Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    Submittal templates in metric Units
    in PIf1: Minimum Program Requirements
    66 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 25, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    109 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Fri, May 24, 2013
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Title Comments Most Recent Post
    RE: Making progress?
    in Pilot Credit 3: Medical and Process Equipment Efficiency
    23 Brian Alessi
    Sustainability Project Manager
    The Sheward Partnership, LLC
    Tue, Dec 11, 2012
    RE: Exclude Existing Lights From Calculation?
    in Schools 2009 SSc8: Light Pollution Reduction
    46 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Tue, Oct 2, 2012
    Recycling in Malaysia
    in CI 2009 MRp1: Storage and Collection of Recyclables
    48 Joel Cesare
    Tue, Sep 18, 2012
    RE: Asphalt Paving with white paint coating
    in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
    30 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 11, 2012
    RE: Participation in Online Forum
    in Pilot Credit 6: Integrative Project Planning & Design
    25 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 11, 2012
    RE: Sample size for air speed measurements
    in EBOM 2009 IEQc2.3: Occupant Comfort—Thermal Comfort Monitoring
    25 Jason Franken
    Sustainability Professional
    Mon, Sep 10, 2012
    RE: IEQp1- A3 Table Mechanical Ventilation 100%OA
    in Schools-2009 IEQp1: Minimum IAQ Performance
    19 Dylan Connelly
    Mechanical Engineer
    Integral Group
    Tue, Sep 4, 2012
    RE: Historical uses
    in Pilot Credit 16: Rainwater Management
    7 Theresa Backhus
    Sites Technical Specialist
    USGBC
    Tue, Dec 11, 2012
    RE: Materials Counted for other MR Credits
    in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
    6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 4, 2012
    RE: Plastics/PVC and Flooring
    in EBOM 2009 MRc9: Solid Waste Management—Facility Alterations and Additions
    18 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Sep 3, 2012
    RE: LEED AP registering a CI project
    in CI 2009 IDc2: LEED Accredited Professional
    15 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Sep 2, 2012
    RE: Rainwater Harvesting
    in NC v2.2 EAc3: Enhanced Commissioning
    43 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Aug 31, 2012
    RE: Superfund Sites eligible for Brownfields Redevelopment credit?
    in NC v2.2 SSc3: Brownfield Redevelopment
    6 emily reese
    Architectural Designer / Sustainable Facility Planner
    Jacobs Engineering
    Wed, Aug 29, 2012
    RE: glass not allowed in co-mingled recyclables
    in Schools 2009 MRp1: Storage and Collection of Recyclables
    12 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Aug 29, 2012
    RE: PC5 still available?
    in Pilot Credit 5: Preliminary Integrative Project Planning & Design
    35 Batya Metalitz
    Manager, LEED Technical Development
    USGBC
    Tue, Aug 28, 2012
    RE: Hot Water use
    in Schools 2009 EAc5: Measurement and Verification
    12 Marcus Sheffer
    LEED Fellow
    7group
    Wed, Sep 5, 2012
    RE: Non-Densely Occupied Space Ventilation
    in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring
    8 Dylan Connelly
    Mechanical Engineer
    Integral Group
    Fri, Aug 17, 2012
    RE: Whole System Integration Process Guide not referenced
    in Pilot Credit 60: Integrative Process
    2 Batya Metalitz
    Manager, LEED Technical Development
    USGBC
    Tue, Dec 11, 2012
    RE: Annual Energy Cost Escalation
    in Schools 2009 EAc2: On-Site Renewable Energy
    24 Marcus Sheffer
    LEED Fellow
    7group
    Tue, Aug 7, 2012
    RE: IDc2
    in CS 2009 IDc2: LEED Accredited Professional
    11 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Aug 2, 2012
    Title Comments Most Recent Post
    RE: Legacy LEED APs can earn IDc2 in LEED 2009 projects
    in Can a legacy LEED AP participate in LEED V3 projects??
    5 Larry Sims
    Principal
    Studio4, LLC
    Thu, Sep 16, 2010
    RE: mixed use means LEED-NC or CS
    in LEED for homes in South East Asia
    2 Robert Himmler
    EGS-plan International GmbH
    Sun, Sep 12, 2010
    RE: GSHP
    in ground source heating & cooling
    2 Melissa Kemp
    President
    Premium Organization
    Fri, Sep 10, 2010
    RE: Wiggle Room
    in LEED EB O & M Submission Period
    2 Jason Franken
    Sustainability Professional
    Wed, Sep 8, 2010
    Fee Schedule
    in What is your Fee Schedule for EBOM Projects?
    1 Dan Ackerstein
    Principal
    Ackerstein Sustainability, LLC
    Wed, Sep 8, 2010
    check with GBCI
    in Time frame of certification: Two building parts with different completion
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 8, 2010
    LEED AP credential maintenance
    in LEED exams+ maintain credential
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 8, 2010
    Announcing Free Webinar on LEED-CI Certification - by Tristan Roberts
    Wed, Sep 8, 2010
    RE: renovation under LEED-CS
    in Core and Shell for an Existing Building Renovation
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 7, 2010
    RE: Low VOC tested products in China
    in Challenges we encountered in the LEED consulting process for China projects
    2 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Tue, Sep 7, 2010
    RE: To try and answer your
    in Some problems we faced in the progress of LEED consulting in China
    5 Julian Bott
    Principal Design Consultant
    Cundall Hong Kong
    Fri, Sep 3, 2010
    RE: CIRs and LEED Interpretation changes
    in USGBC to Offer Precedent-Setting LEED Interpretations, Along with CIRs
    10 David Posada
    Sustainability Manager
    GBD Architects
    Fri, Sep 3, 2010
    CS Appendix 3
    in FTE - vacant suites
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Sep 3, 2010
    Re: Construction Documents
    in Construction Documents
    1 David Posada
    Sustainability Manager
    GBD Architects
    Thu, Sep 2, 2010
    RE: MPRs and temporary structures
    in Sem-Permanent Buildings
    4 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Sep 1, 2010
    official word from USGBC
    in The Future of CIRs in LEED
    6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Aug 31, 2010
    RE: rating system selection policy
    in LEED-Commercial Interiors Certification
    2 Anderson Benite
    Tue, Aug 31, 2010
    Dealing with MPR #6 if there is no meter
    in Minimum Program Requirements - energy and water reporting
    1 Cara Mae Cirignano
    Specialist, LEED Resource Development
    US Green Building Council
    Mon, Aug 30, 2010
    forum response
    in LEED FOR COMMERCIAL INTERIORS CONSULTANT COSTS
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Aug 29, 2010
    team integration
    in What are the credits and prerequisites in the scope of MEP Contractor?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Aug 29, 2010
    Title Votes Comments Most Recent Post
    RE: How to address area requirements
    in CS 2009 SSc7.2: Heat Island Effect—Roof
    67 83 Xavi B
    Thu, Sep 16, 2010
    RE: Does hotel type building can achieve this credit?
    in NC 2009 IEQc7.2: Thermal Comfort—Verification
    67 61 Christopher Schaffner
    Principal & Founder
    The Green Engineer, LLP
    Thu, Sep 9, 2010
    Collected StromWater for irrigation
    in EBOM 2009 SSc6: Stormwater Quantity Control
    67 50 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Thu, Sep 16, 2010
    RE: Solid Surface Materials; Quartz, Corian, etc. claiming Regional
    in NC 2009 MRc5: Regional Materials
    67 143 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 16, 2010
    Energy Star: User Consumption in Multi Tenant Buildings
    in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
    67 392 Joerg Schlenger
    Dr.-Ing.
    Drees&Sommer Advanced Building Technologies GmbH
    Mon, Sep 27, 2010
    Business Machine Room (doesn't generate 40,000 pages per month)
    in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control
    67 75 Tysa Tenebro
    Thu, Aug 19, 2010
    Permanent Carpeted System - Internal Maint. Narrative
    in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control
    67 75 Eamon Geary
    Sustainability Director - Facilities
    Michael Baker Jr, Inc.
    Tue, Sep 21, 2010
    RE: CI V3 - IEQp1 Uploads
    in CI-2009 IEQp1: Minimum IAQ Performance
    67 96 Malik Rehman
    Wed, Sep 1, 2010
    RE: LEED compliant trash liners
    in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
    67 84 Jason Franken
    Sustainability Professional
    Tue, Aug 10, 2010
    RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    67 55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Jul 27, 2010
    RE: Incorrect payback period
    in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis
    67 36 Pierce Holstrom
    Director of Engineering
    Environmental Building Strategies
    Wed, Aug 11, 2010
    RE: Energy Star and Energy & Water Data Release Form
    in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
    67 96 Pablo Fortunato Suarez
    Principal ESD Consultant/Architect
    GreenArc Sustainable Building & Architecture
    Thu, Aug 12, 2010
    RE: Commissioning LEED Submittal
    in NC v2.2 EAc3: Enhanced Commissioning
    67 43 David Hubka
    GROUP Leader
    E3 GROUP
    Wed, Feb 23, 2011
    RE: DES Commissioning (upstream)
    in NC v2.2 EAc3: Enhanced Commissioning
    67 43 Adam Targowski
    Owner
    ATsec
    Mon, Jul 25, 2011
    RE: Cost of ASHRAE Level I Energy Audit
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    66 74 Kimberly Frith
    Sustainability Consultant
    Alto Sustainability, LLC
    Wed, Aug 18, 2010
    Reference ET rates
    in NC 2009 WEc1: Water Efficient Landscaping
    66 236 mark peternell
    Fri, Mar 11, 2011
    RE: Unirrigated areas in Option 1
    in NC 2009 WEc1: Water Efficient Landscaping
    66 236 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Apr 8, 2011
    RE: Lighting power of roof garden.
    in NC 2009 SSc8: Light Pollution Reduction
    66 397 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Mon, Apr 2, 2012
    50 % Pervious Pavement or Each Paver need to be 50% Pervious?
    in CI 2009 SSc1: Site Selection
    66 159 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Mon, Sep 13, 2010
    Default value for open grid paver.
    in CI 2009 SSc1: Site Selection
    66 159 Chi-Chung Sue
    Steven Leach International Asia Inc. Taiwan Branch
    Mon, Sep 13, 2010
    Title Comments Most Recent Post
    LEED GREEN ASSOCIATE FREE QUIZ
    in LEED Green Associate Test Prep Resources
    1 Lorne Mlotek
    LEED AP BD+C
    LeadingGREEN
    Wed, Jul 4, 2012
    U-value unheated/heated slab-on-grade floor
    in NC 2009 EAc1: Optimize Energy Performance
    821 Francesco Passerini
    Wed, Jul 4, 2012
    LEED for Existing Homes
    in LEED for EB- O&M for Homes
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Jul 2, 2012
    Interpretations Database
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    27 Marcus Sheffer
    LEED Fellow
    7group
    Wed, Jun 27, 2012
    ID Credit for New Construction Projects
    in EBOM 2009 WEc1: Water Performance Measurement
    66 Heather Holdridge
    Sustainability Coordinator
    Lake/Flato Architects
    Wed, Jun 27, 2012
    Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads
    in LEED for Homes (LEED-H) Forum
    97 Kathy Kahill
    PDT Architects
    Wed, Jun 27, 2012
    Tenant storage vs Host Building storage.
    in CI 2009 MRp1: Storage and Collection of Recyclables
    48 Luis Leal
    Luis Leal
    CTE
    Tue, Jun 26, 2012
    Partial tenant occupancy with no core water fixtures
    in CS 2009 WEp1: Water Use Reduction—20% Reduction
    159 Laurent Kanago
    Partner
    Ecohill Solutions
    Mon, Jun 25, 2012
    City review of LEED project = LEED experience?
    in Do you have questions for GBCI?
    44 Valerie J. Amor
    Visionary - CEO/President/Founder
    Drawing Conclusions LLC
    Sun, Jun 24, 2012
    LEED speciality will need to match to project type?
    in Do you have questions for GBCI?
    44 Valerie J. Amor
    Visionary - CEO/President/Founder
    Drawing Conclusions LLC
    Sun, Jun 24, 2012
    EAc1 model and EAc6 calcs
    in Performing LEED Green Power Calculations
    10 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Jun 22, 2012
    Laundry drain water
    in Pilot Credit 10: Sustainable Wastewater Management
    33 Wei Jiang
    Fri, Jun 22, 2012
    Multiple Buildings
    in PI Form 2 Project Summary Details
    65 Dhanujie Jayapala
    Sustainability Executive
    MAS Active Trading Pvt Ltd
    Wed, Jun 20, 2012
    Mechanically Ventilated Areas
    in CS-2009 IEQp1: Minimum IAQ Performance
    90 Angela Saggin
    Tue, Jun 19, 2012
    ID Credit - Building as a Teaching Tool
    in NC 2009 IDc1: Innovation in Design
    367 Kellin Vellenoweth
    Fri, Jun 15, 2012
    Item 6
    in Top Six Things LEED Consultants Do Wrong in Specs
    5 Tom Fisher
    Wed, Jun 13, 2012
    estimating system Ds
    in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
    213 AAME User
    Wed, Jun 13, 2012
    LEED Specifications
    in Top Six Things LEED Consultants Do Wrong in Specs
    5 Michael Heacock
    Architect, LEED AP
    Michael Heacock Architect, Inc.
    Wed, Jun 13, 2012
    Dan,
    in LEED Submittal Forms, Beta to v3
    1 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Tue, Jun 12, 2012
    Defining "One Building"
    in PI Form 2 Project Summary Details
    65 Chris DeVolder
    360 Architecture
    Mon, Jun 11, 2012

    Copyright 2013 – BuildingGreen, Inc.