LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
5 |
BABAR MEHMOOD SAUD CONSULT Sat, May 18, 2013 |
|
RE: Casework in NC 2009 MRc7: Certified Wood |
238 |
Jason Grant Principal Jason Grant Consulting Fri, May 17, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
96 |
padraic o connell Fri, May 17, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
255 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, May 17, 2013 |
|
Acoustics study in NC 2009 IDc1: Innovation in Design |
355 |
Katie Schulze Project Specialist Investive Building Projects Fri, May 17, 2013 |
|
RE: Good to know in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
13 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: LEV discounted parking in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
209 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
SSc2 Site Area vs LEED Project Boundry in CS 2009 SSc2: Development Density and Community Connectivity |
30 |
James Wieben Wed, May 15, 2013 |
|
Baseline Building Rotation in NC 2009 EAc1: Optimize Energy Performance |
812 |
Mark Zoeteman Sr. Mech Engr FTC&H, Inc. Wed, May 15, 2013 |
|
RE: regularly occupied space in Schools 2009 IEQc8.2: Daylight and Views—Views |
55 |
Todd Reed Daylight Designer 7group Wed, May 15, 2013 |
|
RE: Food sustainable purchase - Compliance demonstration in EBOM 2009 MRc5: Sustainable Purchasing—Food |
58 |
H.K.C.B. Heendeniya Co-Energi (Pvt) Ltd. Wed, May 15, 2013 |
|
smoking is allowed in hotel guest rooms in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
186 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 14, 2013 |
|
RE: Option 4 ITE Parking Generation - federal property in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
193 |
Michele Riberdy Senior Project Manager Viridian Energy & Environmental Tue, May 14, 2013 |
|
RE: About carpool parking facilities. in ND-v2009: Reduced parking footprint |
2 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Tue, May 14, 2013 |
|
Unusual FTE in EBOM 2009 SSc4: Alternative Commuting Transportation |
232 |
Erin Nuckols Sustainable Building Associate Institute for the Built Environment Tue, May 14, 2013 |
|
RE: District Cooling System in NC 2009 EAc4: Enhanced Refrigerant Management |
67 |
Ante Vulin Sustainability Manager YR&G Tue, May 14, 2013 |
|
Design Build Contractual Question- EAc3 in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems |
42 |
Bob Crowell Vice President / Principal 2rw Consultants, Inc. Tue, May 14, 2013 |
|
Remediation prior to project start date in NC 2009 SSc3: Brownfield Redevelopment |
62 |
Lauren Fakhoury Research Assistant Sustainable Design Consulting, LLC Tue, May 14, 2013 |
|
Submitted drawings in PIf4: Schedule and Overview Documents |
39 |
Ashley Sadowski DRAW Architecture + Urban Design Mon, May 13, 2013 |
|
RE: EAp2 Proposed Design in CS 2009 EAp2: Minimum Energy Performance |
516 |
Marcus Sheffer LEED Fellow 7group Mon, May 13, 2013 |
|
RE: PF1#6 in PIf1: Minimum Program Requirements |
65 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 13, 2013 |
|
RE: SS Cr1: Path 9-Innovative WasteWater Technologies in CI 2009 SSc1: Site Selection |
158 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 13, 2013 |
|
Appropriate use of Core and Shell? in PIf5: Building System Control |
6 |
Kath Williams LEED Fellow, Principal Kath Williams + Associates Mon, May 13, 2013 |
|
RE: Facilities for Rent in Schools SSc10: Joint Use of Facilities |
30 |
Gabriela Sabadini LEED Consultant Edificioverde S.A. Mon, May 13, 2013 |
|
ET0 for Beijing in CS 2009 WEc1: Water Efficient Landscaping |
37 |
JIN PARK SAMOO Architects Sun, May 12, 2013 |
|
RE: Composite Wood for exterior deck and melamine-urea-formaldehyde in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products |
119 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, May 12, 2013 |
|
RE: Vocational Shops in Schools 2009 IEQp3: Minimum Acoustical Performance |
124 |
DuWayne Baird Construction Administration/LEED Project Administration SHP Leading Design Sat, May 11, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
EAp2 forum in Reference building for a dewatering facility |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: Silver or higher membership required for member discounts in New USGBC Membership Fee Structure |
55 |
Hernando Miranda Owner Soltierra LLC Wed, Mar 20, 2013 |
|
RE: LEED AP v4 in LEED NC 2009 (v3) Professional Credentials |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 18, 2013 |
|
RE: Why not GA? in 10 Tips for Passing the LEED Green Associate Exam |
8 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, Mar 15, 2013 |
|
RE: LEED-CS sunset date in Sunset Dates for CI/CSv2.0 |
2 |
Kristina Bach CORE Steward Cooper Carry Wed, Mar 13, 2013 |
|
asbestos roof in Asbestos Roof |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 11, 2013 |
| Advice for writing a LEED EB:O+M consulting contract | - |
by Lyle Axelarris Thu, Mar 7, 2013 |
|
RE: Is it really the windows? in Poor Cell Phone Service in LEED buildings |
4 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Mar 6, 2013 |
|
RE: Recertification EAc4 in Recertification |
44 |
Alicia Chu Sustainability Advisor Healthy Buildings Thu, Feb 28, 2013 |
|
RE: Non-U.S. Regional Priority Credits for LEED ND in Non-U.S. Regional Priority Credits Added to LEED |
25 |
Melissa Merryweather Director Green Consult-Asia Fri, Feb 22, 2013 |
|
RE: LEED for Retail - MRp1 Waste Stream Study in upcoming LEED for Retail |
11 |
Caroline Hedin Fri, Feb 22, 2013 |
|
RE: use of LEED logo in LEED Logo usage on a video |
4 |
Antonio Rodriguez LEED AP BD+C SYASA - México Thu, Feb 21, 2013 |
|
RE: advanced buildings doc in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”? |
5 |
Victor Avedano Principal JALRW Eng. Group Inc. Thu, Feb 21, 2013 |
|
RE: Major Tenant Build-out During Certification Period in Major Tenant Build-out During Certification Period |
4 |
Jennifer Knocha Assistant Mack-Cali Realty Corporation Thu, Feb 14, 2013 |
|
IEQc3.1 in Requirment of Equipment storage yard |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 5, 2013 |
|
LEED-EBOM stress test in Where Do I Start? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Feb 1, 2013 |
|
RE: Elevators - Energy Consumption - Sources in Attaining credits through advanced elevator technology? |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Feb 1, 2013 |
|
RE: Precertification and site/building area change in LEED-CS v3 Precertification |
37 |
Andrea Vosgueritchian Project Manager BDSP Thu, Jan 31, 2013 |
|
RE: Best energy modeling software in What is the best strategy/software to model District Cooling for LEED |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Tue, Jan 29, 2013 |
|
RE: Submitting Credits at Very End? in Design Submital - 1batch only ? |
15 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Mon, Jan 28, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
Dormitory that is No Smoking in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
287 | 186 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Tue, Jan 26, 2010 |
|
Process water for EP point in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
287 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Dec 22, 2009 |
|
RE: Recycling in CI 2009 MRp1: Storage and Collection of Recyclables |
286 | 48 |
Peter Doo Doo Consulting LLC Tue, Jan 26, 2010 |
|
What you are saying is indeed in Schools 2009 SSc9: Site Master Plan |
285 | 19 |
Erik Bergstrom Green Building Associate Wed, Dec 9, 2009 |
|
Automatic Credits for tenant improvement in new LEED Silver bldg in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
282 | 53 |
Judy Peterson Sr. Associate - NW Interior Design Heery International Wed, Sep 2, 2009 |
|
"Building Completed 1993 or Later" Tab on Graph in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
282 | 55 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Fri, Jan 22, 2010 |
|
Designated Smoking Areas in parking garages in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
281 | 71 |
Jason Franken Sustainability Professional Tue, Jun 2, 2009 |
|
How many showers & racks are needed? in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
281 | 73 |
Adolfo Silva Principal Ecovert Corporation Thu, Dec 17, 2009 |
|
RE: Which Spaces Should Be Included? in NC 2009 IEQc2: Increased Ventilation |
281 | 54 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 19, 2010 |
|
Depth of data collection required in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables |
280 | 49 |
Chris Munn Director, National Operations Chelsea Group, Ltd. Tue, Dec 1, 2009 |
|
Regionally manufactured materials in NC 2009 MRc5: Regional Materials |
279 | 143 |
Carrie Gunzel Mon, Dec 7, 2009 |
|
Energy Star for a Manufacturing - Assembly Company in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
279 | 73 |
Robert McNeice Thu, Dec 3, 2009 |
|
RE: Pin-based CFL's in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps |
278 | 102 |
Drew Johnson LEED AP O+M Tue, Dec 29, 2009 |
|
Off Site Renewable Energy in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
278 | 67 |
Reynaldo Castro Sat, Jan 9, 2010 |
|
ISSUE Part 2 in CI-2009 IEQp1: Minimum IAQ Performance |
278 | 96 |
Green Living LLC Elizabeth Gharib Tue, Jan 26, 2010 |
|
RE: Off gasing furniture in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
278 | 55 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 5, 2010 |
|
RE: What constitutes a "Master Plan"? in Schools 2009 SSc9: Site Master Plan |
278 | 19 |
Shannon Gray Consultant YRG sustainability Mon, Jan 4, 2010 |
|
Recycling in CI 2009 MRp1: Storage and Collection of Recyclables |
278 | 48 |
Peter Doo Doo Consulting LLC Thu, Jan 21, 2010 |
|
Question Regarding Requirements in Schools 2009 IEQc8.2: Daylight and Views—Views |
277 | 55 |
John Drigot Design/LEED Specialist The Neenan Company Mon, Sep 28, 2009 |
|
Existing bike storage and showers in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
277 | 73 |
Peter Doo Doo Consulting LLC Tue, Nov 17, 2009 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
WEc1 Water Efficient Landscaping in NC 2009 WEc1: Water Efficient Landscaping |
234 |
Brian Kelly Project Designer UED Fri, May 10, 2013 |
|
Private Bus Service in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access |
97 |
Daniel R Gutierrez Project Architect INGETEC Thu, May 9, 2013 |
|
Commissioning Services Contracted Through Design Firm? in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
53 |
Jaclyn Whitaker AIA LEED AP BD+C Assistant Director of Sustainability HLW International Thu, May 9, 2013 |
|
Calculating "Projection Factor" for curtainwall shading devices in CS 2009 EAp2: Minimum Energy Performance |
516 |
Amit Ahiel Thu, May 9, 2013 |
|
added FAQ in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
186 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 8, 2013 |
|
Eliminating Multiple Responses From One Person - Survey Changes in EBOM 2009 SSc4: Alternative Commuting Transportation |
232 |
Kevin Kelly Wed, May 8, 2013 |
|
2 options, Flush out and Air testing in Schools 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
23 |
Yazmin Trueba Project Engineer Sundt Construction Tue, May 7, 2013 |
|
MPR 2 - Separate Ownership in MPR2: Must be a complete, permanent building or space |
45 |
Jonathan Weiss Tue, May 7, 2013 |
|
Mixed Ventilation in NC 2009 IEQc2: Increased Ventilation |
54 |
PAULA HERNANDEZ MRS. INGENIERO MARIO PEDRO HERNANDEZ Tue, May 7, 2013 |
|
LEEDUser vs. USGBC in Pilot Credit 34: Design for Adaptability |
7 |
Nicholas Swinehart Mon, May 6, 2013 |
|
Ongoing Cx Requirements in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning |
26 |
Colleen Collins Mon, May 6, 2013 |
|
LEED Project Boundary in case of uderground parking in MPR3: Must use a reasonable site boundary |
96 |
Mario Pinoli Mon, May 6, 2013 |
|
Shuttle bus in NC v2.2 SSc4.1: Alternative Transportation—Public Transportation Access |
19 |
Valentin Grimaud Thermal Engineer TERAO Green Building Engineering Sun, May 5, 2013 |
|
LEED Signage for display inside Gold certified office building in Start a New LEED Discussion Topic |
9 |
Jeff Zunt THORSON BAKER & Associates, Inc Sun, May 5, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
Separate Buildings, Same Cellar in NC 2009 MRp1: Storage and Collection of Recyclables |
45 |
Jesus Deras Energy Analyst The Wall Consulting Group Sun, May 5, 2013 |
|
Reasonable Boundary - other support builidngs beyond project in MPR3: Must use a reasonable site boundary |
96 |
Nicole Kimoto Fri, May 3, 2013 |
|
Building Configurations in NC v2.2 EAp2: Minimum Energy Performance |
174 |
Andrew Dasso Architect Heart of America Group Fri, May 3, 2013 |
|
LEED Canada 2009 option 1 in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
193 |
nancy picard Fri, May 3, 2013 |
|
Zero-lot line project, but required to install street trees in MPR3: Must use a reasonable site boundary |
96 |
Courtney Royal, LEED AP BD+C LEED Consultant/Energy Analyst Taitem Engineering Fri, May 3, 2013 |
Copyright 2013 – BuildingGreen, Inc.