Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    356 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, May 18, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    RE: Percantage Make-Up
    in Healthcare-v2009: Sustainably sourced materials and products
    5 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 18, 2013
    RE: Casework
    in NC 2009 MRc7: Certified Wood
    238 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 17, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    255 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Fri, May 17, 2013
    RE: Good to know
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Paula Melton
    Managing Editor
    BuildingGreen, Inc.
    Fri, May 17, 2013
    RE: Building Envelope Commissioning LEED required test methodology
    in NC 2009 EAc3: Enhanced Commissioning
    169 Brett Farbstein
    Commissioning Engineer
    AKF Group
    Fri, May 17, 2013
    RE: Form Questions
    in Healthcare-v2009: Acoustic environment
    7 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Entry mat in vestibule w/ tile surround
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: Meaning of "Ready to Use Products"
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Alicia Silva
    CEO
    Revitaliza consultores
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    RE: LEV discounted parking
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    209 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    Title Comments Most Recent Post
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    356 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, May 18, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    RE: Percantage Make-Up
    in Healthcare-v2009: Sustainably sourced materials and products
    5 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 18, 2013
    RE: Casework
    in NC 2009 MRc7: Certified Wood
    238 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 17, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    255 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Fri, May 17, 2013
    RE: Building Envelope Commissioning LEED required test methodology
    in NC 2009 EAc3: Enhanced Commissioning
    169 Brett Farbstein
    Commissioning Engineer
    AKF Group
    Fri, May 17, 2013
    RE: Form Questions
    in Healthcare-v2009: Acoustic environment
    7 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Entry mat in vestibule w/ tile surround
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 17, 2013
    RE: Meaning of "Ready to Use Products"
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Alicia Silva
    CEO
    Revitaliza consultores
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    RE: LEV discounted parking
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    209 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Ventilated attic roofs - Baseline Vs Proposed
    in CS 2009 EAc1: Optimize Energy Performance
    207 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 17, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    111 Michael DeVuono
    T&M Associates
    Fri, May 17, 2013
    RE: Educational Program
    in CS 2009 IDc1: Innovation in Design
    42 Morteza Kasmaei
    Principal
    Climatic Design Inc.
    Fri, May 17, 2013
    Vertical addition to a hotel project
    in MPR2: Must be a complete, permanent building or space
    45 Adam Targowski
    Owner
    ATsec
    Fri, May 17, 2013
    RE: Determining FTE, PTE
    in PIf3: Occupant and Usage Data
    94 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Fri, May 17, 2013
    green roof cover - ivy
    in CS 2009 SSc7.2: Heat Island Effect—Roof
    83 Mario Pinoli
    Fri, May 17, 2013
    Room by Room flush-out Calculations
    in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
    124 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Thu, May 16, 2013
    Title Comments Most Recent Post
    RE: Good to know
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Paula Melton
    Managing Editor
    BuildingGreen, Inc.
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: Performance Period starts after construction
    in Performance Period
    40 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 16, 2013
    LEED Campus vs LEED Schools vs LEED NC
    in LEED Rating System Selection Q&A
    331 Caroline Hedin
    Thu, May 16, 2013
    RE: Deleted Uploads Reviewed
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    332 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 16, 2013
    RE: (Jacob) Calculating for Future Growth
    in Calculating FTEs
    135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 14, 2013
    RE: U-Value Units Conversion
    in International Projects - alternative compliance path
    116 Daniela Castro Salgado
    LEED AP BD+C / Sustainability Coordinator
    Edmonds International Ltd
    Tue, May 14, 2013
    RE: about that working group....
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Marian Keeler
    Senior Associate
    Thornton Tomasetti / Simon & Associates
    Mon, May 13, 2013
    RE: Cannot login to LEED Online..
    in Living with LEED Online - quirks, bugs and hiccups
    103 Francisca Herrera
    Miranda & Nasi
    Mon, May 13, 2013
    RE: V4 implementation and '09 phase out
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 10, 2013
    RE: Master Site and different buidings certifications
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Eric Anderson
    Technical Customer Service Specialist
    GBCI
    Fri, May 10, 2013
    LEED Signage for display inside Gold certified office building
    in Start a New LEED Discussion Topic
    9 Jeff Zunt
    THORSON BAKER & Associates, Inc
    Sun, May 5, 2013
    Tenant Sales or Lease Agreement
    in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
    19 Julie Hendricks
    Director of EcoServices
    Kirksey
    Sun, May 5, 2013
    RE: BD&C Exam Prep
    in Earn CEUs on LEEDuser—With Ease
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 30, 2013
    RE: What is a self-reported course that qualifies for CMP
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    40 Erin Emery Hartz
    Manager, Marketing & Product Development
    U.S. Green Building Council
    Tue, Apr 30, 2013
    RE: new database
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    27 Elizabeth Thompson
    LEED Specialist
    USGBC
    Mon, Apr 29, 2013
    All LEED sample forms
    in Sample LEED Online credit forms
    3 E H
    Sustainability Architect
    Mon, Apr 29, 2013
    RE: Title-24 and DES
    in New District Energy Guidance for LEED Released by USGBC
    36 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Wed, Apr 24, 2013
    RE: Can you submit Design Appeal after Construction?
    in Review Appeal
    22 ERIC WANG
    Mon, Apr 22, 2013
    RE: Licensed Professional Exemption (LPE) - outside of USA
    in Licensed Professional Exemption
    18 John Covello
    LEED and Sustainability Manager
    Development Management Group
    Mon, Apr 22, 2013
    Title Votes Comments Most Recent Post
    Addenda changes and project schedules- compliance cut-off dates?
    in USGBC releases April 2010 LEED addenda – changes to rating systems, Reference Guides
    9 2 Patricia Hancock
    Sustainability Director
    SMPC Architects
    Thu, Jul 7, 2011
    RE: Doesn't replace Standards 62.1 and 90.1
    in Ashrae standard 189.1, Total building sustainability package
    9 5 Mike Barker
    Principal : Energy / Electrical Engineer
    BuildingPhysics South Africa
    Fri, Jul 8, 2011
    RE: Re: LEED Online + Documentation
    in LEED Online + Documentation
    9 5 S D
    Tue, Jun 21, 2011
    Automation Session at Greenbuild Shows Potential
    in LEED App Store Coming Soon – What's on Your Wish-List?
    9 3 Nadav Malin
    USGBC LEED Faculty, President
    BuildingGreen, Inc.
    Wed, Oct 12, 2011
    RE: Alen A350 air purifier
    in Air purification
    9 7 Karen Tucker
    Director of Customer Development
    iLiv
    Thu, May 20, 2010
    check with GBCI
    in Block Team Administration
    9 2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 22, 2011
    RE: Public LEED Project Directory
    in LEED CI - PI form 5
    9 2 Sheela I
    Thu, Sep 22, 2011
    rating system and credit
    in Calculating Waste Diversion Rates for a Modular Factory
    9 3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 6, 2011
    RE: rating system and credit
    in Calculating Waste Diversion Rates for a Modular Factory
    9 3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 21, 2011
    RE: In the past, the published
    in How long does it take for USGBC to do the LEED design & construction review?
    9 5 Susann Geithner
    Director of Sustainability
    HSB Architects & Engineers
    Fri, Sep 9, 2011
    RE: Re: Cancellation of project review
    in Regarding Cancellation of project review
    9 4 Monu Goyal
    Environmental Engineer
    Metadesign Architects Pvt. Ltd.
    Sat, Jul 30, 2011
    RE: Re: Cancellation of project review
    in Regarding Cancellation of project review
    9 4 Monu Goyal
    Environmental Engineer
    Metadesign Architects Pvt. Ltd.
    Thu, Aug 4, 2011
    RE: Re: Promotional code
    in How to get a promotional code?
    9 8 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Wed, Jul 27, 2011
    RE: LEED Automation
    in LEED Automation
    9 4 John Albrecht
    Director of LEED Services
    Sieben Energy Assoc.
    Tue, Jul 12, 2011
    2 buildings on one site, one equipment, etc
    in Two buildings on one site, one equipment, and only one building pursuing LEED
    9 3 Barry Giles
    Founder & CEO, USGBC LEED Faculty, LEED AP O+M
    BuildingWise LLC
    Thu, Jul 7, 2011
    RE: 2 buildings on one site, one equipment, etc
    in Two buildings on one site, one equipment, and only one building pursuing LEED
    9 3 Jim Park
    Fri, Jul 8, 2011
    RE: 2 buildings on one site, one equipment, etc
    in Two buildings on one site, one equipment, and only one building pursuing LEED
    9 3 Barry Giles
    Founder & CEO, USGBC LEED Faculty, LEED AP O+M
    BuildingWise LLC
    Fri, Jul 8, 2011
    From USGBC Website
    in Bank - branches
    9 1 Candace Small
    Thu, Jun 2, 2011
    RE: v2.1 certification
    in Submitting Documentation for LEED NC v2.1 - With Today's Reviewers
    9 2 Brittany Eldredge
    Fri, May 20, 2011
    USGBC customer service
    in project owner's name changed
    9 1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 20, 2011
    Title Comments Most Recent Post
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    Vertical addition to a hotel project
    in MPR2: Must be a complete, permanent building or space
    45 Adam Targowski
    Owner
    ATsec
    Fri, May 17, 2013
    green roof cover - ivy
    in CS 2009 SSc7.2: Heat Island Effect—Roof
    83 Mario Pinoli
    Fri, May 17, 2013
    Room by Room flush-out Calculations
    in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
    124 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Thu, May 16, 2013
    Who develops the plan for corrective action?
    in NC 2009 IEQc7.2: Thermal Comfort—Verification
    61 Nicole Kimoto
    Thu, May 16, 2013
    Allowable VOC
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Mike Stopka
    Director of Sustainability
    Solomon Cordwell Buenz
    Thu, May 16, 2013
    LEED Campus vs LEED Schools vs LEED NC
    in LEED Rating System Selection Q&A
    331 Caroline Hedin
    Thu, May 16, 2013
    Comprehensive waste management program
    in CS 2009 MRp1: Storage and Collection of Recyclables
    31 Michael E. Edmonds-Bauer
    Edmonds International
    Thu, May 16, 2013
    "wood wars"
    in NC 2009 MRc7: Certified Wood
    238 Doreen Kruschina
    Doreen Kruschina Planung+Baumanagement
    Thu, May 16, 2013
    Municipal tertiary treated water transported in on tankers?
    in NC 2009 WEc1: Water Efficient Landscaping
    234 Natalie Tan
    Thu, May 16, 2013
    Material reuse based on cost or volume
    in NC 2009 MRc3: Materials Reuse
    45 Mahbuba Khan
    President
    MnKhan Architects PLLC
    Thu, May 16, 2013
    Non-US Projects
    in CI 2009 IEQc2: Increased Ventilation
    5 Phillip Cook
    WGE
    Wed, May 15, 2013
    LEED vs Global Green vs The next rating system
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Wyan DeFilippo
    LEED AP BD+C
    Green Work Experience
    Wed, May 15, 2013
    Property Boundry.
    in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
    1 Phillip Cook
    WGE
    Wed, May 15, 2013
    Timeline on reports
    in EBOM 2009 EAp3: Fundamental Refrigerant Management
    55 Hugh Hagues
    University Centers Assist. Director
    University of California, San Diego
    Wed, May 15, 2013
    Contact your senators!
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Michelle Robinson
    Re:Vision Architecture
    Wed, May 15, 2013

    Copyright 2013 – BuildingGreen, Inc.