LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
RE: No HVAC / Natural Ventilation - Unmet Hrs in NC 2009 EAp2: Minimum Energy Performance |
1,378 |
Chad Coleman Project Manager Drew George & Partners Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
117 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
RE: Does casework count for MR4, MR5 and MR7? in Schools 2009 MRc7: Certified Wood |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Derek Sylvia Thu, May 23, 2013 |
|
RE: Potential crossover credit from New Construction to Schools? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
38 |
James Leonard via Buro Happold Thu, May 23, 2013 |
|
RE: MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
267 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, May 23, 2013 |
|
SSc4 Alternate Commuting Transportation - survey question in Doing the Alternative Commuting Transportation Survey |
9 |
Heather Reiners MetroPool Inc. Thu, May 23, 2013 |
|
RE: Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
4 |
Candace Small Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
RE: No HVAC / Natural Ventilation - Unmet Hrs in NC 2009 EAp2: Minimum Energy Performance |
1,378 |
Chad Coleman Project Manager Drew George & Partners Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
117 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
RE: Does casework count for MR4, MR5 and MR7? in Schools 2009 MRc7: Certified Wood |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Derek Sylvia Thu, May 23, 2013 |
|
RE: Potential crossover credit from New Construction to Schools? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
38 |
James Leonard via Buro Happold Thu, May 23, 2013 |
|
RE: MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
267 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, May 23, 2013 |
|
RE: Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
4 |
Candace Small Thu, May 23, 2013 |
|
RE: Core & Shell: Electricity Use in CS 2009 EAc6: Green Power |
42 |
Marcus Sheffer LEED Fellow 7group Thu, May 23, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
106 |
Todd Reed Daylight Designer 7group Thu, May 23, 2013 |
|
Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
148 |
Michelle Eisenhauer Thu, May 23, 2013 |
|
RE: CalGreen and LEED Requirements for SSc4.3 in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
213 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Thu, May 23, 2013 |
|
RE: WC's in CS 2009 WEp1: Water Use Reduction—20% Reduction |
159 |
OSCAR DE LA RED LEED AP BD+C PROMEC Thu, May 23, 2013 |
|
RE: VOCs emissions after given number of days in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
63 |
Josh Jacobs Technical Information & Public Affairs Manager UL Environment Thu, May 23, 2013 |
|
RE: HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
367 |
SW LEE LEED AP Thu, May 23, 2013 |
|
RE: Same firm as sub-contractor and CxA in NC 2009 EAc3: Enhanced Commissioning |
172 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
RE: Resubmit After Dening in Review Appeal |
24 |
Jim Park Project Manager EAN Technology Thu, May 23, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Glare Control Type Question in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
2 | 106 |
Jill Dalglish President & Senior Engineer Dalglish Daylighting Fri, Dec 14, 2012 |
|
RE: Outsourcing Chain of Custody Management in NC v2.2 MRc7: Certified Wood |
2 | 148 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Fri, Apr 27, 2012 |
|
RE: Wood component percentage in NC v2.2 MRc7: Certified Wood |
2 | 148 |
Jason Grant Principal Jason Grant Consulting Thu, Oct 25, 2012 |
|
RE: Barn Wood Clarification in NC v2.2 MRc7: Certified Wood |
2 | 148 |
Jason Grant Principal Jason Grant Consulting Thu, Oct 25, 2012 |
|
RE: Plastic Laminate & MRc7 in NC v2.2 MRc7: Certified Wood |
2 | 148 |
Jason Grant Principal Jason Grant Consulting Fri, Oct 26, 2012 |
|
RE: Plastic Laminate & MRc7 in NC v2.2 MRc7: Certified Wood |
2 | 148 |
John Casciato Fri, Oct 26, 2012 |
|
Car Share on Campus - reserved for building occupants only? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Erica Downs Sustainability & LEED Consultant Tue, Jan 15, 2013 |
|
RE: Car Share on Campus - reserved for building occupants only? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Mon, Jan 21, 2013 |
|
RE: Car Share on Campus - reserved for building occupants only? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Erica Downs Sustainability & LEED Consultant Fri, Jan 18, 2013 |
|
RE: Car Share on Campus - reserved for building occupants only? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Erica Downs Sustainability & LEED Consultant Mon, Jan 21, 2013 |
|
RE: Fueling Capacity of Charging Stations in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Harvard University Green Building Services Fri, Nov 2, 2012 |
|
Site with no parking lots - LEED ND Project in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Gaston Viau Thu, Dec 6, 2012 |
|
RE: Option 1: Shared Lot/Outside LEED Boundary in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Thu, Dec 13, 2012 |
|
RE: Option 1: Shared Lot/Outside LEED Boundary in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Thu, Dec 13, 2012 |
|
EV Charging Station Monitoring in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Studio 804 Studio 804 Fri, Dec 14, 2012 |
|
RE: EV Charging Station Monitoring in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Dec 14, 2012 |
|
SSc4.3 & SSc4.4: Rounding to the 5% requirement in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Vinsu Shah Intern Architect LLB Architects Fri, Jan 11, 2013 |
|
RE: SSc4.3 & SSc4.4: Rounding to the 5% requirement in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Vinsu Shah Intern Architect LLB Architects Fri, Jan 11, 2013 |
|
RE: SSc4.3 & SSc4.4: Rounding to the 5% requirement in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Fri, Jan 11, 2013 |
|
Can we have it both ways? in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
2 | 213 |
Susan Di Giulio Project Manager Zinner Consultants Fri, Feb 1, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
117 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
SSc4 Alternate Commuting Transportation - survey question in Doing the Alternative Commuting Transportation Survey |
9 |
Heather Reiners MetroPool Inc. Thu, May 23, 2013 |
|
Change in Owner signature in Required Signatories in LEED Online Forms |
44 |
Green Domus Green Domus Thu, May 23, 2013 |
|
Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
148 |
Michelle Eisenhauer Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
porous or non-porous material in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
Rainwater collection in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
163 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
Copyright 2013 – BuildingGreen, Inc.