LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
Duct adhesives in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
71 |
Michael E. Edmonds-Bauer Edmonds International Wed, Jun 19, 2013 |
|
Extended Stay? in CS 2009 SSc2: Development Density and Community Connectivity |
32 |
Sara Neff Director, Sustainability Programs Kilroy Realty Corporation Wed, Jun 19, 2013 |
|
RE: Recycling Rooms in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
192 |
Dylan Connelly Mechanical Engineer Integral Group Wed, Jun 19, 2013 |
|
PI Form 3 occupancy question, transient student vs retail in PIf3: Occupant and Usage Data |
107 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Wed, Jun 19, 2013 |
|
RE: Scooter Parking in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
219 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 19, 2013 |
|
RE: Line between consumables and 'process' consumables in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
78 |
Jeff Benavides Sr. Project Manager ecoPreserve: Building Sustainability Wed, Jun 19, 2013 |
|
RE: E Cigarettes in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
74 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 19, 2013 |
|
Occupant feedback in EBOM 2009 IEQp3: Green Cleaning Policy |
45 |
Sheryl Swartzle LEED administration TLC Engineering for Architecture Wed, Jun 19, 2013 |
|
retention basin and infiltration on site in NC 2009 SSc6.2: Stormwater Design—Quality Control |
109 |
ADRIENN GELESZ LEED AP ABUD Engineering Ltd. Wed, Jun 19, 2013 |
|
RE: Geometry baseline vs. proposed building performance in NC v2.2 EAp2: Minimum Energy Performance |
186 |
jaume balana quadrant Wed, Jun 19, 2013 |
|
RE: Modelling Basement Parking in NC 2009 EAp2: Minimum Energy Performance |
1,426 |
Marcus Sheffer LEED Fellow 7group Wed, Jun 19, 2013 |
|
emergency Stairs in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems |
202 |
Omar ElRawy Wed, Jun 19, 2013 |
|
Definition direct line of sight in NC 2009 SSc8: Light Pollution Reduction |
405 |
Juliane Muench Wed, Jun 19, 2013 |
|
RE: Community Connectivity in NC 2009 SSc2: Development Density and Community Connectivity |
128 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Wed, Jun 19, 2013 |
|
Water Efficiency in Industrail Projects in Pilot Credit 18: Appliance & Process Water Use Reduction |
27 |
Steve Beck Chief Sustainability Officer LeChase Construction Services LLC Wed, Jun 19, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: NSF Applicability to Rainwater Reuse? in Pilot Credit 10: Sustainable Wastewater Management |
37 |
John Nichols Senior Sustainability Coordinator Moseley Architects Mon, Jun 17, 2013 |
|
RE: FSC 100% Pure Wood Doors in Schools 2009 MRc7: Certified Wood |
11 |
Judy Landwehr Product Compliance & Training Manager Masonite Architectural DoorSystems Mon, Jun 17, 2013 |
|
Interior Green Garden in CS 2009 WEc1: Water Efficient Landscaping |
38 |
Diana Nezamutinova Associate Dalen Strategies Mon, Jun 17, 2013 |
|
Feel like being penalized by not providing carpark on site in CS 2009 SSc4.4: Alternative Transportation—Parking Capacity |
23 |
William Wong Mon, Jun 17, 2013 |
|
Discharging the rainwater to municipality facilities. in CS 2009 SSc6.1: Stormwater Design—Quantity Control |
21 |
Mohammed Magdy LEED AP Al Yamama Construction Mon, Jun 17, 2013 |
|
RE: Durable Goods - Furniture in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods |
61 |
Trista Little Sustainability Manager YR&G Sun, Jun 16, 2013 |
|
RE: No car park or external areas in EBOM 2009 SSc7.1: Heat Island Reduction—Nonroof |
38 |
Trista Little Sustainability Manager YR&G Fri, Jun 14, 2013 |
|
Sealant VOCs in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
296 |
E H Sustainability Architect Fri, Jun 14, 2013 |
|
RE: LEED online template update in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
175 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Fri, Jun 14, 2013 |
|
LEED CI for Retail WEp1 in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency |
219 |
Blythe Jopling Fri, Jun 14, 2013 |
|
School Busses in CI 2009 SSc3.1: Alternative Transportation—Public Transportation Access |
24 |
Lauren Fakhoury Research Assistant Sustainable Design Consulting, LLC Thu, Jun 13, 2013 |
|
RE: Rodent bait traps in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan |
55 |
Sheryl Swartzle LEED administration TLC Engineering for Architecture Thu, Jun 13, 2013 |
|
LEED EBOM on Industrial Buildings in PIf1: Minimum Program Requirements |
70 |
Pedro Ribeiro Director of Sustainability Edifícios Saudáveis Consultores Thu, Jun 13, 2013 |
|
RE: NDPp3 and a Campus Project in ND-v2009: Connected and open community |
19 |
Eliot Allen AICP, LEED AP-ND, CNU-A Principal, Criterion Planners LEED Faculty, LP TAG Wed, Jun 12, 2013 |
|
Moveable Walls for Views Calculations? in NC 2009 IEQc8.2: Daylight and Views—Views |
251 |
Curtis Dorosh Light House Wed, Jun 12, 2013 |
|
Construction EQ Management Plan in Healthcare-v2009: Construction IAQ management plan - during construction |
1 |
Todd Bundren Associate Lawrence Group Wed, Jun 12, 2013 |
|
Is it possible to modify a LEED boundary already registered? in MPR3: Must use a reasonable site boundary |
100 |
Mauricio J Perez R Wed, Jun 12, 2013 |
|
RE: Natural Ventilation Multiunit Residential Results in NC-2009 IEQp1: Minimum IAQ Performance |
479 |
Michael Wironen Ecology and Environment, Inc. Wed, Jun 12, 2013 |
|
RE: Content of mechanical schedule in PIf4: Schedule and Overview Documents |
40 |
Michael Wironen Ecology and Environment, Inc. Wed, Jun 12, 2013 |
|
Frankenstein Building Reuse in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof |
52 |
Brett Beckemeyer LEED-AP, BD&C Fox Architects Wed, Jun 12, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
New USGBC searchable database.. in Key LEED 2009 Interpretations |
4 |
Lewis Hewton Thu, Apr 11, 2013 |
|
get to know LEED in Cabinets |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Apr 5, 2013 |
|
Partial interior fit-out in LEED CI - Is there a minimum tenant rennovation scope? |
10 |
Mariela Garate Clarke Architect Green Building Council Chile Thu, Apr 4, 2013 |
|
update to LI #10250 in New Rules for Formaldehyde in IEQc4.4 |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 2, 2013 |
|
RE: Re: Building Additions in Building Additions |
3 |
Rosamaría Mellone Green Building and Alternative Energy Mon, Apr 1, 2013 |
|
RE: Guardbooth in Site Boundary |
69 |
Brad Gambrell RIM Architects Thu, Mar 28, 2013 |
|
prescriptive maintenance in CMP reporting - what happens after webinars are complete? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Mar 27, 2013 |
| LEED-CI Silver Office Documentation Available on LEEDuser | - |
by Tristan Roberts Tue, Mar 26, 2013 |
|
RE: BUILDING FOOTPRINT in PI Form 2 Project Summary Details |
65 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 25, 2013 |
|
RE: Stairs in Does underground parking count for certification fees? |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Mar 22, 2013 |
|
RE: LEED GA and LEED AP exam changes in Do you have questions for GBCI? |
44 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
join LEEDuser in New for LEED need help |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
EAp2 forum in Appendix G and anair conditioned distribution center |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
EAp2 forum in Reference building for a dewatering facility |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: Silver or higher membership required for member discounts in New USGBC Membership Fee Structure |
55 |
Hernando Miranda Owner Soltierra LLC Wed, Mar 20, 2013 |
|
RE: LEED AP v4 in LEED NC 2009 (v3) Professional Credentials |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 18, 2013 |
|
RE: LEED-CS sunset date in Sunset Dates for CI/CSv2.0 |
2 |
Kristina Bach CORE Steward Cooper Carry Wed, Mar 13, 2013 |
|
asbestos roof in Asbestos Roof |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 11, 2013 |
| Advice for writing a LEED EB:O+M consulting contract | - |
by Lyle Axelarris Thu, Mar 7, 2013 |
|
RE: Is it really the windows? in Poor Cell Phone Service in LEED buildings |
4 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Mar 6, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: What you are saying is indeed in Schools 2009 SSc9: Site Master Plan |
290 | 19 |
Shannon Gray Consultant YRG sustainability Fri, Dec 11, 2009 |
|
What constitutes a "Master Plan"? in Schools 2009 SSc9: Site Master Plan |
289 | 19 |
Peter Doo Doo Consulting LLC Mon, Jan 4, 2010 |
|
RE: Recycling in CI 2009 MRp1: Storage and Collection of Recyclables |
288 | 48 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 27, 2010 |
|
Dormitory that is No Smoking in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
287 | 190 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Tue, Jan 26, 2010 |
|
RE: Pin-based CFL's in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps |
285 | 103 |
Drew Johnson LEED AP O+M Tue, Dec 29, 2009 |
|
"Building Completed 1993 or Later" Tab on Graph in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
285 | 55 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Fri, Jan 22, 2010 |
|
What you are saying is indeed in Schools 2009 SSc9: Site Master Plan |
285 | 19 |
Erik Bergstrom Green Building Associate Wed, Dec 9, 2009 |
|
How many showers & racks are needed? in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
283 | 74 |
Adolfo Silva Principal Ecovert Corporation Thu, Dec 17, 2009 |
|
Energy Star for a Manufacturing - Assembly Company in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
283 | 76 |
Robert McNeice Thu, Dec 3, 2009 |
|
Off Site Renewable Energy in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
282 | 68 |
Reynaldo Castro Sat, Jan 9, 2010 |
|
Automatic Credits for tenant improvement in new LEED Silver bldg in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
282 | 53 |
Judy Peterson Sr. Associate - NW Interior Design Heery International Wed, Sep 2, 2009 |
|
Designated Smoking Areas in parking garages in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
281 | 74 |
Jason Franken Sustainability Professional Tue, Jun 2, 2009 |
|
RE: Which Spaces Should Be Included? in NC 2009 IEQc2: Increased Ventilation |
281 | 55 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 19, 2010 |
|
Existing bike storage and showers in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
281 | 74 |
Peter Doo Doo Consulting LLC Tue, Nov 17, 2009 |
|
RE: Off gasing furniture in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
281 | 55 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 5, 2010 |
|
Regionally manufactured materials in NC 2009 MRc5: Regional Materials |
279 | 154 |
Carrie Gunzel Mon, Dec 7, 2009 |
|
Question Regarding Requirements in Schools 2009 IEQc8.2: Daylight and Views—Views |
279 | 55 |
John Drigot Design/LEED Specialist The Neenan Company Mon, Sep 28, 2009 |
|
Off gasing furniture in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
279 | 55 |
Peter Doo Doo Consulting LLC Mon, Jan 4, 2010 |
|
Pin-based CFL's in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps |
278 | 103 |
Drew Johnson LEED AP O+M Mon, Dec 28, 2009 |
|
ISSUE Part 2 in CI-2009 IEQp1: Minimum IAQ Performance |
278 | 99 |
Green Living LLC Elizabeth Gharib Tue, Jan 26, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Frankenstein Building Reuse in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof |
52 |
Brett Beckemeyer LEED-AP, BD&C Fox Architects Wed, Jun 12, 2013 |
|
Missed it by a year! in First-in-Country Projects to Get Free LEED Certification |
5 |
Alejandro Rivera Rivera Junior Engineer Studio Domus Wed, Jun 12, 2013 |
|
Other routes for airflow measurment devices in CI 2009 IEQc1: Outdoor Air Delivery Monitoring |
25 |
M K Wed, Jun 12, 2013 |
|
Non-densely occupied spaces without airflow measurement device in CI 2009 IEQc1: Outdoor Air Delivery Monitoring |
25 |
M K Wed, Jun 12, 2013 |
|
Normalizing the Baseline in EBOM 2009 EAp2: Minimum Energy Efficiency Performance |
396 |
Timothy Casper Voith & Mactavish Architects Wed, Jun 12, 2013 |
|
Normalizing Baseline in EBOM 2009 EAc1: Optimize Energy Efficiency Performance |
99 |
Timothy Casper Voith & Mactavish Architects Wed, Jun 12, 2013 |
|
Occupant Comfort Survey in Start a New LEED Discussion Topic |
20 |
Hanan Abou Merhi Wed, Jun 12, 2013 |
|
Residential private units vs natural ventilation in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
190 |
JOHANNA SENOTT Architect / Environmental adviser EA Energia y Arquitectura Tue, Jun 11, 2013 |
|
Construction Documents in Construction Documents |
2 |
Jeannine Cone Tue, Jun 11, 2013 |
|
Using a Day sim simulation with Google sketch up model in NC v2.2 EQc8.1: Daylight and Views—Daylight 75% of Spaces |
141 |
Suzanne Allerton Architect W2A Design Group Tue, Jun 11, 2013 |
|
50% of material purchase & composite panel question in EBOM 2009 MRc3: Sustainable Purchasing—Facility Alterations and Additions |
56 |
Karin Wohlert Northwest Sustainability Consulting, LLC Mon, Jun 10, 2013 |
|
Preferred parking in master site project in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
197 |
Lolita Wu Sun, Jun 9, 2013 |
|
On Site Renewable in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
68 |
Joseph Snider, AIA, LEED AP LEED Architect SEQUIL Systems, Inc. Sat, Jun 8, 2013 |
|
Campus projects with different rating system in International Projects - alternative compliance path |
120 |
Lolita Wu Fri, Jun 7, 2013 |
|
Use of EA Cr 6 for a CS Project in EBOM 2009 EAc6: Emissions Reduction Reporting |
28 |
emily reese Architectural Designer / Sustainable Facility Planner Jacobs Engineering Thu, Jun 6, 2013 |
|
Whole building Energy and Water Usage Data in MPR6: Must commit to sharing whole-building energy and water usage data |
11 |
Terry Squyres Principal GWWO Inc./Architects Thu, Jun 6, 2013 |
|
No-break (UPS - UPS - Uninterruptible Power Supplies) in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances |
189 |
Vitorio Lepiane Sustentech Thu, Jun 6, 2013 |
|
Cool Initiative in First-in-Country Projects to Get Free LEED Certification |
5 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, Jun 5, 2013 |
|
Mixed Mode Natural & Mechanical Ventilation...? in NC 2009 IEQc2: Increased Ventilation |
55 |
Tony Ricketts Mechanical Engineer Wick Fisher White Wed, Jun 5, 2013 |
|
LEED for Healthcare - EAc7 - in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases |
5 |
Catherine Blakemore Architect, LEED AP BC+D HOLT Architects Wed, Jun 5, 2013 |
Copyright 2013 – BuildingGreen, Inc.