Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    Surface finish on Concrete Yards slab pursuing SSc7.1
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    164 Sean Hogan
    Mr.
    RKD Architects
    Fri, May 24, 2013
    RE: No HVAC / Natural Ventilation - Unmet Hrs
    in NC 2009 EAp2: Minimum Energy Performance
    1,379 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    RE: How to define vision glazing
    in NC 2009 IEQc8.2: Daylight and Views—Views
    248 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 23, 2013
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    120 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    RE: Does casework count for MR4, MR5 and MR7?
    in Schools 2009 MRc7: Certified Wood
    8 Candace Small
    Thu, May 23, 2013
    RE: Healthcare Prereq 1 Fixtures and Calcs
    in NC 2009 WEp1: Water Use Reduction—20% Reduction
    410 Derek Sylvia
    Thu, May 23, 2013
    Title Comments Most Recent Post
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    Surface finish on Concrete Yards slab pursuing SSc7.1
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    164 Sean Hogan
    Mr.
    RKD Architects
    Fri, May 24, 2013
    RE: No HVAC / Natural Ventilation - Unmet Hrs
    in NC 2009 EAp2: Minimum Energy Performance
    1,379 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    RE: How to define vision glazing
    in NC 2009 IEQc8.2: Daylight and Views—Views
    248 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    120 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Thu, May 23, 2013
    RE: Does casework count for MR4, MR5 and MR7?
    in Schools 2009 MRc7: Certified Wood
    8 Candace Small
    Thu, May 23, 2013
    RE: Healthcare Prereq 1 Fixtures and Calcs
    in NC 2009 WEp1: Water Use Reduction—20% Reduction
    410 Derek Sylvia
    Thu, May 23, 2013
    RE: Potential crossover credit from New Construction to Schools?
    in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    38 James Leonard
    via Buro Happold
    Thu, May 23, 2013
    RE: MRc4 and MRc7
    in NC 2009 MRc4: Recycled Content
    267 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, May 23, 2013
    RE: Interior Places of Respite
    in Healthcare-v2009: Connection to the natural world - places of respite
    4 Candace Small
    Thu, May 23, 2013
    RE: Core & Shell: Electricity Use
    in CS 2009 EAc6: Green Power
    42 Marcus Sheffer
    LEED Fellow
    7group
    Thu, May 23, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    106 Todd Reed
    Daylight Designer
    7group
    Thu, May 23, 2013
    RE: CalGreen and LEED Requirements for SSc4.3
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    213 Michelle Reott
    LEED AP BD+C, ID+C, Managing Principal
    Earthly Ideas LLC
    Thu, May 23, 2013
    RE: WC's
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    159 OSCAR DE LA RED
    LEED AP BD+C
    PROMEC
    Thu, May 23, 2013
    Title Comments Most Recent Post
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    Can't select "other" in space usage type drop down
    in Filling out Space Usage Type
    18 Shivani Langer
    Architect
    SHW Group
    Thu, May 23, 2013
    LEED Healthcare Certification Level Costs and Challenges
    in LEED Rating System Selection Q&A
    332 Arpan Bakshi
    Thu, May 23, 2013
    RE: Resubmit After Dening
    in Review Appeal
    24 Jim Park
    Project Manager
    EAN Technology
    Thu, May 23, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    RE: Correction
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    15 Peggy White
    White + GreenSpec
    Wed, May 22, 2013
    RE: Regarding LEED certification for District Cooling Plant
    in New District Energy Guidance for LEED Released by USGBC
    45 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    LEED EB:OM
    in Start a New LEED Discussion Topic
    11 Lennart Lifvenhjelm
    Vasakronan AB
    Wed, May 22, 2013
    RE: v3 stormwater design vs v4 rainwater management
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    94 Theresa Backhus
    Sites Technical Specialist
    USGBC
    Tue, May 21, 2013
    RE: MRc4 recycled content---recovered fiber
    in MR Credit 4- Recycled Content
    4 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 21, 2013
    RE: LEED Online with Internet Explorer 10
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    333 Megan Koehler
    KMD Architects
    Mon, May 20, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: (Jacob) Calculating for Future Growth
    in Calculating FTEs
    135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 14, 2013
    RE: about that working group....
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Marian Keeler
    Senior Associate
    Thornton Tomasetti / Simon & Associates
    Mon, May 13, 2013
    RE: Cannot login to LEED Online..
    in Living with LEED Online - quirks, bugs and hiccups
    103 Francisca Herrera
    Miranda & Nasi
    Mon, May 13, 2013
    RE: V4 implementation and '09 phase out
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 10, 2013
    RE: Master Site and different buidings certifications
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Eric Anderson
    Technical Customer Service Specialist
    GBCI
    Fri, May 10, 2013
    Tenant Sales or Lease Agreement
    in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
    19 Julie Hendricks
    Director of EcoServices
    Kirksey
    Sun, May 5, 2013
    RE: BD&C Exam Prep
    in Earn CEUs on LEEDuser—With Ease
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 30, 2013
    Title Votes Comments Most Recent Post
    Re: Existing Building with an outbuilding addition
    in Existing Building with an outbuilding addition
    10 3 David Posada
    Sustainability Manager
    GBD Architects
    Tue, Jan 10, 2012
    RE: "Green Specs"
    in How to "Green" Specs on LEED Projects
    10 8 J Douglas Dietrich
    Fri, May 14, 2010
    RE: Changes to Recognition Package
    in Changes to Recognition Package for Pre-LEED 2009 Certified Projects
    10 10 Michelle Reott
    LEED AP BD+C, ID+C, Managing Principal
    Earthly Ideas LLC
    Thu, Dec 1, 2011
    RE: Can't use LEED 2009 MF sections for an NC 2.2 project.
    in Material Cost: CSI MasterFormat 1995 vs. 2004
    10 8 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Oct 15, 2010
    RE: Prerequisite Denied
    in CI 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    10 20 Ben Stanley
    Sustainability Manager
    YRG sustainability
    Thu, Oct 27, 2011
    Alen A350 air purifier
    in Air purification
    10 7 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 19, 2010
    RE: Alen A350 air purifier
    in Air purification
    10 7 Karen Tucker
    Director of Customer Development
    iLiv
    Thu, May 20, 2010
    RE: Alen A350 air purifier
    in Air purification
    10 7 ryan richie
    Thu, May 20, 2010
    Public LEED Project Directory
    in LEED CI - PI form 5
    10 2 Amber Sausen
    Archtitectural Alliance
    Wed, Sep 21, 2011
    RE: Poured concrete is not an air
    in Is poured concrete an air barrier material?
    10 3 Aaron Ashley
    Thu, Sep 15, 2011
    RE: In the past, the published
    in How long does it take for USGBC to do the LEED design & construction review?
    10 5 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Aug 8, 2011
    Deadline for final Review (addressing review comments)
    in Deadline to tackle USGBC review
    10 3 Susann Geithner
    Director of Sustainability
    HSB Architects & Engineers
    Fri, Jul 22, 2011
    RE: Deadline for final Review (addressing review comments)
    in Deadline to tackle USGBC review
    10 3 Omar Katanani
    Tue, Jul 26, 2011
    RE: LEED definition of weatherproofing system
    in "Within the Weatherproofing System" at walls
    10 6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Aug 20, 2010
    Hard copy signatures
    in Owner Required Signatory - USGBC soliciting feedback
    10 5 Mike Barker
    Principal : Energy / Electrical Engineer
    BuildingPhysics South Africa
    Tue, Aug 16, 2011
    Re: Cancellation of project review
    in Regarding Cancellation of project review
    10 4 David Posada
    Sustainability Manager
    GBD Architects
    Fri, Jul 29, 2011
    RE: Re: Cancellation of project review
    in Regarding Cancellation of project review
    10 4 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Aug 8, 2011
    RE: certifications for cleaning products
    in ID credit Green Cleaning and Maintenance
    10 1 Patrice Coffman
    Sustainability Coordinator
    UC Davis Student Housing
    Thu, Aug 4, 2011
    RE: certifications for cleaning products
    in ID credit Green Cleaning and Maintenance
    10 1 Patrice Coffman
    Sustainability Coordinator
    UC Davis Student Housing
    Thu, Aug 4, 2011
    RE: Re: Promotional code
    in How to get a promotional code?
    10 8 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Thu, Jul 7, 2011
    Title Comments Most Recent Post
    Within Boundary-Consider only 1 service&shud be open to public?
    in NC 2009 SSc2: Development Density and Community Connectivity
    121 Muna Akheel
    Fri, May 24, 2013
    Surface finish on Concrete Yards slab pursuing SSc7.1
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    164 Sean Hogan
    Mr.
    RKD Architects
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    No file uploads?
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Carly Ruggieri
    Senior Sustainability Consultant
    Steven Winter Associates, Inc.
    Thu, May 23, 2013
    SSc4 Alternate Commuting Transportation - survey question
    in Doing the Alternative Commuting Transportation Survey
    9 Heather Reiners
    MetroPool Inc.
    Thu, May 23, 2013
    Change in Owner signature
    in Required Signatories in LEED Online Forms
    44 Green Domus
    Green Domus
    Thu, May 23, 2013
    Can't select "other" in space usage type drop down
    in Filling out Space Usage Type
    18 Shivani Langer
    Architect
    SHW Group
    Thu, May 23, 2013
    LEED Healthcare Certification Level Costs and Challenges
    in LEED Rating System Selection Q&A
    332 Arpan Bakshi
    Thu, May 23, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    Street trees
    in Pilot Credit 14: Walkable Streets
    46 Roland Le Roux
    Green Building Consultant
    Wed, May 22, 2013
    Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    121 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    sealant applied to clearance between double glazing
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Noriko Yasuhara
    CSR Design & Landscape Co., Ltd.
    Tue, May 21, 2013
    porous or non-porous material
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    287 Noriko Yasuhara
    CSR Design & Landscape Co., Ltd.
    Tue, May 21, 2013
    Just joined in with LEED
    in NC v2.2 EQc6.1: Controllability of Systems—Lighting
    42 alex songs
    Tue, May 21, 2013

    Copyright 2013 – BuildingGreen, Inc.