LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
5 |
BABAR MEHMOOD SAUD CONSULT Sat, May 18, 2013 |
|
RE: Casework in NC 2009 MRc7: Certified Wood |
238 |
Jason Grant Principal Jason Grant Consulting Fri, May 17, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
96 |
padraic o connell Fri, May 17, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
255 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, May 17, 2013 |
|
Acoustics study in NC 2009 IDc1: Innovation in Design |
355 |
Katie Schulze Project Specialist Investive Building Projects Fri, May 17, 2013 |
|
RE: Good to know in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
13 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: LEV discounted parking in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
209 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
111 |
Michael DeVuono T&M Associates Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: IEQc5 for Healthcare in Healthcare-v2009: Indoor chemical and pollutant source control |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Sat, Mar 23, 2013 |
|
Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
2 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Fri, Mar 22, 2013 |
|
Line between consumables and 'process' consumables in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
77 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Mar 22, 2013 |
|
RE: What standards should I use? in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings |
75 |
Todd Bundren Associate Lawrence Group Fri, Mar 22, 2013 |
|
RE: About the "Cost-saving ahead" factor in WEc2 in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: PDF Forms in EBOM 2009 MRp1: Sustainable Purchasing Policy |
25 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: Elevated Air Speed in CI 2009 IEQc7.1: Thermal Comfort—Design |
44 |
Marco Barrera Engineer FMS Engineering Fri, Mar 22, 2013 |
|
RE: USGBC Overhauls Demand Response Pilot - in Response to Critics in Pilot Credit 8: Demand Response |
29 |
Daniel Whittet LEED AP BD&C EBOM Assoc. AIA AHA Consulting Engineers Fri, Mar 22, 2013 |
|
RE: Smoking areas in CS 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
38 |
charles bell principal theGreenTeam, Inc. Fri, Mar 22, 2013 |
|
RE: Undefined Outdoor Spaces in CS 2009 SSc6.1: Stormwater Design—Quantity Control |
20 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: Whose invoice is necesary? in CS 2009 MRc5: Regional Materials |
16 |
Michael E. Edmonds-Bauer Edmonds International Fri, Mar 22, 2013 |
|
RE: Project GFA excluding underground parking areas? in CS 2009 MRc1: Building Reuse—Maintain Existing Walls, Floors and Roof |
14 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: Green guide applicable to thos credit at all? in CS 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
40 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: EA Cre 4_LEEDonline form in CS 2009 EAc4: Enhanced Refrigerant Management |
36 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: outdoor delivery rates in a naturally ventilated space in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: Do cubicle partitions count as furniture/durable goods in MRC2? in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods |
59 |
Jubilee Daniels, MLA, LEED AP O+M Consultant, Sustainable Buildings and Operations Jubilee Environmental Consulting Thu, Mar 21, 2013 |
|
Wet mineral wool on spandrel in CI 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
17 |
Antonio Rodriguez LEED AP BD+C SYASA - México Thu, Mar 21, 2013 |
|
RE: Previously developed land in PIf1: Development Program and Site Type |
11 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Thu, Mar 21, 2013 |
|
Man-made canal in NC v2.2 SSc1: Site Selection |
19 |
Ye Yao Engineer ARUP Thu, Mar 21, 2013 |
|
RE: Question regarding the OPR and BOD in CI 2009 EAc2: Enhanced Commissioning |
19 |
Robert Calloway President Global Facility Solutions, LLC Wed, Mar 20, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
IEQ credits in Power Plant Process Space |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 30, 2011 |
|
RE: At least in the older LEED in New Credits after Preliminary Review? |
2 |
Steve Offutt Fri, Jul 29, 2011 |
|
RE: Re: Promotional code in How to get a promotional code? |
8 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Wed, Jul 27, 2011 |
|
RE: Very good presentation, in Live Webcast: LEED AP+: Should You Opt In, and What To Do Once You Have |
11 |
Josh Mauldin ASA Architects Wed, Jul 27, 2011 |
|
RE: LEED Automation in LEED Automation |
4 |
John Albrecht Director of LEED Services Sieben Energy Assoc. Tue, Jul 12, 2011 |
|
Earning Certs within 5 years in Earning certification within 5 years |
1 |
Barry Giles Founder & CEO, USGBC LEED Faculty, LEED AP O+M BuildingWise LLC Mon, Jul 11, 2011 |
|
RE: 2 buildings on one site, one equipment, etc in Two buildings on one site, one equipment, and only one building pursuing LEED |
3 |
Barry Giles Founder & CEO, USGBC LEED Faculty, LEED AP O+M BuildingWise LLC Fri, Jul 8, 2011 |
|
Re: Addition to LEED Certified Building in Addition to LEED Certified Building |
1 |
David Posada Sustainability Manager GBD Architects Thu, Jul 7, 2011 |
|
RE: USGBC response...(EBOM growth) in Growth of EB O&M projects? |
2 |
Scott Dunning Architect HKS, Inc. Wed, Jul 6, 2011 |
|
LEED matrix in Submittal Checklist |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Jul 5, 2011 |
|
YES!! in Inconsistency of LEED Requirements between reference manuals, credit forms and review comments. |
1 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Thu, Jun 16, 2011 |
|
Re: LEED NC versus LEED for Homes for Temporary Lodging Faciliti in LEED NC versus LEED for Homes for Temporary Lodging Facilities |
1 |
David Posada Sustainability Manager GBD Architects Tue, Jun 14, 2011 |
|
Re: Facility Alterations and Additions in Facility Alterations and Additions |
1 |
David Posada Sustainability Manager GBD Architects Tue, Jun 14, 2011 |
|
Pl information in Front End Project Information - LEED online PI f1, PI f2, PI f3, PI f4 |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jun 13, 2011 |
|
ACP in Additional Details - interpretation |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jun 8, 2011 |
| Reopening a design phase credit | - |
by Marcus Hanlon Tue, Jun 7, 2011 |
|
From USGBC Website in Bank - branches |
1 |
Candace Small Thu, Jun 2, 2011 |
|
my experience in LEED core + shell vs. new construction |
1 |
Candace Small Thu, Jun 2, 2011 |
|
Comments in Mixed Used Development Certification |
1 |
Candace Small Wed, Jun 1, 2011 |
|
vinyl windows in LEED in pvc windows and cooling towers |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jun 1, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
right to access checklist in EBOM 2009 SSc1: LEED Certified Design and Construction |
84 | 26 |
Joanna Yaghooti Director of Sustainable Design PageSoutherlandPage Thu, Aug 12, 2010 |
|
RE: Independent review of contractors submittals in NC v2.2 EAc3: Enhanced Commissioning |
84 | 43 |
Chris Ladner Partner Viridian Wed, Sep 8, 2010 |
|
Alternative standards in Schools SSp2: Environmental Site Assessment |
84 | 49 |
Martin Mechtenberg Mon, Sep 13, 2010 |
|
RE: Waste Hauler sorts off-site in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit |
84 | 57 |
Paul C Thu, Sep 23, 2010 |
|
How does this pilot credit link to the 'process loads' in EA1? in Pilot Credit 3: Medical and Process Equipment Efficiency |
83 | 23 |
Julian Bott Principal Design Consultant Cundall Hong Kong Tue, Sep 28, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
83 | 43 |
Landon Chapman Graduate Architect, LEED AP MSKTD & Associates, Inc. Tue, Jul 13, 2010 |
|
RE: no desigated/assigned/reserved parking for tenant in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
83 | 84 |
David Posada Sustainability Manager GBD Architects Wed, Aug 25, 2010 |
|
RE: Interior lighting for residential project in NC 2009 SSc8: Light Pollution Reduction |
83 | 395 |
Bill Swanson PE, LEED AP Integrated Architecture Tue, Sep 28, 2010 |
|
Residental AND Commercial in Project Information form |
82 | 45 |
Deborah Spira Mon, Sep 13, 2010 |
|
RE: "Building Completed 1993 or Later" Tab on Graph in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
82 | 55 |
Dan Ackerstein Principal Ackerstein Sustainability, LLC Wed, Sep 29, 2010 |
|
RE: Waste Hauler sorts off-site in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit |
82 | 57 |
Paul C Thu, Sep 23, 2010 |
|
RE: Waste Hauler sorts off-site in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit |
82 | 57 |
Paul C Thu, Sep 23, 2010 |
|
RE: Waste Hauler sorts off-site in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit |
82 | 57 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Sep 23, 2010 |
|
RE: Permanent entryways on the roof in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
82 | 64 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 24, 2010 |
|
Gas Fired Equipment in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
82 | 70 |
Chris Dewey Project Manager Van Auken Akins Architects LLC Mon, Sep 27, 2010 |
|
RE: Staging Flush Out. in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy |
82 | 124 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Mon, Sep 27, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
81 | 43 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Mon, May 24, 2010 |
|
RE: 2004 GSA Report on Cost of LEED in Understanding the Cost of LEED-NC Project Certification |
81 | 43 |
Sayeed Muhammad Principal Consultant Green Building Consultants (S) Pte Ltd Mon, Mar 21, 2011 |
|
Exterior lighting - option 3 in EBOM 2009 SSc8: Light Pollution Reduction |
81 | 82 |
Tanmay Tathagat Environmental Design Solutions Tue, Sep 14, 2010 |
|
no desigated/assigned/reserved parking for tenant in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
81 | 84 |
Kathy Buck Senior Project Manager Neumann/Smith Architecture Wed, Aug 25, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Is data being gathered and used? in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
Bill Swanson PE, LEED AP Integrated Architecture Tue, Jan 22, 2013 |
|
Kitchen Food Service Equipment in Schools 2009 EAc4: Enhanced Refrigerant Management |
3 |
Hamilton Cort Principal Cort Architectural Group Mon, Jan 21, 2013 |
|
Surface brightness requirement in Pilot Credit 22: Quality Interior Lighting |
9 |
Fatima Plaza Mon, Jan 21, 2013 |
|
embodied energy in Pilot Credit 63: Whole Building Life Cycle Assessment |
7 |
Jody Solell Owner Solar Electrics Fri, Jan 18, 2013 |
|
LEED Boundary/Gross Floor Area for LEED-CI project in PIf2: Project Summary Details |
81 |
Alejandro Rivera Rivera Junior Engineer Studio Domus Wed, Jan 16, 2013 |
|
Material-Efficient Framing based on LEED-Homes? in NC 2009 IDc1: Innovation in Design |
355 |
Heather DeGrella Director of Sustainable Education GreenCE, Inc. Tue, Jan 15, 2013 |
|
Development density of the surrounding residential zone or neigh in How to Document SSc2 with Map Data |
30 |
Gaston Viau Tue, Jan 15, 2013 |
|
Project information (PI) forms in PIf2: Project Summary Details |
81 |
Ameet AA Tue, Jan 15, 2013 |
|
street network in Pilot Credit 9: Street Network |
67 |
Sara Aschliman Mon, Jan 14, 2013 |
|
New LEED boundary definition for SSc8 in Key LEED 2009 Interpretations |
4 |
Bill Swanson PE, LEED AP Integrated Architecture Mon, Jan 14, 2013 |
|
USGBC Membership and Cont. Ed in Webcast Video: – LEED AP+: Should You Opt In, and What To Do Once You Have |
14 |
Cassandra Kail MWA Architects Thu, Jan 10, 2013 |
|
Modified AHU in CI 2009 EAp2: Minimum Energy Performance |
364 |
Alejandro Rivera Rivera Junior Engineer Studio Domus Thu, Jan 10, 2013 |
|
Multi-family - Energy Disclosure Requirement in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
Jeremy Kuhre Sustainable Buildings & Operations Manager Sustainable Solutions Corporation Thu, Jan 10, 2013 |
|
Bicycle Network in Pilot Credit 30: Alternative Transportation |
6 |
Nate Steeber LEED Consultant & Designer Sol Developments Thu, Jan 10, 2013 |
|
WE-P1 Reduced Occupancy Guidance in How to Complete the LEED-NC WEp1 Form in LEED Online |
35 |
Bruce Albright LEEDAP O+M PJS Thu, Jan 10, 2013 |
|
LI #2500/#10209 Shower Requirements for Mixed Use Buildings in Key LEED 2009 Interpretations |
4 |
Michelle Rosenberger Partner ArchEcology, LLC Wed, Jan 9, 2013 |
|
note to LEED users posting to this forum in PIf1: Minimum Program Requirements |
65 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Jan 4, 2013 |
|
Carbon Offset V4 Alternative Compliance Success - LEED CI in CI 2009 EAc4: Green Power |
77 |
Andreas Gyr Mary Davidge Associates Thu, Jan 3, 2013 |
|
USGBC BPP in Pilot Credit 38: Advanced Utility Tracking |
4 |
Sara Aschliman Thu, Jan 3, 2013 |
|
Missing requirement on Pilot Form? in Pilot Credit 53: Responsible Sourcing of Raw Materials |
3 |
Brian Leet Freeman French Freeman Mon, Dec 31, 2012 |
Copyright 2013 – BuildingGreen, Inc.