Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Same firm as sub-contractor and CxA
    in NC 2009 EAc3: Enhanced Commissioning
    172 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    Park & Community Centers = Services?
    in Schools 2009 SSc2: Development Density and Community Connectivity
    7 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    RE: Streamlined Path
    in NC 2009 SSc7.2: Heat Island Effect—Roof
    164 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Wed, May 22, 2013
    Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    118 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Wed, May 22, 2013
    RE: Exterior Envelope Commissioning
    in NC 2009 IDc1: Innovation in Design
    367 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    RE: Exterior window shades controllability
    in Healthcare-v2009: Controllability of systems - lighting
    2 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Roofing Adhesives, Sealants & Mastics
    in Healthcare-v2009: Low-emitting materials
    3 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Number of testing point
    in Healthcare-v2009: Construction IAQ management plan - before occupancy
    5 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    819 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    265 Joel McCreary
    Principal
    McCreary/Snow Architects, PA
    Wed, May 22, 2013
    WC's
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    156 CRolim Engenharia
    Wed, May 22, 2013
    RE: Flexible furniture layout
    in NC 2009 IEQc6.1: Controllability of Systems—Lighting
    171 Larissa Oaks
    Specialist, LEED
    USGBC
    Wed, May 22, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    33 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 22, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    101 Rebecca Grant
    Dull Olson Weekes - IBI Group Architects, Inc.
    Wed, May 22, 2013
    Title Comments Most Recent Post
    RE: For Higher Ed (or any other project type)
    in NC v2.2 EQc7.2: Thermal Comfort—Verification
    17 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Sun, Nov 25, 2012
    RE: LEED Homes Pilot Credit 29 - Gimme Point
    in Pilot Credit 29: Housing & Jobs Proximity
    20 Jon Texter
    President
    Essex General Construction, Inc.
    Thu, Jun 14, 2012
    RE: Legacy LEED AP
    in NC 2009 IDc2: LEED Accredited Professional
    35 Lorne Mlotek
    LEED AP BD+C
    LeadingGREEN
    Thu, Jun 14, 2012
    RE: Required Signatory IEQp2-1 form?
    in Schools 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    6 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Tue, Jun 12, 2012
    RE: No new parking in a big campus
    in Schools 2009 SSc4.4: Alternative Transportation—Parking Capacity
    19 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Jun 4, 2012
    RE: Combining Pathways
    in Pilot Credit 43: Certified Products
    21 Melissa Vernon
    Director of Sustainable Strategy
    Interface
    Mon, May 7, 2012
    RE: Control on a Store
    in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
    22 Sustentator Argentina
    Sustentator
    Tue, Mar 13, 2012
    RE: PIlot Credit 42
    in Pilot Credit 42: Integrated Process
    6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Feb 21, 2012
    RE: SCS Gold Certificate
    in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
    10 Josh Jacobs
    Technical Information & Public Affairs Manager
    UL Environment
    Fri, Feb 17, 2012
    RE: Toilet Partitions
    in NC v2.2 EQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
    27 Josh Jacobs
    Technical Information & Public Affairs Manager
    UL Environment
    Fri, Feb 3, 2012
    RE: Identify Indemnified
    in Pilot Credit 11: Chemical Avoidance in Building Materials
    32 Julie Hendricks
    Director of EcoServices
    Kirksey
    Thu, Jan 26, 2012
    Help with Submittal Documentation
    in Pilot Credit 4: Innovative Ventilation
    6 Erik Ruoff
    The Green Engineer, LLP
    Wed, Jan 25, 2012
    Upcoming Pilot Credit Webinar
    in Pilot Credit 15: Parking Reduction
    8 Chris Marshall
    Manager, LEED Technical Development
    U.S. Green Building Council
    Thu, Jan 5, 2012
    Webinar on Chemicals of Concern
    in Pilot Credit 54: Avoidance of Chemicals of Concern in Building Materials
    3 Sarah Buffaloe
    Specialist, LEED
    US Green Building Council
    Tue, Dec 11, 2012
    Webinar From USGBC
    in Pilot Credit 2: PBT Source Reduction—Dioxins and Halogenated Organic Compounds
    20 Sarah Buffaloe
    Specialist, LEED
    US Green Building Council
    Wed, Jan 4, 2012
    RE: LEED AP consistency
    in NC v2.2 IDc2: LEED Accredited Professional
    7 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, May 31, 2012
    RE: viscose
    in CI 2009 MRc6: Rapidly Renewable Materials
    10 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 20, 2011
    RE: What about for an initial interior fit-out?
    in Pilot Credit 20: Recycled Content for Non-Structural Materials
    10 Juan Ramos
    Project Manager
    Boulder Associates
    Tue, Nov 8, 2011
    RE: EAc6 review comment.
    in EBOM 2009 EAc6: Emissions Reduction Reporting
    26 Jason Franken
    Sustainability Professional
    Mon, Nov 7, 2011
    RE: Prerequisite Denied
    in CI 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    20 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Mon, Nov 7, 2011
    Title Comments Most Recent Post
    Re: owner adds work outside of LEED Site Area
    in owner adds work outside of LEED Site Area
    1 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Aug 26, 2010
    RE: Re: Recycling System
    in Recycling System to comply with Pre-Requisite
    5 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Aug 23, 2010
    RE: Re: Telepresence systems
    in We will be adding 5 Telepresence systems for our project in San Francisco. This will reduce air travel and commuting.
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Aug 20, 2010
    Re: Parking Garage
    in Parking Garage
    1 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Aug 19, 2010
    GB standards
    in issues about implementation of LEED in China
    3 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Wed, Aug 18, 2010
    Dr. Xing, In my opinion, I
    in About the Translation of Project Drawing
    1 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Tue, Aug 17, 2010
    RE: LEED-NC
    in Advice for buildings to be constructed in phases
    2 Dean Barone
    President
    Barone International
    Mon, Aug 16, 2010
    LEED validity for D&C systems
    in LEED Certification validity period
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Aug 16, 2010
    RE: contact GBCI
    in Change the registration information
    2 Fabio Frescia
    Sustainable Engineer
    Tue, Aug 10, 2010
    EAc1 forum
    in ASHRAE 2004 - versus ASHRAE 2007 - 90.1 Standard
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Aug 10, 2010
    RE: Re: Additional Building Added in Middle of Project
    in Additional Building Added in Middle of Project
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Aug 10, 2010
    RE: kitchen facilities and LEED rating system selection
    in Definition of Residential
    2 Larry Jones
    Associate
    Atelier Ten
    Fri, Aug 6, 2010
    LEED-CI credits on a LEED-EBOM project
    in Combined LEED EBO&M with LEED ID+C
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Aug 6, 2010
    Paperless Submittals - by Bruce Maine
    Thu, Aug 5, 2010
    tenant scope
    in Which area applies to a CI certification, especially according to shared (non-rented) areas
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Aug 5, 2010
    RE: LEED Reference Guide
    in Reference Guide
    2 Paul C
    Tue, Aug 3, 2010
    upgrading to LEED 2012 and fees
    in Project Registration
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Aug 3, 2010
    Hopefully eliminating the CBs will raise the quality of reviews
    in Clarification overkill
    1 Nadav Malin
    USGBC LEED Faculty, President
    BuildingGreen, Inc.
    Mon, Aug 2, 2010
    RE: RE: residential high rise: leed rating system selection
    in residential high rise: leed rating system selection
    4 stefano sani
    Fri, Jul 30, 2010
    a good thing but not a LEED thing
    in Possible points for reducing project scope?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Jul 29, 2010
    Title Votes Comments Most Recent Post
    50 % Pervious Pavement or Each Paver need to be 50% Pervious?
    in CI 2009 SSc1: Site Selection
    66 159 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Mon, Sep 13, 2010
    Default value for open grid paver.
    in CI 2009 SSc1: Site Selection
    66 159 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Mon, Sep 13, 2010
    Reference ET rates
    in NC 2009 WEc1: Water Efficient Landscaping
    66 236 mark peternell
    Fri, Mar 11, 2011
    RE: Unirrigated areas in Option 1
    in NC 2009 WEc1: Water Efficient Landscaping
    66 236 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Apr 8, 2011
    RE: Lighting power of roof garden.
    in NC 2009 SSc8: Light Pollution Reduction
    66 397 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Mon, Apr 2, 2012
    Nice addition to the site
    in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits
    65 12 Eric Johnson
    Associate
    Gardiner & Theobald
    Wed, Feb 2, 2011
    RE: just what I needed!
    in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits
    65 12 C Brokaw
    Architect
    Tue, Feb 8, 2011
    Actual VOC Content
    in Schools IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    65 22 Carmelito Tatlonghari
    LEED-AP BD+C
    Leighton Contractors Philippines, Inc.
    Tue, Jul 27, 2010
    RE: Space Usage Types
    in EBOM 2009 SSc1: LEED Certified Design and Construction
    65 26 Jenny Carney
    Principal
    YR&G
    Wed, Aug 25, 2010
    RE: Documented benefits as a result of LEED for Existing Buildings
    in LEED-EBOM: Eight Steps to Success
    65 30 mike w lackey, pe
    principal
    lackey de carvajal cx
    Wed, Aug 4, 2010
    SRECs
    in NC v2.2 EAc2: On-Site Renewable Energy
    65 31 Michelle Cottrell
    President
    Design Management Services
    Thu, Aug 26, 2010
    RE: Outside of the US
    in CS 2009 EAc6: Green Power
    65 40 Mark LaCroix
    EVP
    The CarbonNeutral Company
    Mon, Aug 30, 2010
    RE: Outside of the US
    in CS 2009 EAc6: Green Power
    65 40 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 8, 2010
    RE: Separate design and construction commissioning agents?
    in NC v2.2 EAc3: Enhanced Commissioning
    65 43 Chris Ladner
    Partner
    Viridian
    Wed, Apr 6, 2011
    RE: Confusion with ASHRAE 55
    in CI 2009 IEQc7.1: Thermal Comfort—Design
    65 44 Roger Chang
    Principal, Director of Sustainability
    Westlake Reed Leskosky
    Wed, Aug 11, 2010
    RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    65 55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Jul 27, 2010
    RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    65 55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 29, 2010
    RE: Existing AHU serves more than the LEED tenant space- what to do?
    in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    65 58 Allison Beer McKenzie
    Architect, Director of Sustainability
    SHP Leading Design
    Thu, Aug 5, 2010
    RE: LEED EBOM performance period for EA credits.
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    65 73 Jenny Carney
    Principal
    YR&G
    Wed, Aug 11, 2010
    RE: For naturally ventilated buildings.....
    in NC 2009 IEQc1: Outdoor Air Delivery Monitoring
    65 135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 21, 2010
    Title Comments Most Recent Post
    Ds Narrative
    in CI-2009 IEQp1: Minimum IAQ Performance
    96 Bob Baker
    Thu, May 31, 2012
    Different showers in Wellness / Fitness Center
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    156 Ralf Lehmann
    M.Sc. | Dipl.-Ing. (FH) | LEED AP BD&C
    ALPHA Energy & Environment GmbH
    Thu, May 31, 2012
    Exterior Lighting special circumstances
    in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
    64 Luis Miguel Diazgranados
    Green Factory
    Wed, May 30, 2012
    interview with Sarah Alexander posted
    in Do you have questions for GBCI?
    44 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 30, 2012
    Are “default values” and “estimated values” the same thing?
    in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
    392 Patrick Culhane
    Sustainability Officer
    Canderel
    Mon, May 28, 2012
    Certified Wood In LEED 2012 Does Not Align with FSC Standard
    in LEED 2012 - 4th Public Comment and Ballot Forum
    191 Judy Landwehr
    Product Compliance & Training Manager
    Masonite Architectural DoorSystems
    Wed, May 23, 2012
    "Material Type" definition in the raw materials credit
    in LEED 2012 - 4th Public Comment and Ballot Forum
    191 Mara Baum
    Healthcare Sustainable Design Leader
    HOK
    Tue, May 22, 2012
    Football pitches LEEd Boundary
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Ameet AA
    Fri, May 18, 2012
    Mixed Use Residential Baseline 90.1-2004
    in NC 2009 EAc1: Optimize Energy Performance
    819 Ruben Porter
    Thu, May 17, 2012
    LEED ND - Construction Credits
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    333 Shakir Ismail
    Senior Sustainability Associate, LEED AP (BD+C)
    KEO International Consultants
    Thu, May 17, 2012
    Multiple Bulidings within LEED Project Boundary
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Emanuele Incorvaia
    Sustainability Coordinator
    Burns & McDonnell
    Wed, May 16, 2012
    LEED 2012 Ballot
    in LEED 2012 - 4th Public Comment and Ballot Forum
    191 Jackie Evans
    VP Sales
    Wed, May 16, 2012
    Performance Equivalency of CIBSE TM23:2000 for ANSI/ASTM-E779-03
    in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    189 Jutta Berns-Mumbi
    principal
    ecocentric cc
    Tue, May 15, 2012
    How to account for Transients when defining Fixture Usage Groups
    in NC 2009 WEp1: Water Use Reduction—20% Reduction
    406 Gabriele E. Bibee
    Architectural Intern
    Clark Nexsen Architecture & Engineering
    Tue, May 15, 2012
    Heating and Cooling Ez, and Occupant Diversity
    in NC-2009 IEQp1: Minimum IAQ Performance
    467 Hernando Miranda
    Owner
    Soltierra LLC
    Sat, May 12, 2012
    Exhaust Fan Power
    in NC v2.2 EAp2: Minimum Energy Performance
    174 Blair Seibert
    Principal, Architect
    Verde Concepts, Inc.
    Fri, May 11, 2012
    Fresh Air Measurements on Rooftop Units
    in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
    213 Christopher Pinkowski
    Energy Engineer
    Michaels Energy
    Fri, May 11, 2012
    Ice Storage and unmet hours
    in NC 2009 EAc1: Optimize Energy Performance
    819 James Chueh
    Thu, May 10, 2012
    Parking on the Top of the Parking Deck
    in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
    30 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 9, 2012
    I recently stumbled upon a
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Chloe Bendistis
    Sustainability Project Manager
    The Sheward Partnership, LLC
    Tue, May 8, 2012

    Copyright 2013 – BuildingGreen, Inc.