LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Geometry baseline vs. proposed building performance in NC v2.2 EAp2: Minimum Energy Performance |
186 |
jaume balana quadrant Thu, Jun 20, 2013 |
|
How many signs are required for preferred parking? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
220 |
Susan Di Giulio Project Manager Zinner Consultants Thu, Jun 20, 2013 |
|
Slate Porcelain Tiles in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
203 |
Benj Herrera LEED AP BD+C Thu, Jun 20, 2013 |
|
Secure parking garage/room in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
162 |
Phillip Cook WGE Wed, Jun 19, 2013 |
|
Duct adhesives in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
71 |
Michael E. Edmonds-Bauer Edmonds International Wed, Jun 19, 2013 |
|
Extended Stay? in CS 2009 SSc2: Development Density and Community Connectivity |
32 |
Sara Neff Director, Sustainability Programs Kilroy Realty Corporation Wed, Jun 19, 2013 |
|
RE: Recycling Rooms in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
192 |
Dylan Connelly Mechanical Engineer Integral Group Wed, Jun 19, 2013 |
|
PI Form 3 occupancy question, transient student vs retail in PIf3: Occupant and Usage Data |
107 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Wed, Jun 19, 2013 |
|
RE: Line between consumables and 'process' consumables in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
78 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Wed, Jun 19, 2013 |
|
RE: E Cigarettes in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
74 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 19, 2013 |
|
Occupant feedback in EBOM 2009 IEQp3: Green Cleaning Policy |
45 |
Sheryl Swartzle LEED administration TLC Engineering for Architecture Wed, Jun 19, 2013 |
|
retention basin and infiltration on site in NC 2009 SSc6.2: Stormwater Design—Quality Control |
109 |
ADRIENN GELESZ LEED AP ABUD Engineering Ltd. Wed, Jun 19, 2013 |
|
RE: Modelling Basement Parking in NC 2009 EAp2: Minimum Energy Performance |
1,426 |
Marcus Sheffer LEED Fellow 7group Wed, Jun 19, 2013 |
|
RE: Submit a Low Mercury ID Credit in NC 2009 IDc1: Innovation in Design |
370 |
Clara Pistoni Sustainability Consultant Wed, Jun 19, 2013 |
|
Definition direct line of sight in NC 2009 SSc8: Light Pollution Reduction |
405 |
Juliane Muench Wed, Jun 19, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
No-break (UPS - UPS - Uninterruptible Power Supplies) in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances |
189 |
Vitorio Lepiane Sustentech Thu, Jun 6, 2013 |
|
RE: Floor polish/finsh over epoxy terrazzo floor in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings |
80 |
Jonathan Clifford LEED-AP BD+C Blackburn Architects Thu, Jun 6, 2013 |
|
RE: Site Boundary, SWPPP and Erosion Control in NC 2009 SSp1: Construction Activity Pollution Prevention |
147 |
Michael DeVuono T&M Associates Thu, Jun 6, 2013 |
|
RE: Requirements by government agency don't require total cleanup in NC 2009 SSc3: Brownfield Redevelopment |
69 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Thu, Jun 6, 2013 |
|
RE: FSC lagging? in CI 2009 MRc7: Certified Wood |
86 |
Doug Pierce, AIA Architect / Sustainability Strategist Perkins+Will Wed, Jun 5, 2013 |
|
RE: New requirements in Version 5.0 form for LEED-EB: O&M v3/2009? in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance |
217 |
David Hubka Director - Operations Transwestern Sustainability Services Wed, Jun 5, 2013 |
|
Mixed Mode Natural & Mechanical Ventilation...? in NC 2009 IEQc2: Increased Ventilation |
55 |
Tony Ricketts Mechanical Engineer Wick Fisher White Wed, Jun 5, 2013 |
|
RE: Waste use for leveling in CS 2009 MRc2: Construction Waste Management |
52 |
Michael E. Edmonds-Bauer Edmonds International Wed, Jun 5, 2013 |
|
RE: Exemplary Performance for Greenfields in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
146 |
Ahmed Younis Instrumentation and Control Engineer Dar Al Handasah Wed, Jun 5, 2013 |
|
RE: Cooling Tower Submetering in CI 2009 EAc3: Measurement and Verification |
83 |
Victor Avedano Principal JALRW Eng. Group Inc. Wed, Jun 5, 2013 |
|
RE: Accounting for Change Orders In Total Material Cost in CI 2009 MRc4: Recycled Content |
126 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Wed, Jun 5, 2013 |
|
LEED for Healthcare - EAc7 - in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases |
5 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Wed, Jun 5, 2013 |
|
RE: Green cleaning innovation points in CI 2009 IDc1: Innovation in Design |
123 |
emily reese Architectural Designer / Sustainable Facility Planner Jacobs Engineering Wed, Jun 5, 2013 |
|
RE: Existing bike storage and showers in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
74 |
emily reese Architectural Designer / Sustainable Facility Planner Jacobs Engineering Wed, Jun 5, 2013 |
|
RE: floor area for PIf3 vs IEQc8 in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
111 |
Todd Reed Daylight Designer 7group Wed, Jun 5, 2013 |
|
RE: Distance calculation in EBOM 2009 MRc5: Sustainable Purchasing—Food |
61 |
Magda Aghababyan CEO Co-Energi (Pvt) Ltd. Tue, Jun 4, 2013 |
|
RE: GBCI Review Comments Regarding Parking Requirements for Campus in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
88 |
Lisa Milano Tue, Jun 4, 2013 |
|
RE: Naturally or mechanically conditioned? in NC 2009 IEQc7.1: Thermal Comfort—Design |
138 |
Lindsay Austrom Mechanical Engineer Stantec Tue, Jun 4, 2013 |
|
RE: reporting complication in NC v2.2 EAc6: Green Power |
51 |
Marcus Sheffer LEED Fellow 7group Tue, Jun 4, 2013 |
|
Medical Equipment in Healthcare-v2009: Furniture and medical furnishings |
5 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Tue, Jun 4, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: webcast recording in Video: Behind the Scenes on LEED 2012: New Developments in Credit Documentation, Reference Guides, and More |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Sep 6, 2012 |
|
RE: MPR #6 - CI project without submetered utilities in MPR 6 - Energy Star Portfolio Manager |
47 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: 4 floor building - 2 phases in Site boundaries for multi-phase Projects |
17 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 5, 2012 |
|
RE: Change of project in Registration |
7 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 5, 2012 |
|
RE: Consult Core & Shell Appendix 1 in Determing Transients (Students/Visitors) |
8 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 5, 2012 |
|
RE: ID Credit for Dual Certification in Green Globes Q&A |
9 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 4, 2012 |
|
RE: Not much of anything in USGBC LEED EBOM policy model 2009 |
5 |
Paulina Marinkovic Sustainability Manager LEED AP O&M Samba Energy Fri, Aug 31, 2012 |
|
RE: Does this mean state owned in Georgia Bans LEED Over Certified Wood Credits |
2 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, Aug 24, 2012 |
|
LEED 2.2 Registered Projects in LEED 2.2 Registered Projects (with the eventual adoption of LEED v4) |
1 |
David Posada Sustainability Manager GBD Architects Wed, Aug 22, 2012 |
|
RE: Activity Date in CMP in GBCI now reviewing CMP hours within 48 hours of entry |
11 |
Kristina Bach CORE Steward Cooper Carry Wed, Aug 22, 2012 |
|
RE: Thanks Andrew! in LEED Online and how to make it run FAST on Google Chrome |
4 |
Maura Adams Environmental Stewardship Manager Wed, Aug 15, 2012 |
|
RE: LEED Certified or Certifiable? in LEED Certified or Certifiable? Architects Make the Case for Earning the Plaque |
9 |
Sandeep Goswami COO Fountain Head II Sat, Aug 11, 2012 |
|
Thanks for the responses so in Student looking for LEED users to complete a questionnaire on the IgCC and LEED |
1 |
Michael Zagorski Thu, Aug 2, 2012 |
|
RE: post-event Q&A in Video: Top-20 LEED-EBOM Documentation Mistakes—And How to Avoid Them |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Jul 27, 2012 |
|
RE: suggestions in Breech of Protocol by GBCI and Project Administrator Changes |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Jul 27, 2012 |
|
RE: Contaminants of Concern & Green Globes in Chemical Industry Attacks LEED: We Check the Facts |
12 |
Hernando Miranda Owner Soltierra LLC Thu, Jul 26, 2012 |
|
RE: The AHPBC in The New Anti-LEED? |
2 |
J Michael Pearson Director of Engineering Genelco, Inc Wed, Jul 25, 2012 |
|
RE: change LPE info in Change LPE |
4 |
Peter Warren Principal Warren Architecture Tue, Jul 24, 2012 |
|
RE: And the winning number is??? in Tristan's thumbs up rating? |
8 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 23, 2012 |
|
Green Globes Guiding Principles Certification in Government Hears Overwhelming Support for LEED |
1 |
John Chyz Commissioning Authority The Cross Creek Initiative, Inc. Fri, Jul 13, 2012 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
Calculating FTEs in Calculating FTEs |
257 | 136 |
Sherry Bonelli LEED Project Manager/Consultant BudSprout LLC -- SucceedAtLEED.com Wed, Dec 9, 2009 |
|
Manufacturer's are slowly in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps |
256 | 103 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Sep 2, 2009 |
|
Daylighting Collaborative (Organization) in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
255 | 111 |
Candice Clark Business Development Manager- Commercial Div. Solatube Int. Inc. Tue, Jul 14, 2009 |
|
New CIRs are not precedent setting in Upgrade to LEED 2009? How to Choose for Your Project |
254 | 13 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Tue, Oct 13, 2009 |
|
Houseplants and fresh air in CI 2009 IDc1: Innovation in Design |
253 | 123 |
Wagner Oliveira CTE Wed, Dec 2, 2009 |
|
RE: ISSUE Part 2 in CI-2009 IEQp1: Minimum IAQ Performance |
252 | 99 |
Green Living LLC Elizabeth Gharib Wed, Feb 3, 2010 |
|
RE: M&V and metering in NC 2009 EAc5: Measurement and Verification |
250 | 132 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Wed, Nov 25, 2009 |
|
RE: Concrete Sealer in NC 2009 MRc5: Regional Materials |
249 | 154 |
Shannon Gray Consultant YRG sustainability Thu, Nov 19, 2009 |
|
RE: Regionally manufactured materials in NC 2009 MRc5: Regional Materials |
249 | 154 |
Nadav Malin USGBC LEED Faculty, President BuildingGreen, Inc. Mon, Dec 7, 2009 |
|
RE: Daylighting Collaborative (Organization) in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
248 | 111 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jul 14, 2009 |
|
RE: Houseplants and fresh air in CI 2009 IDc1: Innovation in Design |
247 | 123 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Dec 2, 2009 |
|
RE: Energy Star for a Manufacturing - Assembly Company in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
246 | 76 |
Jenny Carney Principal YR&G Mon, Dec 14, 2009 |
|
LEED NC2.2 SSc4.3 & AGMBC in LEED NC2.2 SSc4.3 & AGMBC |
246 | 1 |
Steve Loppnow Sustainability Manager YR&G Tue, Jan 5, 2010 |
|
RE: Hospital water use? in NC 2009 WEc3: Water Use Reduction |
244 | 76 |
Ben Stanley Sustainability Manager YRG sustainability Fri, Jan 29, 2010 |
|
RE: M&V and metering in NC 2009 EAc5: Measurement and Verification |
244 | 132 |
Joshua Radoff Principal, LEEDuser Primary Author YRG sustainability Sun, Nov 29, 2009 |
|
RE: Houseplants and fresh air in CI 2009 IDc1: Innovation in Design |
243 | 123 |
Allyson Wendt Freelance Editor and Writer Wed, Dec 2, 2009 |
|
RE: ANSI S12.60-2002 - Not required? in Schools 2009 IEQp3: Minimum Acoustical Performance |
243 | 124 |
Daniel Hicks Daniel Hicks, E.I., INCE Geiler & Associates Mon, Nov 16, 2009 |
|
Hospital water use? in NC 2009 WEc3: Water Use Reduction |
240 | 76 |
Tommy Linstroth Principal Trident Sustainability Group Thu, Jan 21, 2010 |
|
Option B and D in NC 2009 EAc5: Measurement and Verification |
240 | 132 |
Gilbrt Dilanchian Mon, Jan 25, 2010 |
|
RE: M&V and metering in NC 2009 EAc5: Measurement and Verification |
239 | 132 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Wed, Dec 2, 2009 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Unable to meet 5% building occupants in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
88 |
Rebecca Hart WSP Wed, May 29, 2013 |
|
4.3 effic vehicle parking versus 4.4 car pool parking in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
197 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Wed, May 29, 2013 |
|
Re-use existing equipment? in Healthcare-v2009: Minimize potable water use for medical equipment cooling |
1 |
Mark Meaders Sustainable Design Project Manager HDR Architecture, Inc. Tue, May 28, 2013 |
|
Credit language in Pilot Credit 14: Walkable Streets |
48 |
Michael Beattie LEED Administrator NBF Architects Tue, May 28, 2013 |
|
Install furnitures during construction and with A/C on in NC v2.2 EQc3.1: Construction IAQ Management Plan—During Construction |
19 |
Benj Herrera LEED AP BD+C Sun, May 26, 2013 |
|
water use reduction calculation in NC 2009 WEc1: Water Efficient Landscaping |
239 |
Jamal Uddin Sun, May 26, 2013 |
|
LEED Project Boundary for a Train Station in MPR3: Must use a reasonable site boundary |
100 |
Michael Guadagnoli Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
197 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
SSc4 Alternate Commuting Transportation - survey question in Doing the Alternative Commuting Transportation Survey |
9 |
Tim Lewis MetroPool Inc. Thu, May 23, 2013 |
|
Change in Owner signature in Required Signatories in LEED Online Forms |
46 |
Henrique Mendes Mr. Green Domus Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
346 |
Arpan Bakshi Thu, May 23, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
120 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
48 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
Copyright 2013 – BuildingGreen, Inc.