LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: WE C1, Option 2, Path 2 submittal requirements in NC 2009 WEc1: Water Efficient Landscaping |
236 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, May 22, 2013 |
|
RE: LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
|
RE: No Smoking Signs in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
188 |
Omar Katanani Wed, May 22, 2013 |
|
HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
365 |
SW LEE LEED AP Wed, May 22, 2013 |
|
Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
14 |
Paula Melton Managing Editor BuildingGreen, Inc. Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
44 |
Ramesh Narayanan Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
103 |
FABIO VIERO Head of Sustainability Manens-TiFS s.p.a. Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,360 |
Anil Bhari Min engineering inc Tue, May 21, 2013 |
|
RE: Building Footprint in PIf2: Project Summary Details |
83 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Tue, May 21, 2013 |
|
RE: Determining Zone 1 or Zone 2 in Pilot Credit 55: Bird Collision Deterrence |
20 |
Jessica Wuest Tue, May 21, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
263 |
Joseph Ford RSP Architects Ltd. Tue, May 21, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: WE C1, Option 2, Path 2 submittal requirements in NC 2009 WEc1: Water Efficient Landscaping |
236 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, May 22, 2013 |
|
RE: No Smoking Signs in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
188 |
Omar Katanani Wed, May 22, 2013 |
|
HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
365 |
SW LEE LEED AP Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
103 |
FABIO VIERO Head of Sustainability Manens-TiFS s.p.a. Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,360 |
Anil Bhari Min engineering inc Tue, May 21, 2013 |
|
RE: Building Footprint in PIf2: Project Summary Details |
83 |
Kimberly Frith Sustainability Consultant Alto Sustainability, LLC Tue, May 21, 2013 |
|
RE: Determining Zone 1 or Zone 2 in Pilot Credit 55: Bird Collision Deterrence |
20 |
Jessica Wuest Tue, May 21, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
263 |
Joseph Ford RSP Architects Ltd. Tue, May 21, 2013 |
|
Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
31 |
Shivani Langer Architect SHW Group Tue, May 21, 2013 |
|
Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
170 |
Erica Downs Sustainability & LEED Consultant Tue, May 21, 2013 |
|
RE: Examples of PI F1, F2 and F3 in PIf1: Development Program and Site Type |
13 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Tue, May 21, 2013 |
|
RE: Planters and window boxes in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat |
140 |
Karin Miller Sustainability Manager YR&G Tue, May 21, 2013 |
|
RE: Tenant spaces in CS 2009 EAp2: Minimum Energy Performance |
518 |
Marcus Sheffer LEED Fellow 7group Tue, May 21, 2013 |
|
RE: WDF - Power generation other than electricity? in NC 2009 MRc2: Construction Waste Management |
253 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, May 21, 2013 |
|
RE: Average Pressure Differential - New LEED Online Template in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
58 |
Dylan Connelly Mechanical Engineer Integral Group Tue, May 21, 2013 |
|
RE: SIGNALIZATION SIZE in CS 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
53 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Tue, May 21, 2013 |
|
RE: Baseline Building Rotation in NC 2009 EAc1: Optimize Energy Performance |
815 |
Marcus Sheffer LEED Fellow 7group Tue, May 21, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
|
Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
14 |
Paula Melton Managing Editor BuildingGreen, Inc. Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
44 |
Ramesh Narayanan Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
RE: Project Participation in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
42 |
USGBC IP Account Tue, May 21, 2013 |
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Performance Period starts after construction in Performance Period |
40 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 16, 2013 |
|
LEED Campus vs LEED Schools vs LEED NC in LEED Rating System Selection Q&A |
331 |
Caroline Hedin Thu, May 16, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: U-Value Units Conversion in International Projects - alternative compliance path |
116 |
Daniela Castro Salgado LEED AP BD+C / Sustainability Coordinator Edmonds International Ltd Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
|
RE: new database in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs |
27 |
Elizabeth Thompson LEED Specialist USGBC Mon, Apr 29, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Low VOC in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
325 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 12, 2009 |
|
RE: Interior renovation within a single tenant building in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
325 | 84 |
Steve Loppnow Sustainability Manager YR&G Mon, Dec 7, 2009 |
|
RE: Process water for EP point in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
325 | 55 |
Dan Ackerstein Principal Ackerstein Sustainability, LLC Wed, Dec 23, 2009 |
|
Tenant spaces are simple, right? in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
323 | 58 |
Richard McKay Mon, Feb 1, 2010 |
|
RE: Outside of the US in CS 2009 EAc6: Green Power |
321 | 40 |
Gunnar Hubbard, AIA, LEED Fellow Principal Thornton Tomasetti Fri, Sep 25, 2009 |
|
RE: Retail space parking in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
319 | 84 |
Devon Bertram Sustainability Manager YR&G Mon, Dec 7, 2009 |
|
Low VOC in CI 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
316 | 55 |
Rona Easton HOK Thu, Nov 12, 2009 |
|
Interior renovation within a single tenant building in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
316 | 84 |
Peter Doo Doo Consulting LLC Tue, Nov 17, 2009 |
|
RE: Interior renovation within a single tenant building in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
313 | 84 |
Mara Baum Healthcare Sustainable Design Leader HOK Tue, Dec 8, 2009 |
|
Site Master Plan - Recalculations in Schools 2009 SSc9: Site Master Plan |
313 | 19 |
Erik Bergstrom Green Building Associate Mon, Dec 7, 2009 |
|
RE: Creating the Floor Plan to show direct access to views in Schools 2009 IEQc8.2: Daylight and Views—Views |
310 | 55 |
Joshua Lloyd Phillip Markwood Architects Thu, Oct 8, 2009 |
|
RE: Question Regarding Requirements in Schools 2009 IEQc8.2: Daylight and Views—Views |
309 | 55 |
Joshua Radoff Principal, LEEDuser Primary Author YRG sustainability Wed, Sep 30, 2009 |
|
Master Plan:Open Space in Schools 2009 SSc9: Site Master Plan |
308 | 19 |
Erik Bergstrom Green Building Associate Wed, Dec 9, 2009 |
|
Creating the Floor Plan to show direct access to views in Schools 2009 IEQc8.2: Daylight and Views—Views |
307 | 55 |
Kim Pomeranz Thu, Oct 8, 2009 |
|
Outside of the US in CS 2009 EAc6: Green Power |
306 | 40 |
Pia Öhrling WSP Mon, Sep 21, 2009 |
|
RE: M&V plan required for case 1, or not? in CI 2009 EAc3: Measurement and Verification |
305 | 74 |
Dave Intner Firmitas Architecture & Planning Mon, Dec 21, 2009 |
|
RE: Is this a typo? in CS 2009 MRc6: Certified Wood |
304 | 23 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 29, 2009 |
|
RE: Retail space parking in CI 2009 SSc3.3: Alternative Transportation—Parking Availability |
304 | 84 |
Devon Bertram Sustainability Manager YR&G Thu, Dec 10, 2009 |
|
The Square Footage in CS 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
303 | 62 |
Alejandro Alfaro Project Director Mexico PGAL Wed, Dec 9, 2009 |
|
RE: CI IEQ p1 ASHRAE 62.1-2007 calculator in CI-2009 IEQp1: Minimum IAQ Performance |
302 | 96 |
Shannon Gray Consultant YRG sustainability Wed, Nov 25, 2009 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
365 |
SW LEE LEED AP Wed, May 22, 2013 |
|
Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
14 |
Paula Melton Managing Editor BuildingGreen, Inc. Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
103 |
FABIO VIERO Head of Sustainability Manens-TiFS s.p.a. Wed, May 22, 2013 |
|
Resubmit After Dening in Review Appeal |
23 |
Chinthaka Jagodaarachchi Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
porous or non-porous material in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
31 |
Shivani Langer Architect SHW Group Tue, May 21, 2013 |
|
Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
170 |
Erica Downs Sustainability & LEED Consultant Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
|
Leakage Rate in v5 Form in EBOM 2009 EAc5: Enhanced Refrigerant Management |
31 |
Andy Rhoades Partner Leading Edge Consulting Mon, May 20, 2013 |
|
Rainwater collection in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
163 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
School addition - LEED Boundary in MPR3: Must use a reasonable site boundary |
97 |
padraic o connell Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
Copyright 2013 – BuildingGreen, Inc.