Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    356 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, May 18, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    RE: Percantage Make-Up
    in Healthcare-v2009: Sustainably sourced materials and products
    5 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 18, 2013
    RE: Casework
    in NC 2009 MRc7: Certified Wood
    238 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 17, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    255 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Fri, May 17, 2013
    RE: Good to know
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Paula Melton
    Managing Editor
    BuildingGreen, Inc.
    Fri, May 17, 2013
    RE: Building Envelope Commissioning LEED required test methodology
    in NC 2009 EAc3: Enhanced Commissioning
    169 Brett Farbstein
    Commissioning Engineer
    AKF Group
    Fri, May 17, 2013
    RE: Form Questions
    in Healthcare-v2009: Acoustic environment
    7 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Entry mat in vestibule w/ tile surround
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: Meaning of "Ready to Use Products"
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Alicia Silva
    CEO
    Revitaliza consultores
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    RE: LEV discounted parking
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    209 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    Title Comments Most Recent Post
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    356 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, May 18, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    RE: Percantage Make-Up
    in Healthcare-v2009: Sustainably sourced materials and products
    5 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 18, 2013
    RE: Casework
    in NC 2009 MRc7: Certified Wood
    238 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 17, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    255 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Fri, May 17, 2013
    RE: Building Envelope Commissioning LEED required test methodology
    in NC 2009 EAc3: Enhanced Commissioning
    169 Brett Farbstein
    Commissioning Engineer
    AKF Group
    Fri, May 17, 2013
    RE: Form Questions
    in Healthcare-v2009: Acoustic environment
    7 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Entry mat in vestibule w/ tile surround
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 17, 2013
    RE: Meaning of "Ready to Use Products"
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Alicia Silva
    CEO
    Revitaliza consultores
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    RE: LEV discounted parking
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    209 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Ventilated attic roofs - Baseline Vs Proposed
    in CS 2009 EAc1: Optimize Energy Performance
    207 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 17, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    111 Michael DeVuono
    T&M Associates
    Fri, May 17, 2013
    RE: Educational Program
    in CS 2009 IDc1: Innovation in Design
    42 Morteza Kasmaei
    Principal
    Climatic Design Inc.
    Fri, May 17, 2013
    Vertical addition to a hotel project
    in MPR2: Must be a complete, permanent building or space
    45 Adam Targowski
    Owner
    ATsec
    Fri, May 17, 2013
    RE: Determining FTE, PTE
    in PIf3: Occupant and Usage Data
    94 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Fri, May 17, 2013
    green roof cover - ivy
    in CS 2009 SSc7.2: Heat Island Effect—Roof
    83 Mario Pinoli
    Fri, May 17, 2013
    Room by Room flush-out Calculations
    in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
    124 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Thu, May 16, 2013
    Title Comments Most Recent Post
    RE: EBOM Templates
    in EBOM-2009 Sample Template
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Mar 8, 2010
    Norwegian Standard
    in Use of Standard ASHRAE vs NS - Norwegian Standard
    1 Christopher Schaffner
    Principal & Founder
    The Green Engineer, LLP
    Fri, Mar 5, 2010
    The Best UNLOCKED LEED 2009 credit checklists - by Tristan Roberts
    Wed, Mar 24, 2010
    RE: No hard rules
    in Transient and Peak
    2 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Wed, Mar 3, 2010
    CSI section?
    in Playground equipment
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Mar 2, 2010
    RE: Divisions 31 and 32 should be included
    in CSI specification sections 3–10 only?
    6 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Mar 1, 2010
    Low emtting materials - measurement - by André Knutsson
    Thu, Feb 18, 2010
    RE: The term "Registered" in the US
    in Registered Civil Engineer
    4 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Wed, Feb 17, 2010
    Multiple Buildings in LEED-EB: O&M
    in Multiple Buildings in LEED-EB: O&M
    3 Chris Nixon
    Manager, Sustainable Solutions
    BRSC
    Tue, Feb 16, 2010
    You Choose the LEED Project Boundary
    in One site, Multiple Buildings
    2 Sherry Bonelli
    LEED Project Manager/Consultant
    BudSprout LLC -- SucceedAtLEED.com
    Mon, Feb 15, 2010
    treat terraces like roof
    in How are roof terraces defined under LEED SSc7.2 for SRI calculations?
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Mar 24, 2010
    Great subject. I would add to
    in Smoking in LEED Buildings
    2 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Sun, Feb 14, 2010
    Speaker suggestions for "Growing the Green Casino" - by brett basara
    Sun, Feb 14, 2010
    RE: can you say more?
    in Supplier Participation In Open House (LEED For Homes)
    2 Byron Woodworth
    Sun, Feb 14, 2010
    similar to zero-lot-line situation
    in Question: Construction Activity Pollution Plan - SS Pr.1
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Feb 14, 2010
    Commercial Interiors
    in SSc1- Option 2, Path 5
    2 Sarah Brede
    Sun, Feb 14, 2010
    New technology not eligible for ID point
    in BIM(Building Information Modeling)can be used for pursue ID credit?
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Feb 14, 2010
    VOC Budget Method saved the day!
    in Top-10 LEED Snafus.... And Tips to Avoid Them
    2 Andrea Anderson
    Architectural Designer
    Sun, Feb 14, 2010
    RE: How are fees determined?
    in LEED registration and certification fees
    4 Ben Stanley
    Sustainability Manager
    YRG sustainability
    Fri, Jan 29, 2010
    RE: Thank you very much. Your
    in Required Signatory
    3 Shannon Gray
    Consultant
    YRG sustainability
    Sun, Feb 14, 2010
    Title Votes Comments Most Recent Post
    RE: Nice addition to the site
    in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits
    60 12 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, Feb 5, 2011
    LEED in Vietnam
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    59 209 Fabio Frescia
    Sustainable Engineer
    Wed, Oct 28, 2009
    RE: MPR, GFA and energy modelling
    in CS 2009 EAc1: Optimize Energy Performance
    59 207 Marcus Sheffer
    LEED Fellow
    7group
    Wed, Oct 19, 2011
    Landscape Water Budget Spreadsheet
    in NC 2009 WEc1: Water Efficient Landscaping
    59 234 Erica Downs
    Sustainability & LEED Consultant
    Tue, Jan 11, 2011
    leakage rate
    in EBOM 2009 EAp3: Fundamental Refrigerant Management
    59 55 Pablo Fortunato Suarez
    Principal ESD Consultant/Architect
    GreenArc Sustainable Building & Architecture
    Sun, Aug 15, 2010
    RE: Pricing - Toolkit
    in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
    59 67 Mark LaCroix
    EVP
    The CarbonNeutral Company
    Fri, Sep 17, 2010
    Solid Surface Materials; Quartz, Corian, etc. claiming Regional
    in NC 2009 MRc5: Regional Materials
    59 143 BKSK Architect
    BKSK Architects
    Tue, Sep 14, 2010
    RE: CxA from owner
    in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems
    59 53 Steve Khouw
    Principal
    DNA GreenDesign
    Thu, Aug 19, 2010
    Addenda revisions --- building vs tenant space
    in CI 2009 WEc1: Water Use Reduction
    59 70 Lida Lewis
    Director of Sustainability
    OTJ Architects
    Fri, Aug 20, 2010
    CASE 2 vegetated roof inclusion subject to earning SSc2?
    in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
    59 138 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Wed, Aug 11, 2010
    EAc2.1 and EAc2.2 performance periods and compliance
    in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation
    59 32 Lynette Liboy
    Tue, Sep 28, 2010
    RE: Educational Installation & Program
    in CI 2009 IDc1: Innovation in Design
    59 114 TINGXI WANG
    Wed, Aug 4, 2010
    RE: Confusion with ASHRAE 55
    in CI 2009 IEQc7.1: Thermal Comfort—Design
    59 44 Victoria Lockhart
    Arup Associates
    Mon, Aug 9, 2010
    RE: ..outdoor temperature exceeds design
    in CI 2009 IEQc7.1: Thermal Comfort—Design
    59 44 Christopher Schaffner
    Principal & Founder
    The Green Engineer, LLP
    Fri, Aug 20, 2010
    RE: CO2 sensors in non-densely occupied spaces
    in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
    59 44 Jose Salinas
    Mr
    Poch & Associates
    Fri, Aug 27, 2010
    RE: Do these requirements apply to tenanted areas too ?
    in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
    59 44 Allison Zuchman
    Green Building Consultant
    Fore Solutions
    Tue, Sep 21, 2010
    Using the DOE CBECS Table
    in NC v2.2 EAc2: On-Site Renewable Energy
    59 31 Allen Brown
    Assistant Project Manager
    Monarc Construction Inc.
    Tue, Sep 7, 2010
    RE: What should USGBC do with the extra time to ensure success?
    in LEED 2012 Postponed to 2013, Renamed LEED v4
    59 28 Lorne Mlotek
    LEED AP BD+C
    LeadingGREEN
    Tue, Jun 5, 2012
    RE: Controllability of Systems
    in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
    59 22 John Bauer
    Tue, Aug 17, 2010
    RE: MR Materials Credits (recycled/reuse/regional/biobased)
    in Comment on the New LEED Rating System Draft to be Released in 2012
    59 97 Brett Beckemeyer
    LEED-AP, BD&C
    Fox Architects
    Wed, Jan 12, 2011
    Title Comments Most Recent Post
    EAP2 Form "Check Compliance" problem
    in Completing the LEED Online EAp2 Form – Option 1: Whole Building Energy Simulation
    30 Abtar Singh
    President
    Singh360 Inc.
    Wed, Feb 15, 2012
    Plug Load Reduction Using ASHRAE - 2010
    in NC 2009 EAp2: Minimum Energy Performance
    1,354 Thomas Hellmann
    Director of Architecture
    Hixson
    Wed, Feb 15, 2012
    GFA Defination
    in LEED Minimum Program Requirements
    428 Ameet AA
    Wed, Feb 15, 2012
    EA Optimized Energy Performance
    in LEED 2012 – 2nd Public Comment – Energy & Atmosphere (EA) Section
    33 Lauren Ferrand
    IIDA, LEED AP BD+C
    FERRAND | ACS
    Tue, Feb 14, 2012
    Least Toxic Pesticide - Essentria IC3 ?
    in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
    51 Kimberlee Dobbins
    Tue, Feb 14, 2012
    data center process energy
    in NC v2.2 EAc1: Optimize Energy Performance
    257 Rick Blackshere
    Architect
    Pacific Design Group
    Tue, Feb 14, 2012
    Commercial Building with Tenant spaces fully submetered
    in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
    24 Ephraim Stanfield
    Engineer
    Energy Spectrum
    Tue, Feb 14, 2012
    Paint and coating - underground car park and technical platroom
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Julien Daclin
    Head of Sustainability
    Deerns France
    Tue, Feb 14, 2012
    Common purchase orders
    in NC 2009 MRc4: Recycled Content
    255 Alicia Freire
    Senior Engineer
    hurleypalmerflatt
    Tue, Feb 14, 2012
    Recertify- post 5 years?
    in Recertification
    44 Chris Munn
    Director, National Operations
    Chelsea Group, Ltd.
    Tue, Feb 14, 2012
    Recycling Areas Designation
    in NC 2009 MRp1: Storage and Collection of Recyclables
    45 Sunayana Jain
    Energy Engineering Specialist
    FTC&H
    Tue, Feb 14, 2012
    Mandatory envelope thermal properties
    in CS 2009 EAp2: Minimum Energy Performance
    516 Mary Ann Santos
    Tue, Feb 14, 2012
    Outdoor Preferential Parking for Handicapped
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    161 Omar Katanani
    Tue, Feb 14, 2012
    Roof Area Calculations
    in NC v2.2 SSc7.2: Heat Island Effect—Roof
    67 Sunayana Jain
    Energy Engineering Specialist
    FTC&H
    Mon, Feb 13, 2012
    Office Space With 25% Data Center Changing to 100% Office-June
    in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
    392 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Mon, Feb 13, 2012
    Energy Star Scores - Easily Modified
    in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
    392 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Mon, Feb 13, 2012
    high-rise residential building
    in LEED Rating System Selection Q&A
    331 Adam Targowski
    Owner
    ATsec
    Mon, Feb 13, 2012
    LPD for space with higher headroom
    in NC 2009 EAc1: Optimize Energy Performance
    812 William Wong
    Sun, Feb 12, 2012
    external lighting LPD contribution to percentage energy savings
    in CS 2009 EAc1: Optimize Energy Performance
    207 Puteri Shireen Jahnkassim
    consultant
    EAG Consulting Sdn Bhd
    Sat, Feb 11, 2012
    ARI Certification for VRF equipment in LEED-NC 2009
    in NC 2009 EAp2: Minimum Energy Performance
    1,354 Mauricio Ramirez
    Fri, Feb 10, 2012

    Copyright 2013 – BuildingGreen, Inc.