Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    818 Lawrence Lile
    Chief Engineer
    Lile Engineering LLC
    Wed, May 22, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    265 Joel McCreary
    Principal
    McCreary/Snow Architects, PA
    Wed, May 22, 2013
    WC's
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    156 CRolim Engenharia
    Wed, May 22, 2013
    RE: Flexible furniture layout
    in NC 2009 IEQc6.1: Controllability of Systems—Lighting
    171 Larissa Oaks
    Specialist, LEED
    USGBC
    Wed, May 22, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    33 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 22, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    101 Rebecca Grant
    Dull Olson Weekes - IBI Group Architects, Inc.
    Wed, May 22, 2013
    RE: minimum required irrigated area
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    76 Kris Phillips
    Architect
    Arcadis
    Wed, May 22, 2013
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    365 Katie Schulze
    Project Specialist
    Investive Building Projects
    Wed, May 22, 2013
    RE: No Smoking Signs
    in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    189 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: VAV FAN POWER BOX MODELING
    in NC 2009 EAp2: Minimum Energy Performance
    1,362 HOUCINE TLEMSANI
    Mechanical Designer
    MEP Engineering Solutions, Inc
    Wed, May 22, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    RE: Correction
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    15 Peggy White
    White + GreenSpec
    Wed, May 22, 2013
    RE: HVAC to meet COP, outside US
    in CI 2009 EAp2: Minimum Energy Performance
    366 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: Regarding LEED certification for District Cooling Plant
    in New District Energy Guidance for LEED Released by USGBC
    45 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    Title Comments Most Recent Post
    List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    818 Lawrence Lile
    Chief Engineer
    Lile Engineering LLC
    Wed, May 22, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    265 Joel McCreary
    Principal
    McCreary/Snow Architects, PA
    Wed, May 22, 2013
    WC's
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    156 CRolim Engenharia
    Wed, May 22, 2013
    RE: Flexible furniture layout
    in NC 2009 IEQc6.1: Controllability of Systems—Lighting
    171 Larissa Oaks
    Specialist, LEED
    USGBC
    Wed, May 22, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    33 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 22, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    101 Rebecca Grant
    Dull Olson Weekes - IBI Group Architects, Inc.
    Wed, May 22, 2013
    RE: minimum required irrigated area
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    76 Kris Phillips
    Architect
    Arcadis
    Wed, May 22, 2013
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    365 Katie Schulze
    Project Specialist
    Investive Building Projects
    Wed, May 22, 2013
    RE: No Smoking Signs
    in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    189 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: VAV FAN POWER BOX MODELING
    in NC 2009 EAp2: Minimum Energy Performance
    1,362 HOUCINE TLEMSANI
    Mechanical Designer
    MEP Engineering Solutions, Inc
    Wed, May 22, 2013
    RE: HVAC to meet COP, outside US
    in CI 2009 EAp2: Minimum Energy Performance
    366 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: PV's special rate
    in NC 2009 EAc2: On-Site Renewable Energy
    104 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: WE C1, Option 2, Path 2 submittal requirements
    in NC 2009 WEc1: Water Efficient Landscaping
    236 Kathryn West
    LEED AP O+M, Guiding Principles Compliance Professional
    Energy Ace
    Wed, May 22, 2013
    Street trees
    in Pilot Credit 14: Walkable Streets
    46 Roland Le Roux
    Green Building Consultant
    Wed, May 22, 2013
    Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    121 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    sealant applied to clearance between double glazing
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Noriko Yasuhara
    CSR Design & Landscape Co., Ltd.
    Tue, May 21, 2013
    RE: Building Footprint
    in PIf2: Project Summary Details
    83 Kimberly Frith
    Sustainability Consultant
    Alto Sustainability, LLC
    Tue, May 21, 2013
    RE: Determining Zone 1 or Zone 2
    in Pilot Credit 55: Bird Collision Deterrence
    20 Jessica Wuest
    Tue, May 21, 2013
    RE: Examples of PI F1, F2 and F3
    in PIf1: Development Program and Site Type
    13 Eliot Allen
    AICP, LEED AP-ND, CNU-A
    Principal, Criterion Planners LEED Faculty, LP TAG
    Tue, May 21, 2013
    Title Comments Most Recent Post
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    RE: Correction
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    15 Peggy White
    White + GreenSpec
    Wed, May 22, 2013
    RE: Regarding LEED certification for District Cooling Plant
    in New District Energy Guidance for LEED Released by USGBC
    45 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    LEED EB:OM
    in Start a New LEED Discussion Topic
    11 Lennart Lifvenhjelm
    Vasakronan AB
    Wed, May 22, 2013
    Resubmit After Dening
    in Review Appeal
    23 Chinthaka Jagodaarachchi
    Wed, May 22, 2013
    RE: v3 stormwater design vs v4 rainwater management
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    94 Theresa Backhus
    Sites Technical Specialist
    USGBC
    Tue, May 21, 2013
    RE: MRc4 recycled content---recovered fiber
    in MR Credit 4- Recycled Content
    4 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 21, 2013
    RE: Project Participation
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    42 USGBC IP Account
    Tue, May 21, 2013
    RE: LEED Online with Internet Explorer 10
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    333 Megan Koehler
    KMD Architects
    Mon, May 20, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: Performance Period starts after construction
    in Performance Period
    40 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 16, 2013
    LEED Campus vs LEED Schools vs LEED NC
    in LEED Rating System Selection Q&A
    331 Caroline Hedin
    Thu, May 16, 2013
    RE: (Jacob) Calculating for Future Growth
    in Calculating FTEs
    135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 14, 2013
    RE: about that working group....
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Marian Keeler
    Senior Associate
    Thornton Tomasetti / Simon & Associates
    Mon, May 13, 2013
    RE: Cannot login to LEED Online..
    in Living with LEED Online - quirks, bugs and hiccups
    103 Francisca Herrera
    Miranda & Nasi
    Mon, May 13, 2013
    RE: V4 implementation and '09 phase out
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 10, 2013
    RE: Master Site and different buidings certifications
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Eric Anderson
    Technical Customer Service Specialist
    GBCI
    Fri, May 10, 2013
    Tenant Sales or Lease Agreement
    in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
    19 Julie Hendricks
    Director of EcoServices
    Kirksey
    Sun, May 5, 2013
    RE: BD&C Exam Prep
    in Earn CEUs on LEEDuser—With Ease
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 30, 2013
    RE: new database
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    27 Elizabeth Thompson
    LEED Specialist
    USGBC
    Mon, Apr 29, 2013
    Title Votes Comments Most Recent Post
    Exemplary Performance Interpretation
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Cassandra Kail
    MWA Architects
    Thu, Jan 3, 2013
    RE: Exemplary Performance Interpretation
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Jan 14, 2013
    Mult Public Connection just over the 2 mile shuttle bus rule
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Johanna Ordaz
    Wed, Jan 23, 2013
    Manufacturing and Public Transit
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Andrew Sheridan
    Thu, Jan 24, 2013
    RE: Mult Public Connection just over the 2 mile shuttle bus rule
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Jan 24, 2013
    Dedicated shuttle connecting to public transport interfaces
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Pedro Ribeiro
    Director of Sustainability
    Edifícios Saudáveis Consultores
    Mon, Mar 25, 2013
    RE: Dedicated shuttle connecting to public transport interfaces
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Matthew VanSweden
    Community and Environmental Advocate
    Integrated Architecture
    Mon, Mar 25, 2013
    RE: Dedicated shuttle connecting to public transport interfaces
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Pedro Ribeiro
    Director of Sustainability
    Edifícios Saudáveis Consultores
    Tue, Mar 26, 2013
    RE: Dedicated shuttle connecting to public transport interfaces
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 deborah lucking
    Tue, Mar 26, 2013
    Exemplary Performance
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Alicia Silva
    CEO
    Revitaliza consultores
    Thu, Apr 11, 2013
    RE: Dedicated shuttle connecting to public transport interfaces
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 ADRIENN GELESZ
    LEED AP
    ABUD Engineering Ltd.
    Tue, Apr 16, 2013
    RE: Comprehensive Transportation Management Plans
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Robert Millspaugh
    Mon, Apr 22, 2013
    RE: Comprehensive Transportation Management Plans
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Apr 22, 2013
    RE: Exemplary Performance
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 David Posada
    Sustainability Manager
    GBD Architects
    Wed, Apr 24, 2013
    RE: Mult Public Connection just over the 2 mile shuttle bus rule
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 E H
    Sustainability Architect
    Wed, May 1, 2013
    RE: Building entrance vs site entrance
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Emmanuel Pauwels
    Owner
    Green Living Projects s.l.
    Mon, May 6, 2013
    Private Bus Service
    in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
    1 97 Daniel R Gutierrez
    Project Architect
    INGETEC
    Thu, May 9, 2013
    RE: Framing Reuse
    in NC v2.2 MRc1.1–1.2: Building Reuse
    1 22 Danny Richardson
    Partner
    Secord & Lebow Architects, LLP
    Thu, Jan 17, 2013
    RE: Framing Reuse
    in NC v2.2 MRc1.1–1.2: Building Reuse
    1 22 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Mar 21, 2013
    Framing Reuse
    in NC v2.2 MRc1.1–1.2: Building Reuse
    1 22 Danny Richardson
    Partner
    Secord & Lebow Architects, LLP
    Wed, Jan 16, 2013
    Title Comments Most Recent Post
    List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    818 Lawrence Lile
    Chief Engineer
    Lile Engineering LLC
    Wed, May 22, 2013
    WC's
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    156 CRolim Engenharia
    Wed, May 22, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    MRc4 and MRc7
    in NC 2009 MRc4: Recycled Content
    265 Ramon Watkins
    Wed, May 22, 2013
    Street trees
    in Pilot Credit 14: Walkable Streets
    46 Roland Le Roux
    Green Building Consultant
    Wed, May 22, 2013
    Resubmit After Dening
    in Review Appeal
    23 Chinthaka Jagodaarachchi
    Wed, May 22, 2013
    Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    121 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    sealant applied to clearance between double glazing
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Noriko Yasuhara
    CSR Design & Landscape Co., Ltd.
    Tue, May 21, 2013
    porous or non-porous material
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Noriko Yasuhara
    CSR Design & Landscape Co., Ltd.
    Tue, May 21, 2013
    Just joined in with LEED
    in NC v2.2 EQc6.1: Controllability of Systems—Lighting
    42 alex songs
    Tue, May 21, 2013
    Leakage Rate in v5 Form
    in EBOM 2009 EAc5: Enhanced Refrigerant Management
    31 Andy Rhoades
    Partner
    Leading Edge Consulting
    Mon, May 20, 2013
    Rainwater collection
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    163 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Mon, May 20, 2013
    Vertical addition to a hotel - site boundary
    in MPR3: Must use a reasonable site boundary
    97 Adam Targowski
    Owner
    ATsec
    Mon, May 20, 2013
    Daylight controls in ALL daylit areas within 15 ft?
    in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls
    48 Maria Porter
    Environmental Certification Engineer
    Skanska Sweden
    Mon, May 20, 2013
    water treatment outside LEED project boundary
    in NC 2009 WEc2: Innovative Wastewater Technologies
    76 Yasir Nurrahman
    Mr. Yasir
    PT. Indonesia Environment Consultant
    Mon, May 20, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    97 padraic o connell
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013

    Copyright 2013 – BuildingGreen, Inc.