LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
Submittal templates in metric Units in PIf1: Minimum Program Requirements |
66 |
BABAR MEHMOOD SAUD CONSULT Sat, May 25, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
109 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, May 24, 2013 |
|
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values in NC 2009 EAp2: Minimum Energy Performance |
1,381 |
TOMAS URIBE PROJECT MANAGER SOLUCIONES ENERGETICAS SOSTENIBLES Fri, May 24, 2013 |
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
RE: Gravel in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
167 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
RE: EA Credit 1 - Using available waste oil for heating in NC 2009 EAc1: Optimize Energy Performance |
821 |
Marcus Sheffer LEED Fellow 7group Fri, May 24, 2013 |
|
RE: Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
124 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Building Addition - reseeding turf grass - credit applicable in Schools 2009 WEc1: Water Efficient Landscaping |
24 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Feb 25, 2013 |
|
RE: Level II audit in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis |
36 |
David Hubka Director - Operations Transwestern Sustainability Services Fri, Feb 22, 2013 |
|
RE: Scored High in Prerequisite in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
96 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Fri, Feb 22, 2013 |
|
lighting controls in Retail–CI-v2009: Optimize energy performance - lighting controls |
1 |
ARGIA ARROYO BUGANZA Thu, Feb 21, 2013 |
|
RE: About the "Multi-tenant difficulty" in SSc8 in EBOM 2009 SSc8: Light Pollution Reduction |
82 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Feb 20, 2013 |
|
RE: applicability of the project in CI 2009 IEQc7.2: Thermal Comfort—Verification |
18 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 19, 2013 |
|
RE: LEED for Schools Credit 4.6 - question about roofing insulation in Schools IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems |
57 |
Eri Spaulding Ashley McGraw Architects Mon, Feb 18, 2013 |
|
RE: Can you earn SSc1 opt 2 RP credits if only pursing SSc1 opt 1? in CI 2009 RPc1: Regional Priority |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Feb 15, 2013 |
|
Option 2: EV Capacity per Station in Retail–CI-v2009: Alternative transportation |
1 |
Richard Manning Principal Green Building Services Wed, Feb 13, 2013 |
|
Thermal Zones in Healthcare-v2009: Minimum energy performance |
2 |
Attiq Rahman Energy Engineer Wed, Feb 13, 2013 |
|
RE: Weighted approach / SRI below 78 in EBOM 2009 SSc7.2: Heat Island Reduction—Roof |
58 |
Mary Ann Santos Wed, Feb 13, 2013 |
|
RE: Refrigerant Charge in NC v2.2 EAc4: Enhanced Refrigerant Management |
17 |
Ante Vulin Sustainability Manager YR&G Tue, Feb 12, 2013 |
|
Space by Space method in Retail–CI-v2009: Minimum energy performance |
5 |
Tejaswi Damaraju Tue, Feb 12, 2013 |
|
RE: LEED AP working from an other city in Retail–CI-v2009: LEED Accredited Professional |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Feb 9, 2013 |
|
EAc7 Community Contaminant Prevention - Airborne Releases in Pilot Credit 27: Reconcile Projected and Actual Energy Performance |
11 |
Andrew Gil Architect, Associate, LEED AP BD+C. USGBC NY Upstate Board of Directors HOLT Architects, P.C. Fri, Feb 8, 2013 |
|
RE: Green roof and landscaping in NC 2009 MRc6: Rapidly Renewable Materials |
41 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Thu, Feb 7, 2013 |
|
RE: IDc1.2-Low Emitting Furniture in NC v2.2 IDc1: Innovation in Design |
116 |
NA AN Wed, Feb 6, 2013 |
|
RE: buidable land in ND-v2009: Steep slope protection |
8 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Wed, Feb 6, 2013 |
|
RE: Furniture Donations and Reuse in CI 2009 MRc2: Construction Waste Management |
54 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, Feb 5, 2013 |
|
RE: New RP threshold for EAp1? in EBOM 2009 RPc1: Regional Priority |
44 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 5, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: maintaining LEED certification in Certified Building - maintaining certification for LEED v2.2 buildings |
2 |
Pinky Khatri Designer/Sustainability Coordinator VBN Architects Tue, Mar 8, 2011 |
|
Appeal documentation in Standard Template/Format for submitting Credit Appeal and Clarification |
1 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Tue, Mar 8, 2011 |
|
DSIRE... in Tax Credits and Incentives in California |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 7, 2011 |
|
webcast in Energy Benchmarking in LEED-EBOM Webinar |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 3, 2011 |
|
RE: context in Major Renovation - Definition |
2 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Mon, Feb 28, 2011 |
|
RE: i've been a usgbc employee for almost 9 years... in New Plaintiffs Join Amended LEED Lawsuit |
24 |
Bill Swanson PE, LEED AP Integrated Architecture Fri, Feb 25, 2011 |
|
list of required signatories in Required Signatory |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 22, 2011 |
|
RE: LEED-NC alteration in Minor Renovation of an Existing LEED Certified Building |
2 |
Norma Rosowski Sustainability Consultant The Beck Group Fri, Feb 18, 2011 |
|
RE: "Platinum" green credential? in LEED to Award Points for Non-LEED Credentials |
6 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, Feb 17, 2011 |
| Live Webcast: Essential tips for energy benchmarking in LEED-EBOM EAp2 and EAc1 | - |
by Tristan Roberts Sat, Feb 26, 2011 |
|
RE: list of required signatories in Required Signatory |
5 |
Peter Kennedy LEED AP, GreenPoint Rater Bright Green Strategies Wed, Feb 16, 2011 |
|
Hi Rachael,
I'm not in Police Station -- how to calculate the FTE for detainees? |
1 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, Feb 11, 2011 |
|
RE: parking garages and LEED in LEED Certification for Parking Garages |
9 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Feb 10, 2011 |
|
RE: EAc6 forum in Purchasing REC in Appeals phase |
2 |
Dana Dinolfo Assistant Property Manager Cassidy Turley Thu, Feb 10, 2011 |
| Forum updates make LEEDuser forum easier, more powerful | - |
by Tristan Roberts Wed, Feb 9, 2011 |
|
RE: Nice addition to the site in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Feb 9, 2011 |
| LEED 2012 Points—or, How we’ll eventually get points | - |
by Emily Catacchio Mon, Aug 13, 2012 |
|
RE: Re: Vertical Garden and credits SS 5.1 & 7? in Vertical Garden and credits SS 5.1 & 7? |
2 |
Luis Miguel Diazgranados Green Factory Mon, Feb 7, 2011 |
|
Tobie, yes, you'll need to in Version 2 Commerical Interiors - Credits under Energy & Atmosphere |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Feb 3, 2011 |
|
New LEED CI Project information form in LEED CI in existing commercial space with expansion |
1 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Thu, Feb 3, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Off-site sorting and land clearing debris in CS 2009 MRc2: Construction Waste Management |
75 | 49 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 28, 2010 |
|
RE: EAc2.1 and EAc2.2 performance periods and compliance in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation |
75 | 32 |
Pierce Holstrom Director of Engineering Environmental Building Strategies Tue, Sep 28, 2010 |
|
Exemplary Performance for EA Cr3 Enhanced Commissioning in NC 2009 EAc3: Enhanced Commissioning |
75 | 172 |
deborah lucking Fri, Sep 24, 2010 |
|
RE: Exemplary Performance for EA Cr3 Enhanced Commissioning in NC 2009 EAc3: Enhanced Commissioning |
75 | 172 |
deborah lucking Fri, Sep 24, 2010 |
|
VOC Budget - General Question in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
75 | 287 |
Jonathan Weiss Thu, Aug 12, 2010 |
|
HERS Rater in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
75 | 189 |
David Herrera Architect Maiz Transforma Mon, Sep 13, 2010 |
|
Glass Fiber Reinforced Concrete in NC 2009 MRc5: Regional Materials |
75 | 143 |
Linda Davisson Senior Consultant Sustainable Design Consulting Fri, Sep 17, 2010 |
|
RE: Peak Transients in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
75 | 157 |
Mara Baum Healthcare Sustainable Design Leader HOK Wed, Jan 27, 2010 |
|
RE: ASHRAE 62.1 and Kitchen Ventilation in High-Rise Residential in NC-2009 IEQp1: Minimum IAQ Performance |
75 | 467 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 24, 2010 |
|
All weather pathways? in Pilot Credit 9: Street Network |
75 | 67 |
Cory Benson Managing Director Made Sustainable Mon, Sep 27, 2010 |
|
RE: PFc Occupant Experience Survey in Comment on the New LEED Rating System Draft to be Released in 2012 |
74 | 97 |
David Smith Fri, Jan 14, 2011 |
|
RE: PFc Occupant Experience Survey in Comment on the New LEED Rating System Draft to be Released in 2012 |
74 | 97 |
Aaron Desatnik Mon, Jan 31, 2011 |
|
Utilizing this as an ID Credit for New Construction in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
74 | 77 |
Chris Ladner Partner Viridian Tue, Dec 22, 2009 |
|
RE: No Green Products available in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan |
74 | 51 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 20, 2010 |
|
RE: Metering in EBOM 2009 WEc1: Water Performance Measurement |
74 | 66 |
Natalie Bodenhamer Associate Altura Associates, Inc. Thu, Sep 16, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
74 | 61 |
Jennifer Jewell Project Manager/Project Architect Design Collective, Inc. Wed, Sep 8, 2010 |
|
RE: Are Occupancy Sensors alone sufficient? in NC 2009 SSc8: Light Pollution Reduction |
74 | 397 |
Jonathan Weiss Tue, Sep 28, 2010 |
|
RE: Energy Modeling and Process Energy in NC v2.2 EAp2: Minimum Energy Performance |
74 | 175 |
Ran Zhang LEED Consultant Mon, Sep 27, 2010 |
|
eligibility for projects with no HVAC in scope in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
73 | 200 |
Victoria Lockhart Arup Associates Tue, Sep 28, 2010 |
|
RE: eligibility for projects with no HVAC in scope in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
73 | 200 |
Mark Benson Tue, Sep 28, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Suggestion for an alternative transition between V3 & V4 in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Rob Watson CEO EcoTech International Sun, Dec 9, 2012 |
|
The What vs. The How in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Rob Watson CEO EcoTech International Sun, Dec 9, 2012 |
|
What will the fixes be for LEED Online V4? in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Rob Watson CEO EcoTech International Sun, Dec 9, 2012 |
|
Green Vehicles for Warehouse and distribution centers in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Rob Watson CEO EcoTech International Sat, Dec 8, 2012 |
|
Where did EBOM IOc3 go? in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, Dec 7, 2012 |
|
Contractor specification template software or forms in NC 2009 MRc2: Construction Waste Management |
253 |
John Covello LEED and Sustainability Manager Development Management Group Wed, Dec 5, 2012 |
|
Irrigation efficiency for manual watering in EBOM-2009 WEc3: Water Efficient Landscaping |
92 |
Alicia Silva CEO Revitaliza consultores Mon, Dec 3, 2012 |
|
Lots of different solutions and alternatives to LEED Online in Living with LEED Online - quirks, bugs and hiccups |
103 |
Clinton Medbery Mon, Dec 3, 2012 |
|
SSc1: Previously Certified Projects in LEED for Existing Buildings Recertification Is Here |
7 |
Peter Locke Sustainability Consulting Director McKinstry Fri, Nov 30, 2012 |
|
LEEDuser's MRp2 template in EBOM 2009 MRp2: Solid Waste Management Policy |
18 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Nov 27, 2012 |
|
Gross SF Option in CI 2009 EAp2: Minimum Energy Performance |
367 |
Sheela I Tue, Nov 27, 2012 |
|
Helpful in A Guide to the Key LEED-CI v2009 Addenda |
1 |
Geoffrey Eddy PE, LEED AP GHT Limited Tue, Nov 27, 2012 |
|
Automatic Controls Being Challenged in NC 2009 WEc3: Water Use Reduction |
73 |
Hernando Miranda Owner Soltierra LLC Mon, Nov 26, 2012 |
|
ACP EN standards in CS.IEQp1 and CS.IEQc2 in CS 2009 IEQc2: Increased Ventlilation |
3 |
Petr Vogel Specialist Consultant EkoWATT CZ Fri, Nov 23, 2012 |
|
please use our specific MPR forums in LEED Minimum Program Requirements |
428 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Nov 23, 2012 |
|
site boundary forum - MPR3 in Site Boundary |
69 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 22, 2012 |
|
LEED credit achievement in Credit Achievement Tally |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 22, 2012 |
|
Project Information (PI) forums in Project Information form |
45 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Nov 21, 2012 |
|
delete in Schools 2009 EAp2: Minimum Energy Performance |
42 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Tue, Nov 20, 2012 |
|
Clean Room Protocol and SMACNA standards in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
70 |
Mark Wilhelm Principal Green Ideas, Inc. Thu, Nov 15, 2012 |
Copyright 2013 – BuildingGreen, Inc.