Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    Submittal templates in metric Units
    in PIf1: Minimum Program Requirements
    66 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 25, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    109 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Fri, May 24, 2013
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Title Comments Most Recent Post
    Submittal templates in metric Units
    in PIf1: Minimum Program Requirements
    66 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 25, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    109 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Fri, May 24, 2013
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    RE: How to define vision glazing
    in NC 2009 IEQc8.2: Daylight and Views—Views
    248 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    120 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Thu, May 23, 2013
    RE: Property Boundry.
    in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
    2 Candace Small
    Thu, May 23, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    34 Candace Small
    Thu, May 23, 2013
    Title Comments Most Recent Post
    RE: Performance period management
    in Shortest Possible Performance Period
    2 Jenny Carney
    Principal
    YR&G
    Tue, Jun 1, 2010
    Post to credit
    in DAYSIM 3.0
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Jun 1, 2010
    YRG
    in LEED Consultant Needed - construction centric
    2 Joshua Radoff
    Principal, LEEDuser Primary Author
    YRG sustainability
    Mon, May 31, 2010
    Green roofs and habitat
    in Green roofs and habitat restoration
    1 David Posada
    Sustainability Manager
    GBD Architects
    Fri, May 28, 2010
    RE: What does this mean for current projects under review?
    in GBCI To Do Away with Certification Bodies?
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 26, 2010
    Split review
    in New Credits After Application?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 26, 2010
    Wheatboard Manufacturers on the East Coast - by Linda Davisson
    Wed, May 26, 2010
    Multiple building guidance
    in Project registreation/ 2 buildings, one site.
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 26, 2010
    Post to WEc1
    in LEED standard for watering of Lanscape!
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 25, 2010
    RE: Check with GBCI on multiple building application
    in Certifying mechanical services buildings
    2 Lakshmi Suryan
    Architect / LEED AP
    Tue, May 25, 2010
    RE: Yes, it's possible
    in Attempt credit after the construction review
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, May 24, 2010
    Horizontally attached buildings
    in Vertically Attached Buildings
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, May 24, 2010
    Is LEED still leading the EE front? - by Andrew Michler
    Mon, May 24, 2010
    LEEDuser subscription
    in Spec language
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 21, 2010
    RE: LEED Trivia
    in Test your knowledge of building reuse and LEED MR credits!
    5 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 21, 2010
    Test your knowledge of the history of LEED – Trivia Friday - by Tristan Roberts
    Fri, May 21, 2010
    Post-Occupancy Tools - by Jenny Carney
    Thu, May 20, 2010
    Try a LEED consultant
    in Is it possible to invite a USGBC representative to visit the job site
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, May 17, 2010
    Varies by MR credit
    in LEED CI-Div. 12 Furniture and Furnishings
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, May 16, 2010
    RE: Natural Ventilation
    in Natural Ventilation for Low Ambient Cooling
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 14, 2010
    Title Votes Comments Most Recent Post
    Option 1 - CO2 sensors
    in NC v2.2 EAc1: Optimize Energy Performance
    62 257 Omar Katanani
    Mon, Sep 13, 2010
    Pricing - Toolkit
    in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
    62 67 Paul C
    Fri, Sep 17, 2010
    RE: All weather pathways?
    in Pilot Credit 9: Street Network
    62 67 Cory Benson
    Managing Director
    Made Sustainable
    Wed, Sep 29, 2010
    RE: 100 year flood for project outside US?
    in NC 2009 SSc1: Site Selection
    62 56 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 16, 2010
    RE: Reused furniture works against you for MRc4?
    in CI 2009 MRc3.2: Materials Reuse—Furniture and Furnishings
    62 48 Angelica Ospina Alvarado
    Wed, Aug 25, 2010
    Incorrect payback period
    in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis
    62 36 ZEB Tech singapore
    ESD Consultancy
    ZEB-Technology Pte Ltd
    Sun, Aug 8, 2010
    Innovation in Design Credit
    in Schools 2009 IEQc10: Mold Prevention
    62 26 steven maynard
    Wed, Aug 25, 2010
    RE: Bike Lanes for Urban Schools
    in Schools 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
    62 28 Carly Ruggieri
    Senior Sustainability Consultant
    Steven Winter Associates, Inc.
    Wed, Aug 25, 2010
    RE: right to access checklist
    in EBOM 2009 SSc1: LEED Certified Design and Construction
    62 26 Dan Ackerstein
    Principal
    Ackerstein Sustainability, LLC
    Mon, Aug 16, 2010
    RE: Commissioning LEED Submittal
    in NC v2.2 EAc3: Enhanced Commissioning
    62 43 Mary Petrovich
    Senior Sustainability Associate
    Center for Maximum Potential Building Systems
    Wed, Mar 30, 2011
    RE: Base Line Budget and Change Orders
    in NC v2.2 MRc6: Rapidly Renewable Materials
    62 23 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Aug 20, 2010
    Including "Dry Gardens" in Design Case
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    61 77 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Tue, Aug 10, 2010
    RE: VOC Methodologies
    in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    61 63 Carmelito Tatlonghari
    LEED-AP BD+C
    Leighton Contractors Philippines, Inc.
    Wed, Sep 8, 2010
    RE: Controller Efficiency (CE) data
    in NC 2009 WEc1: Water Efficient Landscaping
    61 236 Amy Rider
    Sustainability Manager
    KEMA Services
    Fri, Nov 12, 2010
    Concrete Curing Systems
    in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
    61 287 Tim Rogers
    Designer
    The Clark Enersen Partners
    Tue, Aug 24, 2010
    Existing AHU serves more than the LEED tenant space- what to do?
    in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    61 58 Kathy Buck
    Senior Project Manager
    Neumann/Smith Architecture
    Thu, Aug 5, 2010
    Energy Model
    in CS 2009 EAc1: Optimize Energy Performance
    61 207 Oliver Preuss Hernandez
    Mon, Dec 19, 2011
    RE: Does hotel type building can achieve this credit?
    in NC 2009 IEQc7.2: Thermal Comfort—Verification
    61 61 Allison Beer McKenzie
    Architect, Director of Sustainability
    SHP Leading Design
    Mon, Aug 16, 2010
    RE: Does hotel type building can achieve this credit?
    in NC 2009 IEQc7.2: Thermal Comfort—Verification
    61 61 Steve Loppnow
    Sustainability Manager
    YR&G
    Mon, Aug 16, 2010
    RE: Does hotel type building can achieve this credit?
    in NC 2009 IEQc7.2: Thermal Comfort—Verification
    61 61 Allison Beer McKenzie
    Architect, Director of Sustainability
    SHP Leading Design
    Mon, Aug 16, 2010
    Title Comments Most Recent Post
    2012 public comment
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Apr 11, 2012
    Non-fossil fuel in district heat
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 Jens Apel
    Wed, Apr 11, 2012
    White ceramic tile
    in NC 2009 SSc7.2: Heat Island Effect—Roof
    164 ICE Co.
    Indochine Engineering Vietnam Ltd
    Wed, Apr 11, 2012
    Jasmin,
    in Addition (second construction phase) to LEED certified building
    1 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Tue, Apr 10, 2012
    Motors that should be covered by 90.1 efficiency requirement
    in LEED for Healthcare forum - LEED-HC users welcome!
    116 James Chueh
    Tue, Apr 10, 2012
    Integrated Water Budget
    in LEED 2012 – 3rd Public Comment – WE (Water Efficiency) Section
    14 ROBIN KINERK
    Owner
    Kinerk Strategic Marketing
    Mon, Apr 9, 2012
    What to do when electricity produces less carbon than gas?
    in NC 2009 EAc1: Optimize Energy Performance
    821 Raphael Sperry
    Simon & Associates, Inc. Green Building Sonsultants
    Fri, Apr 6, 2012
    Green Cleaning
    in NC 2009 IDc1: Innovation in Design
    367 Lauren Ford
    Project Architect
    Cooper Carry
    Fri, Apr 6, 2012
    Central Plant Equipment Under scope of credit?
    in Pilot Credit 18: Appliance & Process Water Use Reduction
    25 Janene Bolt
    Interior Designer
    Clark Nexsen Architecture Engineering
    Wed, Apr 4, 2012
    DES Option 1 or Option 2
    in NC 2009 EAc1: Optimize Energy Performance
    821 Mary Ann Santos
    Tue, Apr 3, 2012
    EAp2-7 Example Spreadsheet
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 AAME User
    Mon, Apr 2, 2012
    lease agreement for residential units
    in CS-2009 IEQp1: Minimum IAQ Performance
    90 Carolina Vergnano
    LEED AP
    Concremat
    Thu, Mar 29, 2012
    Project on Military base (or campus)...help
    in PI Form 2 Project Summary Details
    65 Justin Sack
    Crafton Tull
    Thu, Mar 29, 2012
    Air Sealing between demising walls in Mid-rise
    in LEED for Homes (LEED-H) Forum
    97 Ian Johnson
    Project Director
    Thornton Tomasetti - Fore Solutions
    Wed, Mar 28, 2012
    Ebie awards
    in Could Your Existing Building Win an EBie Award?
    4 Craig Bloomfield
    Mon, Mar 26, 2012
    Problems with ID&C
    in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
    107 Melissa Wrolstad
    Fri, Mar 23, 2012
    video overview of proposed LEED 2012 changes
    in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
    107 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Mar 22, 2012
    Evolution of LEED - incremental change or sweeping updates?
    in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
    107 Mara Baum
    Healthcare Sustainable Design Leader
    HOK
    Thu, Mar 22, 2012
    EA PR2
    in LEEDuser’s Guide to Key Changes in LEED-EBOM 2012 – 3rd Public Comment
    40 John Burnett
    FAC-LEEDership
    Thu, Mar 22, 2012
    EBie Submission Period Extended to April 2
    in Could Your Existing Building Win an EBie Award?
    4 Christina Anjesky
    Director, Development and Communications
    Urban Green Council
    Wed, Mar 21, 2012

    Copyright 2013 – BuildingGreen, Inc.