LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: No HVAC / Natural Ventilation - Unmet Hrs in NC 2009 EAp2: Minimum Energy Performance |
1,379 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
117 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
RE: Does casework count for MR4, MR5 and MR7? in Schools 2009 MRc7: Certified Wood |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Derek Sylvia Thu, May 23, 2013 |
|
RE: Potential crossover credit from New Construction to Schools? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
38 |
James Leonard via Buro Happold Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Level II audit in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis |
36 |
David Hubka Director - Operations Transwestern Sustainability Services Fri, Feb 22, 2013 |
|
RE: Scored High in Prerequisite in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
96 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Fri, Feb 22, 2013 |
|
lighting controls in Retail–CI-v2009: Optimize energy performance - lighting controls |
1 |
ARGIA ARROYO BUGANZA Thu, Feb 21, 2013 |
|
RE: About the "Multi-tenant difficulty" in SSc8 in EBOM 2009 SSc8: Light Pollution Reduction |
82 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Feb 20, 2013 |
|
RE: applicability of the project in CI 2009 IEQc7.2: Thermal Comfort—Verification |
18 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 19, 2013 |
|
RE: LEED for Schools Credit 4.6 - question about roofing insulation in Schools IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems |
57 |
Eri Spaulding Ashley McGraw Architects Mon, Feb 18, 2013 |
|
RE: Can you earn SSc1 opt 2 RP credits if only pursing SSc1 opt 1? in CI 2009 RPc1: Regional Priority |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Feb 15, 2013 |
|
Option 2: EV Capacity per Station in Retail–CI-v2009: Alternative transportation |
1 |
Richard Manning Principal Green Building Services Wed, Feb 13, 2013 |
|
Thermal Zones in Healthcare-v2009: Minimum energy performance |
2 |
Attiq Rahman Energy Engineer Wed, Feb 13, 2013 |
|
RE: Weighted approach / SRI below 78 in EBOM 2009 SSc7.2: Heat Island Reduction—Roof |
58 |
Mary Ann Santos Wed, Feb 13, 2013 |
|
RE: Refrigerant Charge in NC v2.2 EAc4: Enhanced Refrigerant Management |
17 |
Ante Vulin Sustainability Manager YR&G Tue, Feb 12, 2013 |
|
Space by Space method in Retail–CI-v2009: Minimum energy performance |
5 |
Tejaswi Damaraju Tue, Feb 12, 2013 |
|
RE: LEED AP working from an other city in Retail–CI-v2009: LEED Accredited Professional |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Feb 9, 2013 |
|
EAc7 Community Contaminant Prevention - Airborne Releases in Pilot Credit 27: Reconcile Projected and Actual Energy Performance |
11 |
Andrew Gil Architect, Associate, LEED AP BD+C. USGBC NY Upstate Board of Directors HOLT Architects, P.C. Fri, Feb 8, 2013 |
|
RE: Green roof and landscaping in NC 2009 MRc6: Rapidly Renewable Materials |
41 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Thu, Feb 7, 2013 |
|
RE: IDc1.2-Low Emitting Furniture in NC v2.2 IDc1: Innovation in Design |
116 |
NA AN Wed, Feb 6, 2013 |
|
RE: buidable land in ND-v2009: Steep slope protection |
8 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Wed, Feb 6, 2013 |
|
RE: Furniture Donations and Reuse in CI 2009 MRc2: Construction Waste Management |
54 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, Feb 5, 2013 |
|
RE: New RP threshold for EAp1? in EBOM 2009 RPc1: Regional Priority |
44 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 5, 2013 |
|
RE: Metering faucet for Ktchen sink in Retail–NC-v2009: Water use reduction |
4 |
Richard Manning Principal Green Building Services Tue, Feb 5, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: maintaining LEED certification in Certified Building - maintaining certification for LEED v2.2 buildings |
2 |
Pinky Khatri Designer/Sustainability Coordinator VBN Architects Tue, Mar 8, 2011 |
|
Appeal documentation in Standard Template/Format for submitting Credit Appeal and Clarification |
1 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Tue, Mar 8, 2011 |
|
DSIRE... in Tax Credits and Incentives in California |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 7, 2011 |
|
webcast in Energy Benchmarking in LEED-EBOM Webinar |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 3, 2011 |
|
RE: context in Major Renovation - Definition |
2 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Mon, Feb 28, 2011 |
|
RE: i've been a usgbc employee for almost 9 years... in New Plaintiffs Join Amended LEED Lawsuit |
24 |
Bill Swanson PE, LEED AP Integrated Architecture Fri, Feb 25, 2011 |
|
list of required signatories in Required Signatory |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 22, 2011 |
|
RE: LEED-NC alteration in Minor Renovation of an Existing LEED Certified Building |
2 |
Norma Rosowski Sustainability Consultant The Beck Group Fri, Feb 18, 2011 |
|
RE: "Platinum" green credential? in LEED to Award Points for Non-LEED Credentials |
6 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, Feb 17, 2011 |
| Live Webcast: Essential tips for energy benchmarking in LEED-EBOM EAp2 and EAc1 | - |
by Tristan Roberts Sat, Feb 26, 2011 |
|
RE: list of required signatories in Required Signatory |
5 |
Peter Kennedy LEED AP, GreenPoint Rater Bright Green Strategies Wed, Feb 16, 2011 |
|
Hi Rachael,
I'm not in Police Station -- how to calculate the FTE for detainees? |
1 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, Feb 11, 2011 |
|
RE: parking garages and LEED in LEED Certification for Parking Garages |
9 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Feb 10, 2011 |
|
RE: EAc6 forum in Purchasing REC in Appeals phase |
2 |
Dana Dinolfo Assistant Property Manager Cassidy Turley Thu, Feb 10, 2011 |
| Forum updates make LEEDuser forum easier, more powerful | - |
by Tristan Roberts Wed, Feb 9, 2011 |
|
RE: Nice addition to the site in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Feb 9, 2011 |
| LEED 2012 Points—or, How we’ll eventually get points | - |
by Emily Catacchio Mon, Aug 13, 2012 |
|
RE: Re: Vertical Garden and credits SS 5.1 & 7? in Vertical Garden and credits SS 5.1 & 7? |
2 |
Luis Miguel Diazgranados Green Factory Mon, Feb 7, 2011 |
|
Tobie, yes, you'll need to in Version 2 Commerical Interiors - Credits under Energy & Atmosphere |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Feb 3, 2011 |
|
New LEED CI Project information form in LEED CI in existing commercial space with expansion |
1 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Thu, Feb 3, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
HERS Rater in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
75 | 189 |
David Herrera Architect Maiz Transforma Mon, Sep 13, 2010 |
|
VOC Budget - General Question in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
75 | 287 |
Jonathan Weiss Thu, Aug 12, 2010 |
|
RE: Peak Transients in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
75 | 157 |
Mara Baum Healthcare Sustainable Design Leader HOK Wed, Jan 27, 2010 |
|
RE: Off-site sorting and land clearing debris in CS 2009 MRc2: Construction Waste Management |
75 | 49 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 28, 2010 |
|
Glass Fiber Reinforced Concrete in NC 2009 MRc5: Regional Materials |
75 | 143 |
Linda Davisson Senior Consultant Sustainable Design Consulting Fri, Sep 17, 2010 |
|
All weather pathways? in Pilot Credit 9: Street Network |
75 | 67 |
Cory Benson Managing Director Made Sustainable Mon, Sep 27, 2010 |
|
RE: ASHRAE 62.1 and Kitchen Ventilation in High-Rise Residential in NC-2009 IEQp1: Minimum IAQ Performance |
75 | 467 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 24, 2010 |
|
RE: CI V3 - IEQp1 Uploads in CI-2009 IEQp1: Minimum IAQ Performance |
75 | 96 |
Roger Chang Principal, Director of Sustainability Westlake Reed Leskosky Mon, Aug 30, 2010 |
|
RE: EAc2.1 and EAc2.2 performance periods and compliance in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation |
75 | 32 |
Pierce Holstrom Director of Engineering Environmental Building Strategies Tue, Sep 28, 2010 |
|
RE: Are Occupancy Sensors alone sufficient? in NC 2009 SSc8: Light Pollution Reduction |
74 | 397 |
Jonathan Weiss Tue, Sep 28, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
74 | 61 |
Jennifer Jewell Project Manager/Project Architect Design Collective, Inc. Wed, Sep 8, 2010 |
|
RE: No Green Products available in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan |
74 | 51 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 20, 2010 |
|
RE: Energy Modeling and Process Energy in NC v2.2 EAp2: Minimum Energy Performance |
74 | 174 |
Ran Zhang LEED Consultant Mon, Sep 27, 2010 |
|
RE: Metering in EBOM 2009 WEc1: Water Performance Measurement |
74 | 66 |
Natalie Bodenhamer Associate Altura Associates, Inc. Thu, Sep 16, 2010 |
|
Utilizing this as an ID Credit for New Construction in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
74 | 77 |
Chris Ladner Partner Viridian Tue, Dec 22, 2009 |
|
RE: PFc Occupant Experience Survey in Comment on the New LEED Rating System Draft to be Released in 2012 |
74 | 97 |
David Smith Fri, Jan 14, 2011 |
|
RE: PFc Occupant Experience Survey in Comment on the New LEED Rating System Draft to be Released in 2012 |
74 | 97 |
Aaron Desatnik Mon, Jan 31, 2011 |
|
RE: Smoking area in retail area in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
73 | 189 |
GABRIEL MORALES Architect Grupo Syasa Fri, Sep 10, 2010 |
|
RE: CASE 2 vegetated roof inclusion subject to earning SSc2? in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
73 | 140 |
David Posada Sustainability Manager GBD Architects Wed, Aug 11, 2010 |
|
RE: Interior lighting for residential project in NC 2009 SSc8: Light Pollution Reduction |
73 | 397 |
Bill Swanson PE, LEED AP Integrated Architecture Tue, Sep 28, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Irrigation efficiency for manual watering in EBOM-2009 WEc3: Water Efficient Landscaping |
92 |
Alicia Silva CEO Revitaliza consultores Mon, Dec 3, 2012 |
|
Lots of different solutions and alternatives to LEED Online in Living with LEED Online - quirks, bugs and hiccups |
103 |
Clinton Medbery Mon, Dec 3, 2012 |
|
SSc1: Previously Certified Projects in LEED for Existing Buildings Recertification Is Here |
7 |
Peter Locke Sustainability Consulting Director McKinstry Fri, Nov 30, 2012 |
|
LEEDuser's MRp2 template in EBOM 2009 MRp2: Solid Waste Management Policy |
18 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Nov 27, 2012 |
|
Gross SF Option in CI 2009 EAp2: Minimum Energy Performance |
367 |
Sheela I Tue, Nov 27, 2012 |
|
Helpful in A Guide to the Key LEED-CI v2009 Addenda |
1 |
Geoffrey Eddy PE, LEED AP GHT Limited Tue, Nov 27, 2012 |
|
Automatic Controls Being Challenged in NC 2009 WEc3: Water Use Reduction |
73 |
Hernando Miranda Owner Soltierra LLC Mon, Nov 26, 2012 |
|
ACP EN standards in CS.IEQp1 and CS.IEQc2 in CS 2009 IEQc2: Increased Ventlilation |
3 |
Petr Vogel Specialist Consultant EkoWATT CZ Fri, Nov 23, 2012 |
|
please use our specific MPR forums in LEED Minimum Program Requirements |
428 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Nov 23, 2012 |
|
site boundary forum - MPR3 in Site Boundary |
69 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 22, 2012 |
|
LEED credit achievement in Credit Achievement Tally |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 22, 2012 |
|
Project Information (PI) forums in Project Information form |
45 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Nov 21, 2012 |
|
delete in Schools 2009 EAp2: Minimum Energy Performance |
42 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Tue, Nov 20, 2012 |
|
Clean Room Protocol and SMACNA standards in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
70 |
Mark Wilhelm Principal Green Ideas, Inc. Thu, Nov 15, 2012 |
|
Electric Bike Fleets are ZEV's so... in Healthcare-v2009: Alternative transportation - bicycle storage and changing rooms |
1 |
John Chinnery Fleet Facilitator Small Planet E Vehicles Thu, Nov 15, 2012 |
|
Licensed Professional Exemption in Licensed Professional Exemption |
18 |
Ameet AA Thu, Nov 15, 2012 |
|
Naturally Ventilated Space in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
200 |
Orlin Velinov, PE Mechanical Engineer Termo Aire, LTDA Wed, Nov 14, 2012 |
|
Accessibility for Seniors in Pilot Credit 34: Design for Adaptability |
7 |
Lance Hillegas VP of Design & Sustainable Development The Hankin Group Fri, Nov 9, 2012 |
|
Legacy LEED AP in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bonnie Richardson AIA, LEED AP Architect/Principal Planner City of Tempe Wed, Nov 7, 2012 |
|
Carpet tile approved as acceptable walk-off mat in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control |
37 |
Melissa Vernon Director of Sustainable Strategy Interface Tue, Nov 6, 2012 |
Copyright 2013 – BuildingGreen, Inc.