| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
5 |
BABAR MEHMOOD SAUD CONSULT Sat, May 18, 2013 |
|
RE: Casework in NC 2009 MRc7: Certified Wood |
238 |
Jason Grant Principal Jason Grant Consulting Fri, May 17, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
96 |
padraic o connell Fri, May 17, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
255 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, May 17, 2013 |
|
Acoustics study in NC 2009 IDc1: Innovation in Design |
355 |
Katie Schulze Project Specialist Investive Building Projects Fri, May 17, 2013 |
|
RE: Good to know in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
13 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: LEV discounted parking in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
209 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
111 |
Michael DeVuono T&M Associates Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Bicycle racks and chaging rooms underground in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
62 |
Michael E. Edmonds-Bauer Edmonds International Tue, Apr 2, 2013 |
|
EXTRACTION DUCTS AND FANS in CS 2009 IEQc3: Construction IAQ Management Plan—During Construction |
20 |
Michael E. Edmonds-Bauer Edmonds International Tue, Apr 2, 2013 |
|
RE: International Projects - Environmental Site Assesment in Schools SSp2: Environmental Site Assessment |
49 |
Larry Sims Principal Studio4, LLC Tue, Apr 2, 2013 |
|
Pilot House - Credit 67 Approach in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
7 |
Ryan Pitera Energy Consultant van Zelm, Heywood & Shadford Tue, Apr 2, 2013 |
|
RE: What to do if no EAc1.3? in CI 2009 EAc4: Green Power |
77 |
Darrell Sommerlatt Mon, Apr 1, 2013 |
|
RE: Building flush out for several small alterations in EBOM 2009 IEQc1.5: IAQ Best Management Practices—IAQ Management for Facility Alterations and Additions |
32 |
Julie Pollack Principal/Owner Stewart-Pollack Design Associates Fri, Mar 29, 2013 |
|
RE: Clarification for Conference Room in EBOM 2009 IEQc2.2: Controllability of Systems—Lighting |
36 |
David Posada Sustainability Manager GBD Architects Thu, Mar 28, 2013 |
|
RE: LEED EB:OM 2009 Addenda : IEQc3.5: Green Cleaning - Entryway in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control |
37 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, Mar 28, 2013 |
|
RE: Stand Alone Restroom Building in MPR4: Must comply with minimum floor area requirements |
6 |
Brad Gambrell RIM Architects Tue, Apr 30, 2013 |
|
RE: ND standard vs the NC standard in ND-v2009: Construction activity pollution prevention |
2 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Thu, Mar 28, 2013 |
|
MRc7 and MRc6 in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables |
49 |
Gabriel Frasson Project Coordinator OTEC Thu, Mar 28, 2013 |
|
RE: Latest review comments based on LEEDUser policy template in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
36 |
Michelle Cottrell President Design Management Services Wed, Mar 27, 2013 |
|
RE: Existing Transit in ND-v2009: Locations with reduced automobile dependence |
10 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Wed, Mar 27, 2013 |
|
RE: Recertification Tracking in EBOM 2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipment |
29 |
Megan Meiklejohn Sustainability Operations Director, East Coast Healthy Buildings Tue, Mar 26, 2013 |
|
LPD for data center space type in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power |
64 |
Keith Amann Sr. Sustainability Manager YR&G Tue, Mar 26, 2013 |
|
RE: Final stabilization for zero-lot line projects in CS 2009 SSp1: Construction Activity Pollution Prevention |
47 |
Michael E. Edmonds-Bauer Edmonds International Mon, Mar 25, 2013 |
|
RE: Energy Star HVAC equipment in CI 2009 IDc1: Innovation in Design |
114 |
Daniel LeBlanc Senior Sustainability Manager YR&G Mon, Mar 25, 2013 |
|
RE: Classroom Sinks in Schools 2009 WEp1: Water Use Reduction—20% Reduction |
31 |
Carl Sherman CPD, LEED A.P. Weigand Associates Mon, Mar 25, 2013 |
|
RE: FTEs only!?!? in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
84 |
Matthew VanSweden Community and Environmental Advocate Integrated Architecture Mon, Mar 25, 2013 |
|
RE: VOC content for concret additive (curing enhancer) in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
67 |
Michael E. Edmonds-Bauer Edmonds International Sat, Mar 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: MR Credit - Environmentally Preferable Structure and Enclosure in LEED 2012 – 2nd Public Comment – Materials & Resources (MR) Section |
46 |
Keith Lindemulder Environmental Business Development- LEED AP BD&C Nucor Thu, Sep 15, 2011 |
|
RE: Poured concrete is not an air in Is poured concrete an air barrier material? |
3 |
Aaron Ashley Thu, Sep 15, 2011 |
|
Sorry, late thread in LEED 2012 – 2nd Public Comment – Indoor Environmental Quality (IEQ) Section |
12 |
Jeff Chapman EcoDesigner Kirksey Fri, Oct 28, 2011 |
|
Development Density and Diverse Uses - Option 3 in LEED 2012 – 2nd Public Comment – LT (Location and Transportation) Section |
11 |
Megan Koehler KMD Architects Wed, Sep 14, 2011 |
|
RE: Re:Regional Priority Credit in Regional Priority Credit |
2 |
Sue Barnett Principal Sue Barnett Sustainable Design Wed, Sep 14, 2011 |
|
RE: In the past, the published in How long does it take for USGBC to do the LEED design & construction review? |
5 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Fri, Sep 9, 2011 |
|
v2.0 timeline in Deadline to tackle USGBC review |
3 |
Daniela Castro Salgado LEED AP BD+C / Sustainability Coordinator Edmonds International Ltd Thu, Sep 8, 2011 |
| Calculating Waste Diversion Rates for a Modular Factory | - |
by Christopher Rober... Thu, Sep 8, 2011 |
|
RE: Another question on a similar in EBOM WEp1 and showers/showerheads |
2 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Wed, Sep 7, 2011 |
|
RE: LEED tenant manual in Tenant Manual for LEED New development in Core & Shell |
2 |
Ivan Ora Sales Manager Tulipan Grupa Fri, Sep 2, 2011 |
|
Performance Period for EBOM v2 - using more than the minimum in Performance Period LEED EBOM |
2 |
Tyra Sorensen Thu, Sep 1, 2011 |
|
RE: LEED definition of weatherproofing system in "Within the Weatherproofing System" at walls |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Aug 31, 2011 |
|
RE: Good riddance in $100M Lawsuit Against LEED Dismissed by Federal Judge |
13 |
James Thornton Project Manager, Commissioning Group ccrd Thu, Aug 18, 2011 |
|
Hard copy signatures in Owner Required Signatory - USGBC soliciting feedback |
5 |
Mike Barker Principal : Energy / Electrical Engineer BuildingPhysics South Africa Tue, Aug 16, 2011 |
|
RE: email reviewer in Can You Refute Credit Denial Prior To the Appeal Stage? |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 9, 2011 |
|
RE: Re: Cancellation of project review in Regarding Cancellation of project review |
4 |
David Posada Sustainability Manager GBD Architects Mon, Aug 8, 2011 |
|
RE: certifications for cleaning products in ID credit Green Cleaning and Maintenance |
1 |
Patrice Coffman Sustainability Coordinator UC Davis Student Housing Thu, Aug 4, 2011 |
|
RE: Current registered project shifts to New Rating Systems in Comment on the New LEED Rating System Draft to be Released in 2012 |
97 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Mar 6, 2012 |
|
contacting reviewer in Contacting the Reviewer |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 30, 2011 |
|
project admin duties in General LEED project duties - Project Admin |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 30, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: leed pilot credits - we need your help! in Pilot Credit 10: Sustainable Wastewater Management |
87 | 33 |
Batya Metalitz Manager, LEED Technical Development USGBC Fri, Sep 24, 2010 |
|
RE: 100 year flood for project outside US? in NC 2009 SSc1: Site Selection |
87 | 56 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Tue, Sep 28, 2010 |
|
RE: Composite materials in NC v2.2 MRc4: Recycled Content |
87 | 138 |
Anne Nicklin Executive Director Building Materials Reuse Association Tue, Sep 28, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
87 | 43 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Fri, Apr 16, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
87 | 43 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Nov 23, 2010 |
|
RE: non-project specific RECs in CI 2009 EAc4: Green Power |
87 | 77 |
Jacob Arlein Director of Energy Services Environmental Building Strategies Fri, Sep 10, 2010 |
|
RE: Zero Blowdown Technology for Cooling Towers - No Chemicals in EBOM 2009 WEc4: Cooling Tower Water Management |
86 | 55 |
Ashley Miele President J&A Associates Engineers and Managers Tue, Sep 28, 2010 |
|
RE: non-project specific RECs in CI 2009 EAc4: Green Power |
86 | 77 |
Jacob Arlein Director of Energy Services Environmental Building Strategies Thu, Sep 9, 2010 |
|
RE: 75% COMPLIANCE area in EBOM 2009 SSc7.2: Heat Island Reduction—Roof |
86 | 58 |
Paul C Fri, Sep 10, 2010 |
|
RE: Permanent Monitoring System for Thermal Comfort Verification in NC 2009 IEQc7.2: Thermal Comfort—Verification |
85 | 61 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Fri, Aug 20, 2010 |
|
Excluding Kitchens in Regularly Occupied Spaces in Schools 2009 IEQc8.2: Daylight and Views—Views |
85 | 55 |
Renee Shirey Tue, Sep 28, 2010 |
|
Smoking area in retail area in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
85 | 186 |
GABRIEL MORALES Architect Grupo Syasa Fri, Sep 10, 2010 |
|
Zero Blowdown Technology for Cooling Towers - No Chemicals in EBOM 2009 WEc4: Cooling Tower Water Management |
85 | 55 |
Ashley Miele President J&A Associates Engineers and Managers Thu, Sep 23, 2010 |
|
Anti-termite Treatment in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
85 | 70 |
KC Rat ESG Fri, Sep 24, 2010 |
|
RE: Anti-termite Treatment in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
85 | 70 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Fri, Sep 24, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
85 | 43 |
Sherry Bonelli LEED Project Manager/Consultant BudSprout LLC -- SucceedAtLEED.com Mon, Nov 22, 2010 |
|
RE: non-project specific RECs in CI 2009 EAc4: Green Power |
85 | 77 |
John Bauer Fri, Sep 10, 2010 |
|
RE: Automatic for a LEED CS certified building? in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
85 | 84 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Tue, Sep 28, 2010 |
|
Aluminum in NC v2.2 MRc5: Regional Materials |
85 | 105 |
Paul Duffy glaserworks Fri, Sep 10, 2010 |
|
RE: Using the DOE CBECS Table in NC v2.2 EAc2: On-Site Renewable Energy |
85 | 31 |
Andrew Casas Sun, Sep 12, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Rainwater Harvesting Calculator in NC 2009 WEc2: Innovative Wastewater Technologies |
75 |
E H Sustainability Architect Mon, Feb 18, 2013 |
|
Option 2: Scope and EAp2 in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
200 |
Marco Abdallah Fri, Feb 15, 2013 |
|
What codes or standards for Fundamental Commissioning in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems |
42 |
Veronica Reed Founder SDSARCH CIA. LTDA. Wed, Feb 13, 2013 |
|
Option 2: EV Capacity per Station in Retail–CI-v2009: Alternative transportation |
1 |
Richard Manning Principal Green Building Services Wed, Feb 13, 2013 |
|
MRcredit 7 in Schools 2009 MRc7: Certified Wood |
7 |
Esther Kohout Kohout Woodwork, Inc Wed, Feb 13, 2013 |
|
problem with MR Cr2.1 template version 5 at LEED online in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods |
59 |
Sofia Otterheim Wed, Feb 13, 2013 |
|
Space by Space method in Retail–CI-v2009: Minimum energy performance |
5 |
Tejaswi Damaraju Tue, Feb 12, 2013 |
|
Flush out and un-touched area in LEED boundary in Schools 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
23 |
Todd Bundren Associate Lawrence Group Mon, Feb 11, 2013 |
|
EAc7 Community Contaminant Prevention - Airborne Releases in Pilot Credit 27: Reconcile Projected and Actual Energy Performance |
11 |
Andrew Gil Architect, Associate, LEED AP BD+C. USGBC NY Upstate Board of Directors HOLT Architects, P.C. Fri, Feb 8, 2013 |
|
Firestop Sealant in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
127 |
Erin Norton Wed, Feb 6, 2013 |
|
WEc1 Option 1 in NC 2009 WEc1: Water Efficient Landscaping |
234 |
Arzu Tugrul Dipl.-Ing. Tue, Feb 5, 2013 |
|
IEQc3.1 in Requirment of Equipment storage yard |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 5, 2013 |
|
District Energy Systems: Confusion in CI 2009 EAc1.3: Optimize Energy Performance—HVAC |
200 |
Marco Abdallah Tue, Feb 5, 2013 |
|
fire retardant coatings in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Marco Capelli LEED AP BD+C, LEED AP ND Open Project srl Mon, Feb 4, 2013 |
|
I am referring to the skills LEED in Italy in Schools 2009 IDc2: LEED Accredited Professional |
1 |
Claudio Ciamaglia Ciamaglia Sat, Feb 2, 2013 |
|
LEED-EBOM stress test in Where Do I Start? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Feb 1, 2013 |
|
WEc3 Reviewer's Response in EBOM-2009 WEc3: Water Efficient Landscaping |
92 |
Alicia Silva CEO Revitaliza consultores Thu, Jan 31, 2013 |
|
IAQ Procedure contaminant testing - costs and concerns in NC-2009: Indoor air quality procedure - alternative compliance path |
1 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Tue, Jan 29, 2013 |
|
Feedback for ACP Program in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
7 |
Elizabeth Crenshaw Hammitt Environmental Coordinator EPB Thu, Jan 24, 2013 |
|
LEED automation partners in Living with LEED Online - quirks, bugs and hiccups |
103 |
Michael Beattie LEED Administrator NBF Architects Wed, Jan 23, 2013 |