LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: E Cigarettes in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
74 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 19, 2013 |
|
Occupant feedback in EBOM 2009 IEQp3: Green Cleaning Policy |
45 |
Sheryl Swartzle LEED administration TLC Engineering for Architecture Wed, Jun 19, 2013 |
|
retention basin and infiltration on site in NC 2009 SSc6.2: Stormwater Design—Quality Control |
109 |
ADRIENN GELESZ LEED AP ABUD Engineering Ltd. Wed, Jun 19, 2013 |
|
RE: Geometry baseline vs. proposed building performance in NC v2.2 EAp2: Minimum Energy Performance |
186 |
jaume balana quadrant Wed, Jun 19, 2013 |
|
RE: Modelling Basement Parking in NC 2009 EAp2: Minimum Energy Performance |
1,426 |
Marcus Sheffer LEED Fellow 7group Wed, Jun 19, 2013 |
|
emergency Stairs in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
202 |
Omar ElRawy Wed, Jun 19, 2013 |
|
Definition direct line of sight in NC 2009 SSc8: Light Pollution Reduction |
405 |
Juliane Muench Wed, Jun 19, 2013 |
|
RE: Community Connectivity in NC 2009 SSc2: Development Density and Community Connectivity |
128 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Wed, Jun 19, 2013 |
|
Water Efficiency in Industrail Projects in Pilot Credit 18: Appliance & Process Water Use Reduction |
27 |
Steve Beck Chief Sustainability Officer LeChase Construction Services LLC Wed, Jun 19, 2013 |
|
VOC limit floor coating in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
340 |
Andreas Offele Ed. Züblin AG - Zentrale Technik TNB Wed, Jun 19, 2013 |
|
Signage matters and alternative fueling stations in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
218 |
Juliane Muench Wed, Jun 19, 2013 |
|
RE: unit (cf/storm) in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
141 |
Ameet AA Wed, Jun 19, 2013 |
|
RE: Project registered as CS2009 but developer just sold 70% in LEED Rating System Selection Q&A |
346 |
Sonia M. Miranda Palacios RA / LEED AP BD+C / QCxP cota.CERO / Estudio Grinberg Wed, Jun 19, 2013 |
|
Full extent of documenting hazardous chemicals and gases in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
191 |
Sean Hogan LEED AP RKD Architects Wed, Jun 19, 2013 |
|
Form in PIf2: Project Summary Details |
88 |
M K Wed, Jun 19, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: LEED AP registering a CI project in CI 2009 IDc2: LEED Accredited Professional |
15 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Sep 2, 2012 |
|
RE: Rainwater Harvesting in NC v2.2 EAc3: Enhanced Commissioning |
43 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 31, 2012 |
|
RE: Superfund Sites eligible for Brownfields Redevelopment credit? in NC v2.2 SSc3: Brownfield Redevelopment |
6 |
emily reese Architectural Designer / Sustainable Facility Planner Jacobs Engineering Wed, Aug 29, 2012 |
|
RE: glass not allowed in co-mingled recyclables in Schools 2009 MRp1: Storage and Collection of Recyclables |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Aug 29, 2012 |
|
RE: PC5 still available? in Pilot Credit 5: Preliminary Integrative Project Planning & Design |
35 |
Batya Metalitz Manager, LEED Technical Development USGBC Tue, Aug 28, 2012 |
|
RE: Hot Water use in Schools 2009 EAc5: Measurement and Verification |
12 |
Marcus Sheffer LEED Fellow 7group Wed, Sep 5, 2012 |
|
RE: Non-Densely Occupied Space Ventilation in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring |
8 |
Dylan Connelly Mechanical Engineer Integral Group Fri, Aug 17, 2012 |
|
RE: Whole System Integration Process Guide not referenced in Pilot Credit 60: Integrative Process |
2 |
Batya Metalitz Manager, LEED Technical Development USGBC Tue, Dec 11, 2012 |
|
RE: Annual Energy Cost Escalation in Schools 2009 EAc2: On-Site Renewable Energy |
24 |
Marcus Sheffer LEED Fellow 7group Tue, Aug 7, 2012 |
|
RE: IDc2 in CS 2009 IDc2: LEED Accredited Professional |
11 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Aug 2, 2012 |
|
RE: Double Skin in CI 2009 IEQc8.2: Daylight and Views—Views for Seated Spaces |
53 |
Todd Reed Daylight Designer 7group Wed, Sep 5, 2012 |
|
RE: For Higher Ed (or any other project type) in NC v2.2 EQc7.2: Thermal Comfort—Verification |
17 |
Emily Catacchio Sustainability Specialist Wight and Company Sun, Nov 25, 2012 |
|
RE: LEED Homes Pilot Credit 29 - Gimme Point in Pilot Credit 29: Housing & Jobs Proximity |
20 |
Jon Texter President Essex General Construction, Inc. Thu, Jun 14, 2012 |
|
RE: Legacy LEED AP in NC 2009 IDc2: LEED Accredited Professional |
35 |
Lorne Mlotek LEED AP BD+C LeadingGREEN Thu, Jun 14, 2012 |
|
RE: Required Signatory IEQp2-1 form? in Schools 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
6 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Jun 12, 2012 |
|
RE: No new parking in a big campus in Schools 2009 SSc4.4: Alternative Transportation—Parking Capacity |
19 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jun 4, 2012 |
|
RE: Combining Pathways in Pilot Credit 43: Certified Products |
21 |
Melissa Vernon Director of Sustainable Strategy Interface Mon, May 7, 2012 |
|
RE: Control on a Store in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
22 |
Sustentator Argentina Sustentator Tue, Mar 13, 2012 |
|
RE: SCS Gold Certificate in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings |
10 |
Josh Jacobs Technical Information & Public Affairs Manager UL Environment Fri, Feb 17, 2012 |
|
RE: Toilet Partitions in NC v2.2 EQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products |
27 |
Josh Jacobs Technical Information & Public Affairs Manager UL Environment Fri, Feb 3, 2012 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Dealing with MPR #6 if there is no meter in Minimum Program Requirements - energy and water reporting |
1 |
Cara Mae Cirignano Specialist, LEED Resource Development US Green Building Council Mon, Aug 30, 2010 |
|
forum response in LEED FOR COMMERCIAL INTERIORS CONSULTANT COSTS |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Aug 29, 2010 |
|
team integration in What are the credits and prerequisites in the scope of MEP Contractor? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Aug 29, 2010 |
|
Re: owner adds work outside of LEED Site Area in owner adds work outside of LEED Site Area |
1 |
David Posada Sustainability Manager GBD Architects Thu, Aug 26, 2010 |
|
RE: Re: Recycling System in Recycling System to comply with Pre-Requisite |
5 |
David Posada Sustainability Manager GBD Architects Mon, Aug 23, 2010 |
|
RE: Re: Telepresence systems in We will be adding 5 Telepresence systems for our project in San Francisco. This will reduce air travel and commuting. |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 20, 2010 |
|
Re: Parking Garage in Parking Garage |
1 |
David Posada Sustainability Manager GBD Architects Thu, Aug 19, 2010 |
|
GB standards in issues about implementation of LEED in China |
3 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Aug 18, 2010 |
|
Dr. Xing,
In my opinion, I in About the Translation of Project Drawing |
1 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Tue, Aug 17, 2010 |
|
RE: LEED-NC in Advice for buildings to be constructed in phases |
2 |
Dean Barone President Barone International Mon, Aug 16, 2010 |
|
LEED validity for D&C systems in LEED Certification validity period |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Aug 16, 2010 |
|
RE: contact GBCI in Change the registration information |
2 |
Fabio Frescia Sustainable Engineer Tue, Aug 10, 2010 |
|
EAc1 forum in ASHRAE 2004 - versus ASHRAE 2007 - 90.1 Standard |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 10, 2010 |
|
RE: Re: Additional Building Added in Middle of Project in Additional Building Added in Middle of Project |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 10, 2010 |
|
RE: kitchen facilities and LEED rating system selection in Definition of Residential |
2 |
Larry Jones Associate Atelier Ten Fri, Aug 6, 2010 |
|
LEED-CI credits on a LEED-EBOM project in Combined LEED EBO&M with LEED ID+C |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 6, 2010 |
| Paperless Submittals | - |
by Bruce Maine Thu, Aug 5, 2010 |
|
tenant scope in Which area applies to a CI certification, especially according to shared (non-rented) areas |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Aug 5, 2010 |
|
RE: LEED Reference Guide in Reference Guide |
2 |
Paul C Tue, Aug 3, 2010 |
|
upgrading to LEED 2012 and fees in Project Registration |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 3, 2010 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Interior lighting for residential project in NC 2009 SSc8: Light Pollution Reduction |
67 | 405 |
Deborah Spira Tue, Sep 28, 2010 |
|
RE: Documenting Controller Efficiency in NC 2009 WEc1: Water Efficient Landscaping |
67 | 239 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Feb 7, 2011 |
|
RE: Commissioning LEED Submittal in NC v2.2 EAc3: Enhanced Commissioning |
67 | 43 |
David Hubka GROUP Leader E3 GROUP Wed, Feb 23, 2011 |
|
Business Machine Room (doesn't generate 40,000 pages per month) in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control |
67 | 75 |
Tysa Tenebro Thu, Aug 19, 2010 |
|
Permanent Carpeted System - Internal Maint. Narrative in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control |
67 | 75 |
Eamon Geary Sustainability Director - Facilities Michael Baker Jr, Inc. Tue, Sep 21, 2010 |
|
RE: Including "Dry Gardens" in Design Case in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
67 | 77 |
Carlie Bullock-Jones, LEED Fellow Principal Ecoworks Studio Sun, Aug 22, 2010 |
|
RE: Including "Dry Gardens" in Design Case in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
67 | 77 |
Gary Ashford Architect Duket Architects Planners Wed, Sep 8, 2010 |
|
LEED CI v2.0 EQc4.5 Template in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating |
66 | 104 |
Katrina Rosa Owner The EcoLogic Studio Wed, Aug 25, 2010 |
|
RE: Reused furniture from old office in CI 2009 MRc5: Regional Materials |
66 | 78 |
Patrick Moore GBD Architects, Inc Tue, Aug 24, 2010 |
|
50 % Pervious Pavement or Each Paver need to be 50% Pervious? in CI 2009 SSc1: Site Selection |
66 | 159 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Mon, Sep 13, 2010 |
|
Default value for open grid paver. in CI 2009 SSc1: Site Selection |
66 | 159 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Mon, Sep 13, 2010 |
|
LT Bicycle Network, Storage and Changing Rooms in Comment on the New LEED Rating System Draft to be Released in 2012 |
66 | 97 |
Linda Smithe Fri, Jan 14, 2011 |
|
LT Appendix 2 in Comment on the New LEED Rating System Draft to be Released in 2012 |
66 | 97 |
Linda Smithe Fri, Jan 14, 2011 |
|
RE: just what I needed! in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
66 | 12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 8, 2011 |
|
RE: What should USGBC do with the extra time to ensure success? in LEED 2012 Postponed to 2013, Renamed LEED v4 |
66 | 28 |
Lorne Mlotek LEED AP BD+C LeadingGREEN Tue, Jun 5, 2012 |
|
RE: Project Boundary in LEED Minimum Program Requirements |
66 | 428 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Jan 20, 2011 |
|
RE: Mixed Mode Systems in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
66 | 117 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Tue, Feb 15, 2011 |
|
RE: Can I exclude a portion of the building? in NC 2009 IEQc7.1: Thermal Comfort—Design |
66 | 138 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Tue, Aug 31, 2010 |
|
RE: Lighting power of roof garden. in NC 2009 SSc8: Light Pollution Reduction |
66 | 405 |
Bill Swanson PE, LEED AP Integrated Architecture Mon, Apr 2, 2012 |
|
Reference ET rates in NC 2009 WEc1: Water Efficient Landscaping |
66 | 239 |
mark peternell Fri, Mar 11, 2011 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Use as an Innovation Credit in Healthcare-v2009: PBT source reduction - lead, cadmium and copper |
3 |
Peter Doo Doo Consulting LLC Tue, Oct 2, 2012 |
|
Spreadsheet for Data Centers in NC 2009 EAc1: Optimize Energy Performance |
839 |
Ricardo Marques Fri, Sep 28, 2012 |
|
polyurethane foam in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
296 |
Anderson Benite Tue, Sep 25, 2012 |
|
Purchase required for EBOM in Pilot Credit 18: Appliance & Process Water Use Reduction |
27 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Tue, Sep 25, 2012 |
|
Using Specs effectively during construction in Did you remember to...? List of things it's best not to forget on a project |
1 |
Peggy White White + GreenSpec Mon, Sep 24, 2012 |
|
LEED H Pilot Credit 9 in Pilot Credit 9: Street Network |
67 |
Alexander Morris Associate Wallace Roberts & Todd, LLC Mon, Sep 24, 2012 |
|
FSC vs SFI in Does LEED Kill Jobs? Lobbyist Claims Don't Hold Up |
11 |
Alexander Morris Associate Wallace Roberts & Todd, LLC Mon, Sep 24, 2012 |
|
No Zone 8 option for Athena EcoCalculator in Pilot Credit 1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials |
42 |
Design Alaska Chief Mechanical Engineer Design Alaska Fri, Sep 21, 2012 |
|
Units of measurement in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases |
5 |
Amy Van Dam Sustainable Design Coordinator Boulder Associates Architects Fri, Sep 21, 2012 |
|
Include low-occupancy storage/lab in LEED boundary? - MPR3&5 in LEED Minimum Program Requirements |
428 |
Design Alaska Chief Mechanical Engineer Design Alaska Thu, Sep 20, 2012 |
|
CHP Electric Output in NC 2009 EAc1: Optimize Energy Performance |
839 |
Francesco Passerini Thu, Sep 20, 2012 |
|
Governmental Cutting of Corners in "Wood Wars" Continue, with Military Losing |
1 |
Kaida Smith Thu, Sep 20, 2012 |
|
Recycling in Malaysia in CI 2009 MRp1: Storage and Collection of Recyclables |
48 |
Joel Cesare Tue, Sep 18, 2012 |
|
Clarify roof of underground parking & fallout shelter inside? in PI Form 2 Project Summary Details |
65 |
Ward Miller Chief Environmental Officer Alpenglow Advisory Mon, Sep 17, 2012 |
|
The way it used to be... in New USGBC Membership Fee Structure |
55 |
Hernando Miranda Owner Soltierra LLC Mon, Sep 17, 2012 |
|
LEED gym on campus in New LEED Guidance for Campuses and Multiple Buildings |
327 |
maartje van roosmalen senior sustainable design consultant Kaer Pte Ltd Sun, Sep 16, 2012 |
|
Help with a new study of green water technologies! in NC 2009 WEp1: Water Use Reduction—20% Reduction |
431 |
Chris Pyke Director, Research USGBC Fri, Sep 14, 2012 |
|
Comprehensive Transportation management Plan. in NC v2.2 IDc1: Innovation in Design |
122 |
Elle Brown Mon, Sep 10, 2012 |
|
Clarification: Portfolio Manager - Energy Audit in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
76 |
Ashley Chiang Sustainability and Climate Analyst UC Merced Fri, Sep 7, 2012 |
|
Multiple Units - Shared Returns in CI-2009 IEQp1: Minimum IAQ Performance |
99 |
Mike Oliva Thu, Sep 6, 2012 |
Copyright 2013 – BuildingGreen, Inc.