metering and Reporting - Feedback in Pilot Credit 25: Water Metering & Reporting |
8 |
SOFIA KESIDOU Mon, Mar 18, 2013 |
|
Clogging Issues with Low Flow Fixtures in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Melissa Perry Director of Sustainable Operations Manfred Construction Fri, Mar 15, 2013 |
|
WR p3 and EA p3 Building-Level Monitoring in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Timothy Nabholz Miljöcertifieringsingenior (Environmental Certification Engineer) Skanska Thu, Mar 14, 2013 |
|
LEED v4 Sixth Public Comment in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Mar 13, 2013 |
|
WR p3 and EA p3 Building-Level Monitoring in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Timothy Nabholz Miljöcertifieringsingenior (Environmental Certification Engineer) Skanska Wed, Mar 13, 2013 |
|
Lease Agreement an option to comply with the credit requirements in CS 2009 IEQc1: Outdoor Air Delivery Monitoring |
44 |
Mary Ann Santos Tue, Mar 12, 2013 |
|
Are Science Classrooms with no fume hood exempt? in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Rebecca Grant Dull Olson Weekes - IBI Group Architects, Inc. Tue, Mar 12, 2013 |
|
asbestos roof in Asbestos Roof |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 11, 2013 |
|
MR Credits - Building product disclosure and optimization in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Melissa Wrolstad Mon, Mar 11, 2013 |
|
ID&C - EApr1 - preventing ID&C projects from achieving LEED? in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Melissa Wrolstad Mon, Mar 11, 2013 |
|
What exactly is a medical furnishing? in Healthcare-v2009: Furniture and medical furnishings |
3 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Mon, Mar 11, 2013 |
|
Manual/ Automatic irrigation required in Healthcare-v2009: Water efficient landscaping - no potable water use or no irrigation |
1 |
BABAR MEHMOOD SAUD CONSULT Fri, Mar 8, 2013 |
Copyright 2013 – BuildingGreen, Inc.