LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: unit (cf/storm) in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
139 |
Ameet AA Wed, Jun 19, 2013 |
|
Form in PIf2: Project Summary Details |
88 |
M K Wed, Jun 19, 2013 |
|
LEED v4-Credits MR-USGBC approved program in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
37 |
Paola Moschini Architect LEED AP BD+C MACRO DESIGN STUDIO Wed, Jun 19, 2013 |
|
RE: CI for retail? in LEED Rating System Selection Q&A |
345 |
Jan Hesse Wed, Jun 19, 2013 |
|
RE: Building eyebrows count towards area? in NC 2009 SSc7.2: Heat Island Effect—Roof |
173 |
Nicole Kimoto Architects Pacific, Inc. Tue, Jun 18, 2013 |
|
RE: Recycling Rooms in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
190 |
Victor Avedano Principal JALRW Eng. Group Inc. Tue, Jun 18, 2013 |
|
RE: LEED v2009 NC Total Daily Occupancy - Help Please! in PIf3: Occupant and Usage Data |
106 |
Gary Shlifer Green Building Professional LEED AP BD+C, Homes - Chief Sustainability Professional Guernsey Tue, Jun 18, 2013 |
|
Indoor Turf in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
201 |
Martha Norbeck President C-Wise Design and Consulting LLC Tue, Jun 18, 2013 |
|
RE: ablution fixture in NC 2009 WEp1: Water Use Reduction—20% Reduction |
431 |
E H Sustainability Architect Tue, Jun 18, 2013 |
|
RE: Using EBOM MRc8 as a LEED-NC ID Credit in EBOM 2009 MRc8: Solid Waste Management—Durable Goods |
38 |
Luis Miguel Diazgranados Green Factory Tue, Jun 18, 2013 |
|
RE: LEED v4 Voting in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
34 |
Bill Swanson PE, LEED AP Integrated Architecture Tue, Jun 18, 2013 |
|
RE: FSC COC Certification and Sub Contractors. in NC 2009 MRc7: Certified Wood |
245 |
Michael McVinney LEED Program Manager Sauer Incorporated Tue, Jun 18, 2013 |
|
RE: Recertification in PIf5: Building System Control |
3 |
David Wood Property Coordinator Jones Lang Lasalle/ BNY Mellon Tue, Jun 18, 2013 |
|
RE: Innovation Credit: Electric charge stations in EBOM 2009 IOc1: Innovation in Operations |
39 |
Trista Little Sustainability Manager YR&G Tue, Jun 18, 2013 |
|
RE: Meeting GIBp2 and GIBp3 in mixed uUse Buildings not fully leased in LEED for Neighborhood Development (LEED-ND) Forum |
171 |
Marc Mondor Principal evolve LLC Tue, Jun 18, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
34 |
Candace Small Thu, May 23, 2013 |
|
RE: Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
5 |
Candace Small Thu, May 23, 2013 |
|
RE: Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Potential crossover credit from New Construction to Schools? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
38 |
James Leonard via Buro Happold Thu, May 23, 2013 |
|
RE: MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
267 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, May 23, 2013 |
|
RE: WC's in CS 2009 WEp1: Water Use Reduction—20% Reduction |
159 |
OSCAR DE LA RED LEED AP BD+C PROMEC Thu, May 23, 2013 |
|
RE: Exterior window shades controllability in Healthcare-v2009: Controllability of systems - lighting |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
RE: Determining Zone 1 or Zone 2 in Pilot Credit 55: Bird Collision Deterrence |
20 |
Jessica Wuest Tue, May 21, 2013 |
|
RE: Examples of PI F1, F2 and F3 in PIf1: Development Program and Site Type |
13 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Tue, May 21, 2013 |
|
RE: Average Pressure Differential - New LEED Online Template in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
58 |
Dylan Connelly Mechanical Engineer Integral Group Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
RE: Construction Waste Management (Material & Resources : Credit 2) in NC v2.2 MRc2: Construction Waste Management |
97 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Mon, May 20, 2013 |
|
RE: SSc2 Site Area vs LEED Project Boundry in CS 2009 SSc2: Development Density and Community Connectivity |
31 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
| LEED 2012 3rd Public Comment Period Announced | - |
by Tristan Roberts Wed, Feb 15, 2012 |
|
RE: Team Members Blocked from accessing the Project in Owner team member and signatories |
12 |
Mairead Morrissey Principal Environmental Consultant AWN Consulting Ltd Mon, Feb 13, 2012 |
|
RE: project budget in Budget and Historic Project Data |
3 |
Emily Catacchio Sustainability Specialist Wight and Company Wed, Jan 25, 2012 |
| LEED Fellow | - |
by Heather Holdridge Wed, Jan 25, 2012 |
|
Cost info on LEED EBOM in The Cost of LEED EBOM Re-certification |
3 |
James Doyle Owner ConServe Fri, Jan 20, 2012 |
| LEED Project Mechanical Engineer Volunteer Available | - |
by Matthew Lusardi Sat, Jan 14, 2012 |
|
Should be good to go in Eligibility for LEED AP exam |
2 |
Candace Small Thu, Jan 12, 2012 |
|
re: LEED Project Registration for Sports Facilities in LEED Project Registration for Sports Facilities |
1 |
David Posada Sustainability Manager GBD Architects Tue, Jan 10, 2012 |
|
RE: Dear All,
I am new on LEED in Existing Building with an outbuilding addition |
3 |
David Posada Sustainability Manager GBD Architects Tue, Jan 10, 2012 |
| LEED Certification Project Submittal Tips from GBCI | - |
by Tristan Roberts Wed, Jan 4, 2012 |
|
Credit Specific in How to group multiple buildings? |
2 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Jan 3, 2012 |
|
Good Day,
Except for EAP2 and in List of performance period lengths |
1 |
Jubilee Daniels, MLA, LEED AP O+M Consultant, Sustainable Buildings and Operations Jubilee Environmental Consulting Tue, Jan 3, 2012 |
|
L-3 form in LEED Databases |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Dec 30, 2011 |
|
RE: Yes in Water Efficiency - Water Meter requirement |
2 |
Natalie Tan Thu, Dec 29, 2011 |
|
RE: IES vs other software in Has anyone done LEED energy modelling using Integrated Environmental Solutions (IES) software |
2 |
Sauraj Gautam Business Development Manager IES LTD. Sun, Dec 25, 2011 |
|
Re: LEED for Existing Buildings - Tenant Space in LEED for Existing Buildings - Tenant Space |
1 |
David Posada Sustainability Manager GBD Architects Tue, Dec 20, 2011 |
|
late submission in Submission Timeline |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Dec 18, 2011 |
|
RE: Spec Sections vs. LEED Credits checklist? in How to "Green" Specs on LEED Projects |
8 |
Susan Walter Sr Project Architect Wilmot/Sanz Thu, Dec 15, 2011 |
|
RE: LEED certification deadline in Deadline to Submit Construction Submittal - LEED NC (LEED for Schools) |
3 |
Francis Chua Project Architect Nadaskay Kopelson Architects Tue, Dec 13, 2011 |
|
Consistency, Consistency, Consistency in Changes to Recognition Package for Pre-LEED 2009 Certified Projects |
10 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Thu, Dec 8, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Recycling Insulation in NC 2009 MRc2: Construction Waste Management |
162 | 255 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Thu, Jan 28, 2010 |
|
RE: Rock Ballasting in EBOM 2009 MRc9: Solid Waste Management—Facility Alterations and Additions |
162 | 18 |
Jenny Carney Principal YR&G Mon, Dec 28, 2009 |
|
Rock Ballasting in EBOM 2009 MRc9: Solid Waste Management—Facility Alterations and Additions |
158 | 18 |
Chris Munn Director, National Operations Chelsea Group, Ltd. Mon, Dec 28, 2009 |
|
100% recycling rate claims in NC 2009 MRc2: Construction Waste Management |
151 | 255 |
Yancy Wright Director Sellen Sustainability / Sellen Construction Wed, Jan 13, 2010 |
|
RE: Where does Interior Plant Maintenance fit into IPM? in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
151 | 42 |
Drew Johnson LEED AP O+M Wed, Jan 27, 2010 |
|
RE: Where does Interior Plant Maintenance fit into IPM? in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
149 | 42 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 27, 2010 |
|
RE: FSC Timber outside of the US in NC 2009 MRc7: Certified Wood |
147 | 245 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 27, 2010 |
|
Recycling Insulation in NC 2009 MRc2: Construction Waste Management |
143 | 255 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Mon, Jan 25, 2010 |
|
RE: Where does Interior Plant Maintenance fit into IPM? in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
140 | 42 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 27, 2010 |
|
Where does Interior Plant Maintenance fit into IPM? in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
136 | 42 |
Drew Johnson LEED AP O+M Mon, Jan 25, 2010 |
|
RE: Core fixtures included? in CI 2009 WEp1: Water Use Reduction—20% Reduction |
134 | 175 |
Devon Bertram Sustainability Manager YR&G Fri, Sep 11, 2009 |
|
RE: Where does Interior Plant Maintenance fit into IPM? in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
134 | 42 |
Shira Norman YRG sustainability Mon, Jan 25, 2010 |
|
FSC Timber outside of the US in NC 2009 MRc7: Certified Wood |
124 | 245 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Mon, Jan 25, 2010 |
|
Re-used wood in NC 2009 MRc7: Certified Wood |
121 | 245 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Mon, Jan 25, 2010 |
|
RE: 100% recycling rate claims in NC 2009 MRc2: Construction Waste Management |
117 | 255 |
Valerie Walsh Sustainable Design & Construction Consultants Walsh Sustainability Group Fri, Jan 15, 2010 |
|
RE: calculation of Cr 6.1 Stormwater design-Quantity Control in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
116 | 139 |
JP Rout Wed, Jan 6, 2010 |
|
Is it worth it? Maybe. in NC 2009 MRc7: Certified Wood |
116 | 245 |
Kenley Kyle Sen. Sales Engineer Sigler Inc. Wed, Oct 14, 2009 |
|
calculation of Cr 6.1 Stormwater design-Quantity Control in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
112 | 139 |
Gregory Hurst Office Manager Robert Peccia & Associates Tue, Jan 5, 2010 |
|
Local zoning requires no parking in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
111 | 88 |
Michael Miller Project Architect Thu, Sep 9, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
108 | 56 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 21, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
MRc5 Calculator Question in Healthcare-v2009: Furniture and medical furnishings |
5 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Thu, May 2, 2013 |
|
Tenant Guidelines for Large Project in MPR2: Must be a complete, permanent building or space |
46 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Wed, May 1, 2013 |
|
Doing both the Level II assessment and credit EA2.3 "ongoing Cx" in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning |
26 |
Tom Kennedy Thomas E Kennedy, PE Wed, May 1, 2013 |
|
Rainwater storage system in EBOM-2009 WEc3: Water Efficient Landscaping |
92 |
Karin Wohlert Northwest Sustainability Consulting, LLC Wed, May 1, 2013 |
|
Amendnment to existing Lease Agreement in PIf5: Building System Control |
6 |
Jay Murray LEED Administrator Commercial Construction Consulting Wed, May 1, 2013 |
|
Chiller in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
53 |
Victor Avedano Principal JALRW Eng. Group Inc. Wed, May 1, 2013 |
|
Does a Real Estate Tax is in CI 2009 MRc1.1: Tenant Space—Long-Term Commitment |
29 |
Joseph Goldstein JGArchitects Tue, Apr 30, 2013 |
|
What is a self-reported course that qualifies for CMP in LEED AP Credential Maintenance: Tips from GBCI and LEEDuser |
1 |
Todd Bundren Associate Lawrence Group Tue, Apr 30, 2013 |
|
Pilot Credit 10 in Pilot Credit 10: Sustainable Wastewater Management |
37 |
Alicia Silva CEO Revitaliza consultores Tue, Apr 30, 2013 |
|
Cistern doesn't fulfull need, but there is no-potable backup in NC 2009 WEc1: Water Efficient Landscaping |
239 |
Sarah Picking Tue, Apr 30, 2013 |
|
Supplementary ventilation for after-hours in CI-2009 IEQp1: Minimum IAQ Performance |
99 |
Diana Nezamutinova Associate Dalen Strategies Mon, Apr 29, 2013 |
|
All LEED sample forms in Sample LEED Online credit forms |
3 |
E H Sustainability Architect Mon, Apr 29, 2013 |
|
Epoxy Finishes in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
339 |
Shaun Andriano Project Manager C2 Design Architecture Mon, Apr 29, 2013 |
|
deleted in NC 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
167 |
Ameet AA Mon, Apr 29, 2013 |
|
Questions in Pilot Credit 10: Sustainable Wastewater Management |
37 |
Lolita Wu Sun, Apr 28, 2013 |
|
Blower Door Testing - Multi Unit Residential Building in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control |
47 |
Erin Norton Fri, Apr 26, 2013 |
|
Pilot Credit 10 in Pilot Credit 10: Sustainable Wastewater Management |
37 |
Alicia Silva CEO Revitaliza consultores Fri, Apr 26, 2013 |
|
We are working on food in CI-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements |
49 |
Elizabeth Powers Principal O'Brien & Company Fri, Apr 26, 2013 |
|
Average Pressure Differential Calculation - Underground Parking in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
64 |
Nathan Lee Project Engineer SGS Korea Fri, Apr 26, 2013 |
|
low emittig count for green vehicles? in NC-2009: Green vehicles |
4 |
Albert Sagrera Architect Societat Organica Thu, Apr 25, 2013 |
Copyright 2013 – BuildingGreen, Inc.