LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
14 |
Paula Melton Managing Editor BuildingGreen, Inc. Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
44 |
Ramesh Narayanan Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
10 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
103 |
FABIO VIERO Head of Sustainability Manens-TiFS s.p.a. Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,360 |
Anil Bhari Min engineering inc Tue, May 21, 2013 |
|
RE: Building Footprint in PIf2: Project Summary Details |
83 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Tue, May 21, 2013 |
|
RE: Determining Zone 1 or Zone 2 in Pilot Credit 55: Bird Collision Deterrence |
20 |
Jessica Wuest Tue, May 21, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
263 |
Joseph Ford RSP Architects Ltd. Tue, May 21, 2013 |
|
Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
31 |
Shivani Langer Architect SHW Group Tue, May 21, 2013 |
|
Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
170 |
Erica Downs Sustainability & LEED Consultant Tue, May 21, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
103 |
FABIO VIERO Head of Sustainability Manens-TiFS s.p.a. Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,360 |
Anil Bhari Min engineering inc Tue, May 21, 2013 |
|
RE: Building Footprint in PIf2: Project Summary Details |
83 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Tue, May 21, 2013 |
|
RE: Determining Zone 1 or Zone 2 in Pilot Credit 55: Bird Collision Deterrence |
20 |
Jessica Wuest Tue, May 21, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
263 |
Joseph Ford RSP Architects Ltd. Tue, May 21, 2013 |
|
Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
31 |
Shivani Langer Architect SHW Group Tue, May 21, 2013 |
|
Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
170 |
Erica Downs Sustainability & LEED Consultant Tue, May 21, 2013 |
|
RE: Examples of PI F1, F2 and F3 in PIf1: Development Program and Site Type |
13 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Tue, May 21, 2013 |
|
RE: Planters and window boxes in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
140 |
Karin Miller Sustainability Manager YR&G Tue, May 21, 2013 |
|
RE: Tenant spaces in CS 2009 EAp2: Minimum Energy Performance |
518 |
Marcus Sheffer LEED Fellow 7group Tue, May 21, 2013 |
|
RE: WDF - Power generation other than electricity? in NC 2009 MRc2: Construction Waste Management |
253 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, May 21, 2013 |
|
RE: Average Pressure Differential - New LEED Online Template in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
58 |
Dylan Connelly Mechanical Engineer Integral Group Tue, May 21, 2013 |
|
RE: SIGNALIZATION SIZE in CS 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
53 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Tue, May 21, 2013 |
|
RE: Baseline Building Rotation in NC 2009 EAc1: Optimize Energy Performance |
815 |
Marcus Sheffer LEED Fellow 7group Tue, May 21, 2013 |
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
116 |
Michael DeVuono T&M Associates Tue, May 21, 2013 |
|
RE: FSC certification for drywall subs in NC 2009 MRc7: Certified Wood |
239 |
Doreen Kruschina Doreen Kruschina Planung+Baumanagement Tue, May 21, 2013 |
|
RE: Requirements by government agency don't require total cleanup in NC 2009 SSc3: Brownfield Redevelopment |
68 |
Larry Sims Principal Studio4, LLC Tue, May 21, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
check MPRs in attaching to an existing building |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, May 13, 2010 |
|
RE: Using messages feature of LEED Online v3 in LEED Online - Messages |
2 |
David Posada Sustainability Manager GBD Architects Wed, May 12, 2010 |
|
Mobile vs. Relocatable in Is Project LEED Certifiable? |
2 |
David Posada Sustainability Manager GBD Architects Tue, May 11, 2010 |
| LEEDuser now supports LEED-NC v2.2 | - |
by Tristan Roberts Wed, Oct 26, 2011 |
|
RE: LEED Green Associate eligibility requirements in Eligibility Requirements for Green Associates |
4 |
David Posada Sustainability Manager GBD Architects Wed, May 5, 2010 |
|
assigning credits in LEED Online in Assigning credits in LEED Online v3 |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 3, 2010 |
|
LEED for HOMES Scope in Military Barracks considered LEED for Homes or LEED NC? |
2 |
Antonia Tsobanoudis Davis Energy Group Thu, Apr 29, 2010 |
| Key CIR for Registered non-certified LEED-CS v2.0 projects | - |
by Tristan Roberts Thu, Apr 29, 2010 |
| Getting to Know Green Globes | - |
by Joshua Radoff Wed, Apr 28, 2010 |
|
review LEED-NC SSc4.3 requirements in Canada LEED NC SSc4.3 |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Apr 24, 2010 |
| Low Cost Innovation in Operations Ideas | - |
by Eric Bosley Thu, Apr 22, 2010 |
|
RE: LEED-ND launch date is April 29, 2010 in LEED for Neighborhood Development Reference Guide Available For Sale |
6 |
Jennifer Perdue Wed, Apr 21, 2010 |
|
RE: Katie,
In case you haven't in Site Boundary |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Apr 21, 2010 |
|
Going from LEED-NC to LEED-EBOM in Taking a LEED NC 2.2 to LEED EBOM 3.0 |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Apr 19, 2010 |
|
when several buildings can be considered as one in Building criteria and certification fees |
8 |
Cara Mae Cirignano Specialist, LEED Resource Development US Green Building Council Fri, Apr 16, 2010 |
|
RE: Yes, it sounds like a project in Under which Rating System a "Horse Stable" can be certified?? |
2 |
Diaa El-Masry Sustainable Design Manager Qatar Green Leaders Thu, Apr 15, 2010 |
|
RE: Multiple Tabs in Regional Priority Credits for EBOM |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Apr 15, 2010 |
| HAP v4.5 versus eQUEST | - |
by Omar Katanani Thu, Apr 15, 2010 |
|
RE: Passed on to USGBC in Spam from Project Listing at USGBC.org? |
2 |
Forum User Sat, Apr 10, 2010 |
| USGBC and China GBC to Collaborate | - |
by Tristan Roberts Thu, Apr 8, 2010 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
Existing AHU serves more than the LEED tenant space- what to do? in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
61 | 58 |
Kathy Buck Senior Project Manager Neumann/Smith Architecture Thu, Aug 5, 2010 |
|
RE: VOC Methodologies in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
61 | 61 |
Carmelito Tatlonghari LEED-AP BD+C Leighton Contractors Philippines, Inc. Wed, Sep 8, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
61 | 61 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Mon, Aug 16, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
61 | 61 |
Steve Loppnow Sustainability Manager YR&G Mon, Aug 16, 2010 |
|
RE: Does hotel type building can achieve this credit? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
61 | 61 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Mon, Aug 16, 2010 |
|
RE: Building Area Method Compliance Path in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power |
61 | 64 |
Dane Sanders Principal Clanton Associates Fri, Aug 6, 2010 |
|
RE: All weather pathways? in Pilot Credit 9: Street Network |
61 | 67 |
Batya Metalitz Manager, LEED Technical Development USGBC Tue, Sep 28, 2010 |
|
RE: All weather pathways? in Pilot Credit 9: Street Network |
61 | 67 |
Batya Metalitz Manager, LEED Technical Development USGBC Wed, Sep 29, 2010 |
|
performance period in EBOM 2009 SSc2: Building Exterior and Hardscape Management Plan |
61 | 72 |
Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable Building & Architecture Tue, Sep 28, 2010 |
|
Including "Dry Gardens" in Design Case in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
61 | 72 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Tue, Aug 10, 2010 |
|
Minimum Energy Performance in Comment on the New LEED Rating System Draft to be Released in 2012 |
61 | 97 |
Jeremy Kuhre Sustainable Buildings & Operations Manager Sustainable Solutions Corporation Wed, Jan 12, 2011 |
|
IP Integrated Process in Comment on the New LEED Rating System Draft to be Released in 2012 |
61 | 97 |
Linda Smithe Fri, Jan 14, 2011 |
|
RE: Blinds in CI 2009 MRc4: Recycled Content |
61 | 122 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 10, 2010 |
|
Energy Model in CS 2009 EAc1: Optimize Energy Performance |
61 | 207 |
Oliver Preuss Hernandez Mon, Dec 19, 2011 |
|
RE: Controller Efficiency (CE) data in NC 2009 WEc1: Water Efficient Landscaping |
61 | 234 |
Amy Rider Sustainability Manager KEMA Services Fri, Nov 12, 2010 |
|
Concrete Curing Systems in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
61 | 287 |
Tim Rogers Designer The Clark Enersen Partners Tue, Aug 24, 2010 |
|
RE: Nice addition to the site in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
60 | 12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Feb 5, 2011 |
|
RE: Regional Priority in LEED-ND in NC 2009 RPc1: Regional Priority |
60 | 18 |
Lauren Brust Assistant Director Steven Winter Associates Tue, Aug 3, 2010 |
|
RE: Controllability of Systems in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
60 | 22 |
David Posada Sustainability Manager GBD Architects Thu, Aug 12, 2010 |
|
Pilot Credit 5 & 6 in Pilot Credit 6: Integrative Project Planning & Design |
60 | 25 |
Jill DeMarotta Interior Designer Gresham Smith and Partners Fri, Aug 6, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Construction Demolition Waste credit in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum |
107 |
Jennifer Frey Project Manager Sellen Sustainability Tue, Mar 20, 2012 |
|
EQ Credit: Acoustical Performance - Needs cleaning in LEED 2012 – 3rd Public Comment – IEQ (Indoor Environmental Quality) Section |
20 |
Joseph F. Bridger, LEED AP Tue, Mar 20, 2012 |
|
Thanks, Bill in NC v2.2 SSc8: Light Pollution Reduction |
92 |
Rob Watson CEO EcoTech International Mon, Mar 19, 2012 |
|
Move historic & blighted buildings to LT High Priority Site in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section |
16 |
Mara Baum Healthcare Sustainable Design Leader HOK Mon, Mar 19, 2012 |
|
Move historic & blighted buildings to LT High Priority Site in LEED 2012 – 3rd Public Comment – MR (Materials and Resources) Section |
43 |
Mara Baum Healthcare Sustainable Design Leader HOK Mon, Mar 19, 2012 |
|
CI Toilets for employees vs customers in CI 2009 WEp1: Water Use Reduction—20% Reduction |
173 |
Sustentator Argentina Sustentator Mon, Mar 19, 2012 |
|
EAc1 weather data in NC 2009 EAc1: Optimize Energy Performance |
815 |
Francesco Passerini Mon, Mar 19, 2012 |
|
Site Assessment Credit in LEED 2012 – 3rd Public Comment – SS (Sustainble Sites) Section |
9 |
Melissa Wrolstad Fri, Mar 16, 2012 |
|
Energy Star Appliances & Equipment as Innovation for LEED-NC in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances |
188 |
Kris Callori LEED Fellow, USGBC LEED Faculty, LEED AP BD+C, LEED AP ID+C, Architect, Principal, Biomimicry Specialist Environmental Dynamics, Incorporated Thu, Mar 15, 2012 |
|
Office shell space in CS-2009 IEQp1: Minimum IAQ Performance |
90 |
Orlin Velinov, PE Mechanical Engineer Termo Aire, LTDA Thu, Mar 15, 2012 |
|
Green cleaning products in Mexico? in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials |
84 |
Dario Ibarguengoitia Ambiente Regenerativo Integral Wed, Mar 14, 2012 |
|
Title 24 under LEED 2012 in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum |
107 |
James Del Monaco Sustainability Director, PE P2S Engineering, Inc. Wed, Mar 14, 2012 |
|
2012 & the Credentialing System in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum |
107 |
Diaa El-Masry Sustainable Design Manager Qatar Green Leaders Wed, Mar 14, 2012 |
|
No. The 1/2 mile radius in SS C2 density calculation for site area |
1 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, Mar 14, 2012 |
|
Only one room non-densely occupied in NC 2009 IEQc1: Outdoor Air Delivery Monitoring |
135 |
Christian Brücher LEED AP / LEED AP BD+C ARCADIS Deutschland GmbH Wed, Mar 14, 2012 |
|
Increase in Fundamental Scope... in LEED 2012 – 3rd Public Comment – EA (Energy & Atmosphere) Section |
16 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, Mar 14, 2012 |
|
Reduced Parking Footprint in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section |
16 |
Robert Korp Manager of Projects Barry Isett & Associates Mon, Mar 12, 2012 |
|
Question About UPS and Power Supply Efficiency in NC 2009 EAc1: Optimize Energy Performance |
815 |
Ricardo Marques Mon, Mar 12, 2012 |
|
What happened to water reuse? in LEED 2012 – 3rd Public Comment – WE (Water Efficiency) Section |
14 |
Melissa Wrolstad Fri, Mar 9, 2012 |
|
Some Concerns with Low-Emitting Interiors in LEED 2012 – 3rd Public Comment – IEQ (Indoor Environmental Quality) Section |
20 |
Josh Jacobs Technical Information & Public Affairs Manager UL Environment Thu, Mar 8, 2012 |
Copyright 2013 – BuildingGreen, Inc.