LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: FSC 100% Pure Wood Doors in Schools 2009 MRc7: Certified Wood |
12 |
ADRIENN GELESZ LEED AP ABUD Engineering Ltd. Thu, Jun 20, 2013 |
|
RE: Geometry baseline vs. proposed building performance in NC v2.2 EAp2: Minimum Energy Performance |
186 |
jaume balana quadrant Thu, Jun 20, 2013 |
|
How many signs are required for preferred parking? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
220 |
Susan Di Giulio Project Manager Zinner Consultants Thu, Jun 20, 2013 |
|
Slate Porcelain Tiles in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
203 |
Benj Herrera LEED AP BD+C Thu, Jun 20, 2013 |
|
Secure parking garage/room in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
162 |
Phillip Cook WGE Wed, Jun 19, 2013 |
|
Duct adhesives in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
71 |
Michael E. Edmonds-Bauer Edmonds International Wed, Jun 19, 2013 |
|
Extended Stay? in CS 2009 SSc2: Development Density and Community Connectivity |
32 |
Sara Neff Director, Sustainability Programs Kilroy Realty Corporation Wed, Jun 19, 2013 |
|
RE: Recycling Rooms in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
192 |
Dylan Connelly Mechanical Engineer Integral Group Wed, Jun 19, 2013 |
|
PI Form 3 occupancy question, transient student vs retail in PIf3: Occupant and Usage Data |
107 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Wed, Jun 19, 2013 |
|
RE: Line between consumables and 'process' consumables in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
78 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Wed, Jun 19, 2013 |
|
RE: E Cigarettes in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
74 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 19, 2013 |
|
Occupant feedback in EBOM 2009 IEQp3: Green Cleaning Policy |
45 |
Sheryl Swartzle LEED administration TLC Engineering for Architecture Wed, Jun 19, 2013 |
|
retention basin and infiltration on site in NC 2009 SSc6.2: Stormwater Design—Quality Control |
109 |
ADRIENN GELESZ LEED AP ABUD Engineering Ltd. Wed, Jun 19, 2013 |
|
RE: Modelling Basement Parking in NC 2009 EAp2: Minimum Energy Performance |
1,426 |
Marcus Sheffer LEED Fellow 7group Wed, Jun 19, 2013 |
|
RE: Submit a Low Mercury ID Credit in NC 2009 IDc1: Innovation in Design |
370 |
Clara Pistoni Sustainability Consultant Wed, Jun 19, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Connection of sidewalks in Pilot Credit 14: Walkable Streets |
48 |
Karyn Rodrigues Architect consultant, LEED AP-ND, BD+C Tue, Jun 4, 2013 |
|
Programs for ASHRAE 55 in NC v2.2 EQc7.1: Thermal Comfort—Design |
25 |
Patrick MacPherson PC Sustainable Design Consulting Tue, Jun 4, 2013 |
|
RE: Mercury and Flyash in Healthcare-v2009: Sustainably sourced materials and products |
8 |
Susan Walter Sr Project Architect Wilmot/Sanz Tue, Jun 4, 2013 |
|
Minimum square area for facility alteration/ addition in EBOM 2009 IEQc1.5: IAQ Best Management Practices—IAQ Management for Facility Alterations and Additions |
33 |
Magda Aghababyan CEO Co-Energi (Pvt) Ltd. Tue, Jun 4, 2013 |
|
RE: Gym Memberships and shower access for C&S in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
64 |
John McFarland Director of Operations WorkingBuildings, LLC Mon, Jun 3, 2013 |
|
RE: Cooling Tower Submetering in NC 2009 EAc5: Measurement and Verification |
132 |
Marcus Sheffer LEED Fellow 7group Mon, Jun 3, 2013 |
|
RE: Projects with basements in Healthcare-v2009: Daylight and views - views |
17 |
Susan Walter Sr Project Architect Wilmot/Sanz Mon, Jun 3, 2013 |
|
Section 1.4: Mechanical System Design Criteria in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
206 |
Nick Chiarelli Mon, Jun 3, 2013 |
|
RE: mr5 - 500 mile radius in NC v2.2 MRc5: Regional Materials |
108 |
Sara Axon Mon, Jun 3, 2013 |
|
RE: Corrective Action for Thermal Comfort Survey in Schools 2009 IEQc7.2: Thermal Comfort—Verification |
9 |
Ahmed Younis Instrumentation and Control Engineer Dar Al Handasah Mon, Jun 3, 2013 |
|
RE: Non-US Projects in CI 2009 IEQc2: Increased Ventilation |
7 |
Dylan Connelly Mechanical Engineer Integral Group Fri, May 31, 2013 |
|
RE: Design Build Contractual Question- EAc3 in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems |
43 |
Dylan Connelly Mechanical Engineer Integral Group Fri, May 31, 2013 |
|
RE: Concrete flat ties in NC v2.2 MRc4: Recycled Content |
140 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, May 31, 2013 |
|
RE: Upper and lower roof in Healthcare-v2009: Heat island effect - roof |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, May 31, 2013 |
|
RE: Proving compliance for a C&S project in CS 2009 IEQc6: Controllability of Systems—Thermal Comfort |
23 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Fri, May 31, 2013 |
|
RE: Number of testing point in Healthcare-v2009: Construction IAQ management plan - before occupancy |
6 |
Emil Andersson Green Certification Coordinator Skanska Sweden Fri, May 31, 2013 |
|
RE: water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
77 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Fri, May 31, 2013 |
|
Energy Model using ECB Method with Existing AHU in CI 2009 EAp2: Minimum Energy Performance |
368 |
Mark Stromberg Thu, May 30, 2013 |
|
RE: SSc2 option 2 in CI 2009 SSc2: Development Density and Community Connectivity |
85 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Thu, May 30, 2013 |
|
RE: Pilot credit in ND-v2009: Innovation and exemplary performance |
2 |
Meghan Bogaerts Manager, Neighborhood Development U.S. Green Building Council Thu, May 30, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: LEED EBOM: India in assistance for overseas projects |
6 |
sanjay vashishtha Dr. Firstgreen Consulting Thu, Jul 12, 2012 |
| First LEED-ND Platinum Certification for NYC at Columbia University | - |
by Erin Weaver Wed, Jul 11, 2012 |
|
LEED for Existing Homes in LEED for EB- O&M for Homes |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 2, 2012 |
|
RE: LEED Online Issues in leedonline.com access - is it possible??? |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Jun 29, 2012 |
| LEED “Certifiable” Specifications: 4 Approaches | - |
by Tristan Roberts Wed, Jun 27, 2012 |
|
ACP Process : BREEAM equivalency in LEED Now Recognizes Energy Credits from BREEAM |
1 |
CHRISTOPHE MATHIEU Sustainable Design And Construction Consultants, Paris, France greenaffair Mon, Jun 25, 2012 |
|
RE: What should USGBC do with the extra time to ensure success? in LEED 2012 Postponed to 2013, Renamed LEED v4 |
28 |
Larry Sims Principal Studio4, LLC Thu, Jun 14, 2012 |
|
RE: LEED Specifications in Top Six Things LEED Consultants Do Wrong in Specs |
5 |
Hernando Miranda Owner Soltierra LLC Wed, Jun 20, 2012 |
|
Dan, in LEED Submittal Forms, Beta to v3 |
1 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Jun 12, 2012 |
|
RE: 4th edition vs. 3rd edition in More Money, Less Guesswork: ITE Parking Generation Study and SSc4.4 |
18 |
Emily Catacchio Sustainability Specialist Wight and Company Thu, Jun 21, 2012 |
|
RE: LEED Online Access to Certified Projects in LEED Online Access to Certified Projects |
8 |
Matt Bartner Wed, May 30, 2012 |
|
RE: 4th comment period open in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum |
107 |
Barry Giles Founder & CEO, USGBC LEED Faculty, LEED AP O+M BuildingWise LLC Tue, May 15, 2012 |
|
RE: LEED certification in China in Hi from China LEED engineer |
3 |
Hernando Miranda Owner Soltierra LLC Sat, May 5, 2012 |
|
retaining LEED certification in Loss of LEED Certification after renovating? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 1, 2012 |
|
Reference Guide E-Books need to be editable or updated by USGBC in LEED 2012 Behind the Scenes - follow up conversation |
4 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, May 1, 2012 |
|
RE: Surrounding Density and Diverse Uses in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section |
16 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Fri, Apr 27, 2012 |
|
RE: Fundamental Commissioning in LEED 2012 – 2nd Public Comment – Performance (PF) Section |
9 |
Daniel Forino Sustainability Engineering Horizon Engineering Associates Thu, Apr 19, 2012 |
|
RE: GSF with demolition in Demolition of Existing Building |
4 |
Clint Newton Project Manager Spillman Farmer Architects Wed, Apr 11, 2012 |
| BREEAM Equivalency for LEED Projects | - |
by Deon Glaser Wed, Apr 11, 2012 |
|
RE: Specific Forum in The Certification of an Institutional Building |
2 |
Marco Antonio Sustainability Manager Igreja Universal do Reino de Deus Wed, Apr 11, 2012 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Regionally manufactured materials in NC 2009 MRc5: Regional Materials |
237 | 154 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Mon, Dec 7, 2009 |
|
understanding the Daylight Factor method in CI 2009 IEQc8.1: Daylight and Views—Daylight |
236 | 112 |
Alex Warburton Sat, Jan 9, 2010 |
|
Points available for EQ pr2 (ETS control)? in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
236 | 190 |
jeff gaines manager of programming and planning albert kahn associates, inc. Thu, Sep 24, 2009 |
|
Concrete Sealer in NC 2009 MRc5: Regional Materials |
235 | 154 |
Adolfo Silva Principal Ecovert Corporation Thu, Nov 19, 2009 |
|
RE: Dormitory that is No Smoking in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
233 | 190 |
Ben Stanley Sustainability Manager YRG sustainability Fri, Jan 29, 2010 |
|
Janitor Sinks in CI 2009 WEp1: Water Use Reduction—20% Reduction |
232 | 175 |
Eric Doyle Project Administrator Catalyst Partners Tue, Jan 19, 2010 |
|
Motel-style dormitory with smoking rooms in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
231 | 190 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Wed, Jan 20, 2010 |
|
RE: Hospital water use? in NC 2009 WEc3: Water Use Reduction |
231 | 76 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Mon, Feb 1, 2010 |
|
ANSI S12.60-2002 - Not required? in Schools 2009 IEQp3: Minimum Acoustical Performance |
229 | 124 |
John Dunn President 2D Innovations Sat, Nov 14, 2009 |
|
No extra points available for EQp2 in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
227 | 190 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Fri, Sep 25, 2009 |
|
The Naming of Options, and Knowing Which Applies to You in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
226 | 99 |
Jenny Carney Principal YR&G Tue, Jan 5, 2010 |
|
Comprehensive Info on Green Roofs in Green Roofs |
226 | 14 |
Jim Newman Principal Linnean Solutions Fri, Oct 30, 2009 |
|
USGBC provides additional guidance in CI 2009 WEp1: Water Use Reduction—20% Reduction |
225 | 175 |
Shannon Gray Consultant YRG sustainability Thu, Dec 3, 2009 |
|
RECs providers... in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
224 | 68 |
Jared Silliker Owner Silliker + Partners Tue, Jan 26, 2010 |
|
RE: Illogical ETS requirement for existing non-res. buildings? in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
223 | 190 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Dec 10, 2009 |
|
RE: Grabbing a non-contiguous park in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
222 | 146 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Wed, Feb 3, 2010 |
|
RE: USGBC provides additional guidance in CI 2009 WEp1: Water Use Reduction—20% Reduction |
221 | 175 |
Dave Intner Firmitas Architecture & Planning Mon, Dec 21, 2009 |
|
Illogical ETS requirement for existing non-res. buildings? in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
221 | 190 |
John Burnett FAC-LEEDership Wed, Dec 9, 2009 |
|
RE: Motel-style dormitory with smoking rooms in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
220 | 190 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 20, 2010 |
|
RE: Calculating FTE/Transients for Hospital environments in NC 2009 WEc3: Water Use Reduction |
217 | 76 |
Mara Baum Healthcare Sustainable Design Leader HOK Wed, Feb 3, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
100 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
100 |
padraic o connell Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
11 |
CRolim Engenharia Fri, May 17, 2013 |
|
Vertical addition to a hotel project in MPR2: Must be a complete, permanent building or space |
46 |
Adam Targowski Owner ATsec Fri, May 17, 2013 |
|
green roof cover - ivy in CS 2009 SSc7.2: Heat Island Effect—Roof |
83 |
Mario Pinoli Fri, May 17, 2013 |
|
Room by Room flush-out Calculations in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy |
125 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Thu, May 16, 2013 |
|
Who develops the plan for corrective action? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
61 |
Nicole Kimoto Architects Pacific, Inc. Thu, May 16, 2013 |
|
Allowable VOC in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
340 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Thu, May 16, 2013 |
|
Comprehensive waste management program in CS 2009 MRp1: Storage and Collection of Recyclables |
31 |
Michael E. Edmonds-Bauer Edmonds International Thu, May 16, 2013 |
|
"wood wars" in NC 2009 MRc7: Certified Wood |
245 |
Doreen Kruschina Doreen Kruschina Planung+Baumanagement Thu, May 16, 2013 |
|
Municipal tertiary treated water transported in on tankers? in NC 2009 WEc1: Water Efficient Landscaping |
239 |
Natalie Tan Thu, May 16, 2013 |
|
Material reuse based on cost or volume in NC 2009 MRc3: Materials Reuse |
45 |
Mahbuba Khan President MnKhan Architects PLLC Thu, May 16, 2013 |
|
LEED vs Global Green vs The next rating system in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Wyan DeFilippo LEED AP BD+C Green Work Experience Wed, May 15, 2013 |
|
Timeline on reports in EBOM 2009 EAp3: Fundamental Refrigerant Management |
55 |
Hugh Hagues University Centers Assist. Director University of California, San Diego Wed, May 15, 2013 |
|
Contact your senators! in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Michelle Robinson Re:Vision Architecture Wed, May 15, 2013 |
|
Carbon Offsets (Green-e Equivalent) in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
68 |
Henrique Mendes Mr. Green Domus Wed, May 15, 2013 |
Copyright 2013 – BuildingGreen, Inc.