LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Commingled Review Comment in NC 2009 MRc2: Construction Waste Management |
251 |
Michelle Rosenberger Partner ArchEcology, LLC Mon, May 20, 2013 |
|
RE: Beehives on rooftops – ID credit? in CI 2009 IDc1: Innovation in Design |
116 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 20, 2013 |
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Mon, May 20, 2013 |
|
Major renovation zero-lot line project has oil spillage... in NC 2009 SSc3: Brownfield Redevelopment |
63 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
112 |
Veronika Sundberg Environmental Engineer - Certification Skanska Sverige AB Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
RE: Acoustics study in NC 2009 IDc1: Innovation in Design |
356 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, May 18, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
RE: Casework in NC 2009 MRc7: Certified Wood |
238 |
Jason Grant Principal Jason Grant Consulting Fri, May 17, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
255 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, May 17, 2013 |
|
RE: Good to know in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
13 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Commingled Review Comment in NC 2009 MRc2: Construction Waste Management |
251 |
Michelle Rosenberger Partner ArchEcology, LLC Mon, May 20, 2013 |
|
RE: Beehives on rooftops – ID credit? in CI 2009 IDc1: Innovation in Design |
116 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 20, 2013 |
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Mon, May 20, 2013 |
|
Major renovation zero-lot line project has oil spillage... in NC 2009 SSc3: Brownfield Redevelopment |
63 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
112 |
Veronika Sundberg Environmental Engineer - Certification Skanska Sverige AB Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
RE: Acoustics study in NC 2009 IDc1: Innovation in Design |
356 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, May 18, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
RE: Casework in NC 2009 MRc7: Certified Wood |
238 |
Jason Grant Principal Jason Grant Consulting Fri, May 17, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
255 |
Lyle Axelarris Civil Engineer, LEED AP BD+C, O+M Design Alaska Fri, May 17, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: LEV discounted parking in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
209 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: EBOM Templates in EBOM-2009 Sample Template |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 8, 2010 |
|
Norwegian Standard in Use of Standard ASHRAE vs NS - Norwegian Standard |
1 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Fri, Mar 5, 2010 |
| The Best UNLOCKED LEED 2009 credit checklists | - |
by Tristan Roberts Wed, Mar 24, 2010 |
|
RE: No hard rules in Transient and Peak |
2 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Wed, Mar 3, 2010 |
|
CSI section? in Playground equipment |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Mar 2, 2010 |
|
RE: Divisions 31 and 32 should be included in CSI specification sections 3–10 only? |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 1, 2010 |
| Low emtting materials - measurement | - |
by André Knutsson Thu, Feb 18, 2010 |
|
RE: The term "Registered" in the US in Registered Civil Engineer |
4 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Wed, Feb 17, 2010 |
|
Multiple Buildings in LEED-EB: O&M in Multiple Buildings in LEED-EB: O&M |
3 |
Chris Nixon Manager, Sustainable Solutions BRSC Tue, Feb 16, 2010 |
|
You Choose the LEED Project Boundary in One site, Multiple Buildings |
2 |
Sherry Bonelli LEED Project Manager/Consultant BudSprout LLC -- SucceedAtLEED.com Mon, Feb 15, 2010 |
|
treat terraces like roof in How are roof terraces defined under LEED SSc7.2 for SRI calculations? |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Mar 24, 2010 |
|
Great subject. I would add to in Smoking in LEED Buildings |
2 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Sun, Feb 14, 2010 |
| Speaker suggestions for "Growing the Green Casino" | - |
by brett basara Sun, Feb 14, 2010 |
|
RE: can you say more? in Supplier Participation In Open House (LEED For Homes) |
2 |
Byron Woodworth Sun, Feb 14, 2010 |
|
similar to zero-lot-line situation in Question: Construction Activity Pollution Plan - SS Pr.1 |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Feb 14, 2010 |
|
Commercial Interiors in SSc1- Option 2, Path 5 |
2 |
Sarah Brede Sun, Feb 14, 2010 |
|
New technology not eligible for ID point in BIM(Building Information Modeling)can be used for pursue ID credit? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Feb 14, 2010 |
|
VOC Budget Method saved the day! in Top-10 LEED Snafus.... And Tips to Avoid Them |
2 |
Andrea Anderson Architectural Designer Sun, Feb 14, 2010 |
|
RE: How are fees determined? in LEED registration and certification fees |
4 |
Ben Stanley Sustainability Manager YRG sustainability Fri, Jan 29, 2010 |
|
RE: Thank you very much. Your in Required Signatory |
3 |
Shannon Gray Consultant YRG sustainability Sun, Feb 14, 2010 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
IEQ Testing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
60 | 285 |
Aliesa Adelman Thu, Dec 10, 2009 |
|
RE: MR Materials Credits (recycled/reuse/regional/biobased) in Comment on the New LEED Rating System Draft to be Released in 2012 |
59 | 97 |
Brett Beckemeyer LEED-AP, BD&C Fox Architects Wed, Jan 12, 2011 |
|
Meeting WaterSense Specification for Fixtures in WE Credits in Comment on the New LEED Rating System Draft to be Released in 2012 |
59 | 97 |
Jeremy Cressman VP GM Commercial Business Unit American Standard Brands Wed, Apr 6, 2011 |
|
Current registered project shifts to New Rating Systems in Comment on the New LEED Rating System Draft to be Released in 2012 |
59 | 97 |
William Wong Mon, May 9, 2011 |
|
RE: Controllability of Systems in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
59 | 22 |
John Bauer Tue, Aug 17, 2010 |
|
RE: What should USGBC do with the extra time to ensure success? in LEED 2012 Postponed to 2013, Renamed LEED v4 |
59 | 28 |
Lorne Mlotek LEED AP BD+C LeadingGREEN Tue, Jun 5, 2012 |
|
Using the DOE CBECS Table in NC v2.2 EAc2: On-Site Renewable Energy |
59 | 31 |
Allen Brown Assistant Project Manager Monarc Construction Inc. Tue, Sep 7, 2010 |
|
RE: CO2 sensors in non-densely occupied spaces in CS 2009 IEQc1: Outdoor Air Delivery Monitoring |
59 | 44 |
Jose Salinas Mr Poch & Associates Fri, Aug 27, 2010 |
|
RE: Do these requirements apply to tenanted areas too ? in CS 2009 IEQc1: Outdoor Air Delivery Monitoring |
59 | 44 |
Allison Zuchman Green Building Consultant Fore Solutions Tue, Sep 21, 2010 |
|
RE: Confusion with ASHRAE 55 in CI 2009 IEQc7.1: Thermal Comfort—Design |
59 | 44 |
Victoria Lockhart Arup Associates Mon, Aug 9, 2010 |
|
RE: ..outdoor temperature exceeds design in CI 2009 IEQc7.1: Thermal Comfort—Design |
59 | 44 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Fri, Aug 20, 2010 |
|
EAc2.1 and EAc2.2 performance periods and compliance in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation |
59 | 32 |
Lynette Liboy Tue, Sep 28, 2010 |
|
CASE 2 vegetated roof inclusion subject to earning SSc2? in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
59 | 138 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Wed, Aug 11, 2010 |
|
Addenda revisions --- building vs tenant space in CI 2009 WEc1: Water Use Reduction |
59 | 70 |
Lida Lewis Director of Sustainability OTJ Architects Fri, Aug 20, 2010 |
|
RE: CxA from owner in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
59 | 53 |
Steve Khouw Principal DNA GreenDesign Thu, Aug 19, 2010 |
|
Solid Surface Materials; Quartz, Corian, etc. claiming Regional in NC 2009 MRc5: Regional Materials |
59 | 143 |
BKSK Architect BKSK Architects Tue, Sep 14, 2010 |
|
RE: Pricing - Toolkit in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
59 | 67 |
Mark LaCroix EVP The CarbonNeutral Company Fri, Sep 17, 2010 |
|
leakage rate in EBOM 2009 EAp3: Fundamental Refrigerant Management |
59 | 55 |
Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable Building & Architecture Sun, Aug 15, 2010 |
|
Landscape Water Budget Spreadsheet in NC 2009 WEc1: Water Efficient Landscaping |
59 | 234 |
Erica Downs Sustainability & LEED Consultant Tue, Jan 11, 2011 |
|
RE: MPR, GFA and energy modelling in CS 2009 EAc1: Optimize Energy Performance |
59 | 207 |
Marcus Sheffer LEED Fellow 7group Wed, Oct 19, 2011 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Supermarket Refrigeration - A Process Load? in Completing the LEED Online EAp2 Form – Option 1: Whole Building Energy Simulation |
30 |
Abtar Singh President Singh360 Inc. Wed, Feb 15, 2012 |
|
composite wood flooring in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products |
119 |
Christi Mosher ZGF Architects Wed, Feb 15, 2012 |
|
Views through sliding doors in residential bedrooms in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces |
42 |
Nancy Henderson Managing Partner ArchEcology Wed, Feb 15, 2012 |
|
Prereq denied based on review team misunderstanding in Review Appeal |
22 |
Liz Valdez Energy Project Consultant Liz Valdez Consulting Wed, Feb 15, 2012 |
|
Project Scope with no new fixtures in CI 2009 WEp1: Water Use Reduction—20% Reduction |
173 |
Steven Jones Vice President Quinn Evans Architects Wed, Feb 15, 2012 |
|
EAP2 Form "Check Compliance" problem in Completing the LEED Online EAp2 Form – Option 1: Whole Building Energy Simulation |
30 |
Abtar Singh President Singh360 Inc. Wed, Feb 15, 2012 |
|
Plug Load Reduction Using ASHRAE - 2010 in NC 2009 EAp2: Minimum Energy Performance |
1,354 |
Thomas Hellmann Director of Architecture Hixson Wed, Feb 15, 2012 |
|
GFA Defination in LEED Minimum Program Requirements |
428 |
Ameet AA Wed, Feb 15, 2012 |
|
EA Optimized Energy Performance in LEED 2012 – 2nd Public Comment – Energy & Atmosphere (EA) Section |
33 |
Lauren Ferrand IIDA, LEED AP BD+C FERRAND | ACS Tue, Feb 14, 2012 |
|
Least Toxic Pesticide - Essentria IC3 ? in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan |
51 |
Kimberlee Dobbins Tue, Feb 14, 2012 |
|
data center process energy in NC v2.2 EAc1: Optimize Energy Performance |
257 |
Rick Blackshere Architect Pacific Design Group Tue, Feb 14, 2012 |
|
Commercial Building with Tenant spaces fully submetered in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering |
24 |
Ephraim Stanfield Engineer Energy Spectrum Tue, Feb 14, 2012 |
|
Paint and coating - underground car park and technical platroom in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Julien Daclin Head of Sustainability Deerns France Tue, Feb 14, 2012 |
|
Common purchase orders in NC 2009 MRc4: Recycled Content |
255 |
Alicia Freire Senior Engineer hurleypalmerflatt Tue, Feb 14, 2012 |
|
Recertify- post 5 years? in Recertification |
44 |
Chris Munn Director, National Operations Chelsea Group, Ltd. Tue, Feb 14, 2012 |
|
Recycling Areas Designation in NC 2009 MRp1: Storage and Collection of Recyclables |
45 |
Sunayana Jain Energy Engineering Specialist FTC&H Tue, Feb 14, 2012 |
|
Mandatory envelope thermal properties in CS 2009 EAp2: Minimum Energy Performance |
516 |
Mary Ann Santos Tue, Feb 14, 2012 |
|
Outdoor Preferential Parking for Handicapped in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
161 |
Omar Katanani Tue, Feb 14, 2012 |
|
Roof Area Calculations in NC v2.2 SSc7.2: Heat Island Effect—Roof |
67 |
Sunayana Jain Energy Engineering Specialist FTC&H Mon, Feb 13, 2012 |
|
Office Space With 25% Data Center Changing to 100% Office-June in EBOM 2009 EAp2: Minimum Energy Efficiency Performance |
392 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Mon, Feb 13, 2012 |
Copyright 2013 – BuildingGreen, Inc.