LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
Submittal templates in metric Units in PIf1: Minimum Program Requirements |
66 |
BABAR MEHMOOD SAUD CONSULT Sat, May 25, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
109 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, May 24, 2013 |
|
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values in NC 2009 EAp2: Minimum Energy Performance |
1,381 |
TOMAS URIBE PROJECT MANAGER SOLUCIONES ENERGETICAS SOSTENIBLES Fri, May 24, 2013 |
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
RE: Gravel in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
167 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
RE: EA Credit 1 - Using available waste oil for heating in NC 2009 EAc1: Optimize Energy Performance |
821 |
Marcus Sheffer LEED Fellow 7group Fri, May 24, 2013 |
|
RE: Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
124 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Making progress? in Pilot Credit 3: Medical and Process Equipment Efficiency |
23 |
Brian Alessi Sustainability Project Manager The Sheward Partnership, LLC Tue, Dec 11, 2012 |
|
RE: Exclude Existing Lights From Calculation? in Schools 2009 SSc8: Light Pollution Reduction |
46 |
Bill Swanson PE, LEED AP Integrated Architecture Tue, Oct 2, 2012 |
|
Recycling in Malaysia in CI 2009 MRp1: Storage and Collection of Recyclables |
48 |
Joel Cesare Tue, Sep 18, 2012 |
|
RE: Asphalt Paving with white paint coating in NC v2.2 SSc7.1: Heat Island Effect—Nonroof |
30 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 11, 2012 |
|
RE: Participation in Online Forum in Pilot Credit 6: Integrative Project Planning & Design |
25 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 11, 2012 |
|
RE: Sample size for air speed measurements in EBOM 2009 IEQc2.3: Occupant Comfort—Thermal Comfort Monitoring |
25 |
Jason Franken Sustainability Professional Mon, Sep 10, 2012 |
|
RE: IEQp1- A3 Table Mechanical Ventilation 100%OA in Schools-2009 IEQp1: Minimum IAQ Performance |
19 |
Dylan Connelly Mechanical Engineer Integral Group Tue, Sep 4, 2012 |
|
RE: Historical uses in Pilot Credit 16: Rainwater Management |
7 |
Theresa Backhus Sites Technical Specialist USGBC Tue, Dec 11, 2012 |
|
RE: Materials Counted for other MR Credits in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 4, 2012 |
|
RE: Plastics/PVC and Flooring in EBOM 2009 MRc9: Solid Waste Management—Facility Alterations and Additions |
18 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Sep 3, 2012 |
|
RE: LEED AP registering a CI project in CI 2009 IDc2: LEED Accredited Professional |
15 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Sep 2, 2012 |
|
RE: Rainwater Harvesting in NC v2.2 EAc3: Enhanced Commissioning |
43 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 31, 2012 |
|
RE: Superfund Sites eligible for Brownfields Redevelopment credit? in NC v2.2 SSc3: Brownfield Redevelopment |
6 |
emily reese Architectural Designer / Sustainable Facility Planner Jacobs Engineering Wed, Aug 29, 2012 |
|
RE: glass not allowed in co-mingled recyclables in Schools 2009 MRp1: Storage and Collection of Recyclables |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Aug 29, 2012 |
|
RE: PC5 still available? in Pilot Credit 5: Preliminary Integrative Project Planning & Design |
35 |
Batya Metalitz Manager, LEED Technical Development USGBC Tue, Aug 28, 2012 |
|
RE: Hot Water use in Schools 2009 EAc5: Measurement and Verification |
12 |
Marcus Sheffer LEED Fellow 7group Wed, Sep 5, 2012 |
|
RE: Non-Densely Occupied Space Ventilation in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring |
8 |
Dylan Connelly Mechanical Engineer Integral Group Fri, Aug 17, 2012 |
|
RE: Whole System Integration Process Guide not referenced in Pilot Credit 60: Integrative Process |
2 |
Batya Metalitz Manager, LEED Technical Development USGBC Tue, Dec 11, 2012 |
|
RE: Annual Energy Cost Escalation in Schools 2009 EAc2: On-Site Renewable Energy |
24 |
Marcus Sheffer LEED Fellow 7group Tue, Aug 7, 2012 |
|
RE: IDc2 in CS 2009 IDc2: LEED Accredited Professional |
11 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Aug 2, 2012 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Legacy LEED APs can earn IDc2 in LEED 2009 projects in Can a legacy LEED AP participate in LEED V3 projects?? |
5 |
Larry Sims Principal Studio4, LLC Thu, Sep 16, 2010 |
|
RE: mixed use means LEED-NC or CS in LEED for homes in South East Asia |
2 |
Robert Himmler EGS-plan International GmbH Sun, Sep 12, 2010 |
|
RE: GSHP in ground source heating & cooling |
2 |
Melissa Kemp President Premium Organization Fri, Sep 10, 2010 |
|
RE: Wiggle Room in LEED EB O & M Submission Period |
2 |
Jason Franken Sustainability Professional Wed, Sep 8, 2010 |
|
Fee Schedule in What is your Fee Schedule for EBOM Projects? |
1 |
Dan Ackerstein Principal Ackerstein Sustainability, LLC Wed, Sep 8, 2010 |
|
check with GBCI in Time frame of certification: Two building parts with different completion |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 8, 2010 |
|
LEED AP credential maintenance in LEED exams+ maintain credential |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 8, 2010 |
| Announcing Free Webinar on LEED-CI Certification | - |
by Tristan Roberts Wed, Sep 8, 2010 |
|
RE: renovation under LEED-CS in Core and Shell for an Existing Building Renovation |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 7, 2010 |
|
RE: Low VOC tested products in China in Challenges we encountered in the LEED consulting process for China projects |
2 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Tue, Sep 7, 2010 |
|
RE: To try and answer your in Some problems we faced in the progress of LEED consulting in China |
5 |
Julian Bott Principal Design Consultant Cundall Hong Kong Fri, Sep 3, 2010 |
|
RE: CIRs and LEED Interpretation changes in USGBC to Offer Precedent-Setting LEED Interpretations, Along with CIRs |
10 |
David Posada Sustainability Manager GBD Architects Fri, Sep 3, 2010 |
|
CS Appendix 3 in FTE - vacant suites |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 3, 2010 |
|
Re: Construction Documents in Construction Documents |
1 |
David Posada Sustainability Manager GBD Architects Thu, Sep 2, 2010 |
|
RE: MPRs and temporary structures in Sem-Permanent Buildings |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 1, 2010 |
|
official word from USGBC in The Future of CIRs in LEED |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Aug 31, 2010 |
|
RE: rating system selection policy in LEED-Commercial Interiors Certification |
2 |
Anderson Benite Tue, Aug 31, 2010 |
|
Dealing with MPR #6 if there is no meter in Minimum Program Requirements - energy and water reporting |
1 |
Cara Mae Cirignano Specialist, LEED Resource Development US Green Building Council Mon, Aug 30, 2010 |
|
forum response in LEED FOR COMMERCIAL INTERIORS CONSULTANT COSTS |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Aug 29, 2010 |
|
team integration in What are the credits and prerequisites in the scope of MEP Contractor? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Aug 29, 2010 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: How to address area requirements in CS 2009 SSc7.2: Heat Island Effect—Roof |
67 | 83 |
Xavi B Thu, Sep 16, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
67 | 61 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Thu, Sep 9, 2010 |
|
Collected StromWater for irrigation in EBOM 2009 SSc6: Stormwater Quantity Control |
67 | 50 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Thu, Sep 16, 2010 |
|
RE: Solid Surface Materials; Quartz, Corian, etc. claiming Regional in NC 2009 MRc5: Regional Materials |
67 | 143 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Sep 16, 2010 |
|
Energy Star: User Consumption in Multi Tenant Buildings in EBOM 2009 EAp2: Minimum Energy Efficiency Performance |
67 | 392 |
Joerg Schlenger Dr.-Ing. Drees&Sommer Advanced Building Technologies GmbH Mon, Sep 27, 2010 |
|
Business Machine Room (doesn't generate 40,000 pages per month) in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control |
67 | 75 |
Tysa Tenebro Thu, Aug 19, 2010 |
|
Permanent Carpeted System - Internal Maint. Narrative in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control |
67 | 75 |
Eamon Geary Sustainability Director - Facilities Michael Baker Jr, Inc. Tue, Sep 21, 2010 |
|
RE: CI V3 - IEQp1 Uploads in CI-2009 IEQp1: Minimum IAQ Performance |
67 | 96 |
Malik Rehman Wed, Sep 1, 2010 |
|
RE: LEED compliant trash liners in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials |
67 | 84 |
Jason Franken Sustainability Professional Tue, Aug 10, 2010 |
|
RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
67 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Jul 27, 2010 |
|
RE: Incorrect payback period in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis |
67 | 36 |
Pierce Holstrom Director of Engineering Environmental Building Strategies Wed, Aug 11, 2010 |
|
RE: Energy Star and Energy & Water Data Release Form in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
67 | 96 |
Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable Building & Architecture Thu, Aug 12, 2010 |
|
RE: Commissioning LEED Submittal in NC v2.2 EAc3: Enhanced Commissioning |
67 | 43 |
David Hubka GROUP Leader E3 GROUP Wed, Feb 23, 2011 |
|
RE: DES Commissioning (upstream) in NC v2.2 EAc3: Enhanced Commissioning |
67 | 43 |
Adam Targowski Owner ATsec Mon, Jul 25, 2011 |
|
RE: Cost of ASHRAE Level I Energy Audit in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
66 | 74 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Wed, Aug 18, 2010 |
|
Reference ET rates in NC 2009 WEc1: Water Efficient Landscaping |
66 | 236 |
mark peternell Fri, Mar 11, 2011 |
|
RE: Unirrigated areas in Option 1 in NC 2009 WEc1: Water Efficient Landscaping |
66 | 236 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Apr 8, 2011 |
|
RE: Lighting power of roof garden. in NC 2009 SSc8: Light Pollution Reduction |
66 | 397 |
Bill Swanson PE, LEED AP Integrated Architecture Mon, Apr 2, 2012 |
|
50 % Pervious Pavement or Each Paver need to be 50% Pervious? in CI 2009 SSc1: Site Selection |
66 | 159 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Mon, Sep 13, 2010 |
|
Default value for open grid paver. in CI 2009 SSc1: Site Selection |
66 | 159 |
Chi-Chung Sue Steven Leach International Asia Inc. Taiwan Branch Mon, Sep 13, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
LEED GREEN ASSOCIATE FREE QUIZ in LEED Green Associate Test Prep Resources |
1 |
Lorne Mlotek LEED AP BD+C LeadingGREEN Wed, Jul 4, 2012 |
|
U-value unheated/heated slab-on-grade floor in NC 2009 EAc1: Optimize Energy Performance |
821 |
Francesco Passerini Wed, Jul 4, 2012 |
|
LEED for Existing Homes in LEED for EB- O&M for Homes |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 2, 2012 |
|
Interpretations Database in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs |
27 |
Marcus Sheffer LEED Fellow 7group Wed, Jun 27, 2012 |
|
ID Credit for New Construction Projects in EBOM 2009 WEc1: Water Performance Measurement |
66 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Wed, Jun 27, 2012 |
|
Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads in LEED for Homes (LEED-H) Forum |
97 |
Kathy Kahill PDT Architects Wed, Jun 27, 2012 |
|
Tenant storage vs Host Building storage. in CI 2009 MRp1: Storage and Collection of Recyclables |
48 |
Luis Leal Luis Leal CTE Tue, Jun 26, 2012 |
|
Partial tenant occupancy with no core water fixtures in CS 2009 WEp1: Water Use Reduction—20% Reduction |
159 |
Laurent Kanago Partner Ecohill Solutions Mon, Jun 25, 2012 |
|
City review of LEED project = LEED experience? in Do you have questions for GBCI? |
44 |
Valerie J. Amor Visionary - CEO/President/Founder Drawing Conclusions LLC Sun, Jun 24, 2012 |
|
LEED speciality will need to match to project type? in Do you have questions for GBCI? |
44 |
Valerie J. Amor Visionary - CEO/President/Founder Drawing Conclusions LLC Sun, Jun 24, 2012 |
|
EAc1 model and EAc6 calcs in Performing LEED Green Power Calculations |
10 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Jun 22, 2012 |
|
Laundry drain water in Pilot Credit 10: Sustainable Wastewater Management |
33 |
Wei Jiang Fri, Jun 22, 2012 |
|
Multiple Buildings in PI Form 2 Project Summary Details |
65 |
Dhanujie Jayapala Sustainability Executive MAS Active Trading Pvt Ltd Wed, Jun 20, 2012 |
|
Mechanically Ventilated Areas in CS-2009 IEQp1: Minimum IAQ Performance |
90 |
Angela Saggin Tue, Jun 19, 2012 |
|
ID Credit - Building as a Teaching Tool in NC 2009 IDc1: Innovation in Design |
367 |
Kellin Vellenoweth Fri, Jun 15, 2012 |
|
Item 6 in Top Six Things LEED Consultants Do Wrong in Specs |
5 |
Tom Fisher Wed, Jun 13, 2012 |
|
estimating system Ds in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance |
213 |
AAME User Wed, Jun 13, 2012 |
|
LEED Specifications in Top Six Things LEED Consultants Do Wrong in Specs |
5 |
Michael Heacock Architect, LEED AP Michael Heacock Architect, Inc. Wed, Jun 13, 2012 |
|
Dan, in LEED Submittal Forms, Beta to v3 |
1 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Jun 12, 2012 |
|
Defining "One Building" in PI Form 2 Project Summary Details |
65 |
Chris DeVolder 360 Architecture Mon, Jun 11, 2012 |
Copyright 2013 – BuildingGreen, Inc.