LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
Submittal templates in metric Units in PIf1: Minimum Program Requirements |
66 |
BABAR MEHMOOD SAUD CONSULT Sat, May 25, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
109 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, May 24, 2013 |
|
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values in NC 2009 EAp2: Minimum Energy Performance |
1,381 |
TOMAS URIBE PROJECT MANAGER SOLUCIONES ENERGETICAS SOSTENIBLES Fri, May 24, 2013 |
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
RE: Gravel in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
167 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
RE: EA Credit 1 - Using available waste oil for heating in NC 2009 EAc1: Optimize Energy Performance |
821 |
Marcus Sheffer LEED Fellow 7group Fri, May 24, 2013 |
|
RE: Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
124 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Submittal templates in metric Units in PIf1: Minimum Program Requirements |
66 |
BABAR MEHMOOD SAUD CONSULT Sat, May 25, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
109 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, May 24, 2013 |
|
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values in NC 2009 EAp2: Minimum Energy Performance |
1,381 |
TOMAS URIBE PROJECT MANAGER SOLUCIONES ENERGETICAS SOSTENIBLES Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
RE: Gravel in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
167 |
Crissy Tsai Sustainability Coordinator Webcor Builders Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
RE: EA Credit 1 - Using available waste oil for heating in NC 2009 EAc1: Optimize Energy Performance |
821 |
Marcus Sheffer LEED Fellow 7group Fri, May 24, 2013 |
|
RE: Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
124 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
RE: Property Boundry. in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control |
2 |
Candace Small Thu, May 23, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
34 |
Candace Small Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
RE: Resubmit After Dening in Review Appeal |
24 |
Jim Park Project Manager EAN Technology Thu, May 23, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Prescriptive Method: Skylights in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Sat, Jul 9, 2011 |
|
Daylighting Calculations Out Of Range in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Eesmyal Santos-Brault Principal Recollective Consulting Thu, Jul 14, 2011 |
|
"Borrowed Light" For Interior Rooms in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Vishnu Jhaveri Project Engineer Lease Crutcher Lewis Fri, Aug 12, 2011 |
|
RE: Over the Light Allowance in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, Sep 2, 2011 |
|
RE: Unlabeled fenestration visible light transmission(VLT) in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Todd Reed Daylight Designer 7group Mon, Sep 12, 2011 |
|
RE: Over the Light Allowance in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Todd Reed Daylight Designer 7group Mon, Sep 12, 2011 |
|
Daylighting - Prescriptive Calc in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Francisco Villela Project Manager Marcatects Wed, Oct 12, 2011 |
|
Kitchens in Residential projects - regularly occupied? in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Green Builder Employee Consulting Firm Tue, Oct 25, 2011 |
|
RE: Daylight calculations with Design Builder v3 in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Thu, Nov 17, 2011 |
|
Option 3 - Variable conditions in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Maura Adams Environmental Stewardship Manager Thu, Dec 22, 2011 |
|
RE: Option 3 - Variable conditions in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Todd Reed Daylight Designer 7group Thu, Dec 22, 2011 |
|
Automatic vs Manual shades in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Michael Decoster Mon, Jul 2, 2012 |
|
RE: IEQc8.1 - Daylighting in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Todd Reed Daylight Designer 7group Thu, Aug 2, 2012 |
|
RE: IEQc8.1 - Daylighting in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Jill Dalglish President & Senior Engineer Dalglish Daylighting Thu, Aug 2, 2012 |
|
RE: IEQc8.1 - Daylighting in NC 2009 IEQc8.1: Daylight and Views—Daylight |
14 | 508 |
Elizabeth Powers Principal O'Brien & Company Wed, Aug 8, 2012 |
|
RE: Future Fit-out Views in NC 2009 IEQc8.2: Daylight and Views—Views |
14 | 248 |
David Posada Sustainability Manager GBD Architects Wed, Jun 2, 2010 |
|
RE: Documentation Tootkit available? in NC 2009 IEQc8.2: Daylight and Views—Views |
14 | 248 |
Nena Elise Tue, Jan 25, 2011 |
|
RE: Warehouse - non regularly occupied in NC 2009 IEQc8.2: Daylight and Views—Views |
14 | 248 |
Hernando Miranda Owner Soltierra LLC Tue, Aug 7, 2012 |
|
RE: Dormitory that is No Smoking in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
14 | 189 |
Udana Ratnayake Fri, Mar 11, 2011 |
|
RE: Emergency Egress Doors and Utility Space Doors in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
14 | 189 |
Loïc ANGOT ALTO Ingéniérie Thu, May 24, 2012 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Submittal templates in metric Units in PIf1: Minimum Program Requirements |
66 |
BABAR MEHMOOD SAUD CONSULT Sat, May 25, 2013 |
|
Airflow Monitoring Devices Specifications in NC 2009 IEQc1: Outdoor Air Delivery Monitoring |
135 |
Ahmed Younis Instrumentation and Control Engineer Dar Al Handasah Sat, May 25, 2013 |
|
When to submit for construction Review in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
334 |
Jon Quigley Fri, May 24, 2013 |
|
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances in NC v2.2 EAp2: Minimum Energy Performance |
175 |
Craig Sieben President Sieben Energy Associates Fri, May 24, 2013 |
|
LEED Project Boundary for a Train Station in MPR3: Must use a reasonable site boundary |
97 |
Michael Guadagnoli Fri, May 24, 2013 |
|
infill site in ND-v2009: Restoration of habitat or wetlands and water bodies |
1 |
Cardy V Fri, May 24, 2013 |
|
ASHRAE 62.1 - 2007 Occupant Density vs T24 in NC-2009 IEQp1: Minimum IAQ Performance |
467 |
Jauni Novak Fri, May 24, 2013 |
|
EAp 1 Performance Period in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
74 |
Lucy Williams Principal Lucy C. Williams, Architect Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
SSc4 Alternate Commuting Transportation - survey question in Doing the Alternative Commuting Transportation Survey |
9 |
Heather Reiners MetroPool Inc. Thu, May 23, 2013 |
|
Change in Owner signature in Required Signatories in LEED Online Forms |
44 |
Green Domus Green Domus Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
Copyright 2013 – BuildingGreen, Inc.