Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    Exterior Lighting for Baseline
    in NC 2009 EAp2: Minimum Energy Performance
    1,363 Jatuwat Varodompun
    Dr
    Green Building Soultion
    Thu, May 23, 2013
    RE: Resubmit After Dening
    in Review Appeal
    24 Jim Park
    Project Manager
    EAN Technology
    Thu, May 23, 2013
    VOCs emissions after given number of days
    in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    62 Jean-Baptiste Noel
    ESD Operations Manager
    Green & Global Consulting Pte. Ltd.
    Thu, May 23, 2013
    RE: HVAC to meet COP, outside US
    in CI 2009 EAp2: Minimum Energy Performance
    367 SW LEE
    LEED AP
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    119 Jim Park
    Project Manager
    EAN Technology
    Wed, May 22, 2013
    RE: Tenant lease clauses
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    158 Jim Park
    Project Manager
    EAN Technology
    Wed, May 22, 2013
    RE: Same firm as sub-contractor and CxA
    in NC 2009 EAc3: Enhanced Commissioning
    172 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    Park & Community Centers = Services?
    in Schools 2009 SSc2: Development Density and Community Connectivity
    7 Jennifer Berthelot-Jelovic
    President & CEO
    A SustainAble Production
    Wed, May 22, 2013
    RE: Streamlined Path
    in NC 2009 SSc7.2: Heat Island Effect—Roof
    164 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Wed, May 22, 2013
    RE: Exterior Envelope Commissioning
    in NC 2009 IDc1: Innovation in Design
    367 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Wed, May 22, 2013
    RE: Exterior window shades controllability
    in Healthcare-v2009: Controllability of systems - lighting
    2 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Roofing Adhesives, Sealants & Mastics
    in Healthcare-v2009: Low-emitting materials
    3 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: Number of testing point
    in Healthcare-v2009: Construction IAQ management plan - before occupancy
    5 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 22, 2013
    RE: List of approved LEED modeling Software
    in NC 2009 EAc1: Optimize Energy Performance
    819 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    265 Joel McCreary
    Principal
    McCreary/Snow Architects, PA
    Wed, May 22, 2013
    Title Comments Most Recent Post
    RE: ND standard vs the NC standard
    in ND-v2009: Construction activity pollution prevention
    2 Eliot Allen
    AICP, LEED AP-ND, CNU-A
    Principal, Criterion Planners LEED Faculty, LP TAG
    Thu, Mar 28, 2013
    MRc7 and MRc6
    in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
    49 Gabriel Frasson
    Project Coordinator
    OTEC
    Thu, Mar 28, 2013
    RE: Latest review comments based on LEEDUser policy template
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    36 Michelle Cottrell
    President
    Design Management Services
    Wed, Mar 27, 2013
    RE: Existing Transit
    in ND-v2009: Locations with reduced automobile dependence
    10 Eliot Allen
    AICP, LEED AP-ND, CNU-A
    Principal, Criterion Planners LEED Faculty, LP TAG
    Wed, Mar 27, 2013
    RE: Recertification Tracking
    in EBOM 2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipment
    29 Megan Meiklejohn
    Sustainability Operations Director, East Coast
    Healthy Buildings
    Tue, Mar 26, 2013
    LPD for data center space type
    in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
    64 Keith Amann
    Sr. Sustainability Manager
    YR&G
    Tue, Mar 26, 2013
    RE: Final stabilization for zero-lot line projects
    in CS 2009 SSp1: Construction Activity Pollution Prevention
    47 Michael E. Edmonds-Bauer
    Edmonds International
    Mon, Mar 25, 2013
    RE: Classroom Sinks
    in Schools 2009 WEp1: Water Use Reduction—20% Reduction
    31 Carl Sherman
    CPD, LEED A.P.
    Weigand Associates
    Mon, Mar 25, 2013
    RE: FTEs only!?!?
    in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
    84 Matthew VanSweden
    Community and Environmental Advocate
    Integrated Architecture
    Mon, Mar 25, 2013
    RE: VOC content for concret additive (curing enhancer)
    in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    67 Michael E. Edmonds-Bauer
    Edmonds International
    Sat, Mar 23, 2013
    RE: IEQc5 for Healthcare
    in Healthcare-v2009: Indoor chemical and pollutant source control
    3 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Sat, Mar 23, 2013
    Line between consumables and 'process' consumables
    in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables
    77 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Fri, Mar 22, 2013
    RE: What standards should I use?
    in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings
    75 Todd Bundren
    Associate
    Lawrence Group
    Fri, Mar 22, 2013
    RE: About the "Cost-saving ahead" factor in WEc2
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Mar 22, 2013
    RE: PDF Forms
    in EBOM 2009 MRp1: Sustainable Purchasing Policy
    25 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Mar 22, 2013
    RE: Elevated Air Speed
    in CI 2009 IEQc7.1: Thermal Comfort—Design
    44 Marco Barrera
    Engineer
    FMS Engineering
    Fri, Mar 22, 2013
    RE: USGBC Overhauls Demand Response Pilot - in Response to Critics
    in Pilot Credit 8: Demand Response
    29 Daniel Whittet
    LEED AP BD&C EBOM Assoc. AIA
    AHA Consulting Engineers
    Fri, Mar 22, 2013
    RE: Smoking areas
    in CS 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
    38 charles bell
    principal
    theGreenTeam, Inc.
    Fri, Mar 22, 2013
    RE: Undefined Outdoor Spaces
    in CS 2009 SSc6.1: Stormwater Design—Quantity Control
    20 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Mar 22, 2013
    RE: Whose invoice is necesary?
    in CS 2009 MRc5: Regional Materials
    16 Michael E. Edmonds-Bauer
    Edmonds International
    Fri, Mar 22, 2013
    Title Comments Most Recent Post
    project admin duties
    in General LEED project duties - Project Admin
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, Jul 30, 2011
    IEQ credits
    in Power Plant Process Space
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, Jul 30, 2011
    RE: At least in the older LEED
    in New Credits after Preliminary Review?
    2 Steve Offutt
    Fri, Jul 29, 2011
    RE: Re: Promotional code
    in How to get a promotional code?
    8 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Wed, Jul 27, 2011
    RE: Very good presentation,
    in Live Webcast: LEED AP+: Should You Opt In, and What To Do Once You Have
    11 Josh Mauldin
    ASA Architects
    Wed, Jul 27, 2011
    RE: LEED Automation
    in LEED Automation
    4 John Albrecht
    Director of LEED Services
    Sieben Energy Assoc.
    Tue, Jul 12, 2011
    Earning Certs within 5 years
    in Earning certification within 5 years
    1 Barry Giles
    Founder & CEO, USGBC LEED Faculty, LEED AP O+M
    BuildingWise LLC
    Mon, Jul 11, 2011
    RE: 2 buildings on one site, one equipment, etc
    in Two buildings on one site, one equipment, and only one building pursuing LEED
    3 Barry Giles
    Founder & CEO, USGBC LEED Faculty, LEED AP O+M
    BuildingWise LLC
    Fri, Jul 8, 2011
    Re: Addition to LEED Certified Building
    in Addition to LEED Certified Building
    1 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Jul 7, 2011
    RE: USGBC response...(EBOM growth)
    in Growth of EB O&M projects?
    2 Scott Dunning
    Architect
    HKS, Inc.
    Wed, Jul 6, 2011
    LEED matrix
    in Submittal Checklist
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Jul 5, 2011
    YES!!
    in Inconsistency of LEED Requirements between reference manuals, credit forms and review comments.
    1 April Ambrose
    Sustainability Consultant: Senior Project Manager
    Viridian
    Thu, Jun 16, 2011
    Re: LEED NC versus LEED for Homes for Temporary Lodging Faciliti
    in LEED NC versus LEED for Homes for Temporary Lodging Facilities
    1 David Posada
    Sustainability Manager
    GBD Architects
    Tue, Jun 14, 2011
    Re: Facility Alterations and Additions
    in Facility Alterations and Additions
    1 David Posada
    Sustainability Manager
    GBD Architects
    Tue, Jun 14, 2011
    Pl information
    in Front End Project Information - LEED online PI f1, PI f2, PI f3, PI f4
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Jun 13, 2011
    ACP
    in Additional Details - interpretation
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Jun 8, 2011
    Reopening a design phase credit - by Marcus Hanlon
    Tue, Jun 7, 2011
    From USGBC Website
    in Bank - branches
    1 Candace Small
    Thu, Jun 2, 2011
    my experience
    in LEED core + shell vs. new construction
    1 Candace Small
    Thu, Jun 2, 2011
    Comments
    in Mixed Used Development Certification
    1 Candace Small
    Wed, Jun 1, 2011
    Title Votes Comments Most Recent Post
    Aluminum
    in NC v2.2 MRc5: Regional Materials
    85 105 Paul Duffy
    glaserworks
    Fri, Sep 10, 2010
    RE: Using the DOE CBECS Table
    in NC v2.2 EAc2: On-Site Renewable Energy
    85 31 Andrew Casas
    Sun, Sep 12, 2010
    RE: Waste Hauler sorts off-site
    in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
    84 57 Paul C
    Thu, Sep 23, 2010
    right to access checklist
    in EBOM 2009 SSc1: LEED Certified Design and Construction
    84 26 Joanna Yaghooti
    Director of Sustainable Design
    PageSoutherlandPage
    Thu, Aug 12, 2010
    RE: Interior lighting for residential project
    in NC 2009 SSc8: Light Pollution Reduction
    83 397 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Tue, Sep 28, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    83 43 Landon Chapman
    Graduate Architect, LEED AP
    MSKTD & Associates, Inc.
    Tue, Jul 13, 2010
    RE: no desigated/assigned/reserved parking for tenant
    in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
    83 84 David Posada
    Sustainability Manager
    GBD Architects
    Wed, Aug 25, 2010
    How does this pilot credit link to the 'process loads' in EA1?
    in Pilot Credit 3: Medical and Process Equipment Efficiency
    83 23 Julian Bott
    Principal Design Consultant
    Cundall Hong Kong
    Tue, Sep 28, 2010
    RE: Staging Flush Out.
    in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
    82 124 Allison Beer McKenzie
    Architect, Director of Sustainability
    SHP Leading Design
    Mon, Sep 27, 2010
    RE: Permanent entryways on the roof
    in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    82 64 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Sep 24, 2010
    Gas Fired Equipment
    in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
    82 70 Chris Dewey
    Project Manager
    Van Auken Akins Architects LLC
    Mon, Sep 27, 2010
    RE: "Building Completed 1993 or Later" Tab on Graph
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    82 55 Dan Ackerstein
    Principal
    Ackerstein Sustainability, LLC
    Wed, Sep 29, 2010
    RE: Waste Hauler sorts off-site
    in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
    82 57 Paul C
    Thu, Sep 23, 2010
    RE: Waste Hauler sorts off-site
    in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
    82 57 Paul C
    Thu, Sep 23, 2010
    RE: Waste Hauler sorts off-site
    in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
    82 57 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 23, 2010
    Residental AND Commercial
    in Project Information form
    82 45 Deborah Spira
    Mon, Sep 13, 2010
    RE: VOC Budget - General Question
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    81 287 Mara Baum
    Healthcare Sustainable Design Leader
    HOK
    Thu, Aug 12, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    81 43 Nadav Malin
    USGBC LEED Faculty, President
    BuildingGreen, Inc.
    Mon, May 24, 2010
    RE: 2004 GSA Report on Cost of LEED
    in Understanding the Cost of LEED-NC Project Certification
    81 43 Sayeed Muhammad
    Principal Consultant
    Green Building Consultants (S) Pte Ltd
    Mon, Mar 21, 2011
    no desigated/assigned/reserved parking for tenant
    in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
    81 84 Kathy Buck
    Senior Project Manager
    Neumann/Smith Architecture
    Wed, Aug 25, 2010
    Title Comments Most Recent Post
    District Energy Systems: Confusion
    in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
    200 Marco Abdallah
    Tue, Feb 5, 2013
    fire retardant coatings
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Marco Capelli
    LEED AP BD+C, LEED AP ND
    Open Project srl
    Mon, Feb 4, 2013
    I am referring to the skills LEED in Italy
    in Schools 2009 IDc2: LEED Accredited Professional
    1 Claudio Ciamaglia Ciamaglia
    Sat, Feb 2, 2013
    LEED-EBOM stress test
    in Where Do I Start?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Feb 1, 2013
    WEc3 Reviewer's Response
    in EBOM-2009 WEc3: Water Efficient Landscaping
    92 Alicia Silva
    CEO
    Revitaliza consultores
    Thu, Jan 31, 2013
    IAQ Procedure contaminant testing - costs and concerns
    in NC-2009: Indoor air quality procedure - alternative compliance path
    1 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Tue, Jan 29, 2013
    Feedback for ACP Program
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Elizabeth Crenshaw Hammitt
    Environmental Coordinator
    EPB
    Thu, Jan 24, 2013
    LEED automation partners
    in Living with LEED Online - quirks, bugs and hiccups
    103 Michael Beattie
    LEED Administrator
    NBF Architects
    Wed, Jan 23, 2013
    Is data being gathered and used?
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Tue, Jan 22, 2013
    Kitchen Food Service Equipment
    in Schools 2009 EAc4: Enhanced Refrigerant Management
    3 Hamilton Cort
    Principal
    Cort Architectural Group
    Mon, Jan 21, 2013
    Surface brightness requirement
    in Pilot Credit 22: Quality Interior Lighting
    9 Fatima Plaza
    Mon, Jan 21, 2013
    embodied energy
    in Pilot Credit 63: Whole Building Life Cycle Assessment
    7 Jody Solell
    Owner
    Solar Electrics
    Fri, Jan 18, 2013
    LEED Boundary/Gross Floor Area for LEED-CI project
    in PIf2: Project Summary Details
    83 Alejandro Rivera Rivera
    Junior Engineer
    Studio Domus
    Wed, Jan 16, 2013
    Material-Efficient Framing based on LEED-Homes?
    in NC 2009 IDc1: Innovation in Design
    367 Heather DeGrella
    Director of Sustainable Education
    GreenCE, Inc.
    Tue, Jan 15, 2013
    Development density of the surrounding residential zone or neigh
    in How to Document SSc2 with Map Data
    30 Gaston Viau
    Tue, Jan 15, 2013
    Project information (PI) forms
    in PIf2: Project Summary Details
    83 Ameet AA
    Tue, Jan 15, 2013
    street network
    in Pilot Credit 9: Street Network
    67 Sara Aschliman
    Mon, Jan 14, 2013
    New LEED boundary definition for SSc8
    in Key LEED 2009 Interpretations
    4 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Mon, Jan 14, 2013
    USGBC Membership and Cont. Ed
    in Webcast Video: – LEED AP+: Should You Opt In, and What To Do Once You Have
    14 Cassandra Kail
    MWA Architects
    Thu, Jan 10, 2013
    Modified AHU
    in CI 2009 EAp2: Minimum Energy Performance
    367 Alejandro Rivera Rivera
    Junior Engineer
    Studio Domus
    Thu, Jan 10, 2013

    Copyright 2013 – BuildingGreen, Inc.