LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
101 |
Rebecca Grant Dull Olson Weekes - IBI Group Architects, Inc. Wed, May 22, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
32 |
Shivani Langer Architect SHW Group Wed, May 22, 2013 |
|
RE: minimum required irrigated area in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
76 |
Kris Phillips Architect Arcadis Wed, May 22, 2013 |
|
RE: Acoustics study in NC 2009 IDc1: Innovation in Design |
365 |
Katie Schulze Project Specialist Investive Building Projects Wed, May 22, 2013 |
|
RE: No Smoking Signs in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
189 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: VAV FAN POWER BOX MODELING in NC 2009 EAp2: Minimum Energy Performance |
1,362 |
HOUCINE TLEMSANI Mechanical Designer MEP Engineering Solutions, Inc Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Modeling LEED 2009 District Energy Systems in NC 2009 EAc1: Optimize Energy Performance |
817 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
264 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Wed, May 22, 2013 |
|
RE: HVAC to meet COP, outside US in CI 2009 EAp2: Minimum Energy Performance |
366 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: PV's special rate in NC 2009 EAc2: On-Site Renewable Energy |
104 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: WE C1, Option 2, Path 2 submittal requirements in NC 2009 WEc1: Water Efficient Landscaping |
236 |
Kathryn West LEED AP O+M, Guiding Principles Compliance Professional Energy Ace Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Dairy products as finishes, not food! in NC v2.2 MRc6: Rapidly Renewable Materials |
23 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 21, 2011 |
|
RE: RPCs for projects registered under LEED CS v.2.0 in CS 2009 RPc1: Regional Priority |
12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Dec 15, 2011 |
|
RE: Can a PC count for Campus? in Pilot Credit 41: Wastewater Management (Neighborhood Development) |
2 |
Batya Metalitz Manager, LEED Technical Development USGBC Wed, May 25, 2011 |
|
RE: Building Move and Reuse in Schools-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof |
14 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 25, 2012 |
|
RE: Air Speed Control in Schools 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
3 |
SERA Architects SERA Architects Wed, May 11, 2011 |
|
RE: 62MZ Calculation for IEQ2 - For VAV Systems in Schools 2009 IEQc2: Increased Ventilation |
5 |
Julia Weatherby Senior Mechanical Engineer Lindgren & Sharples, P.C. Wed, May 11, 2011 |
|
RE: Sampling in Pilot Credit 36: Compartmentalization |
3 |
Asa Foss LEED for Homes Techincal Development US Green Building Council Wed, Mar 30, 2011 |
|
RE: Non-structural wall resurfacing in Schools 2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 25, 2012 |
|
RE: LEED for Homes Midrise (Pilot)- Baseline Building Surprises in Pilot Credit 33: Performance of ENERGY STAR for Homes |
3 |
alexandra ramsden Sustainability Rushing Wed, Feb 23, 2011 |
|
RE: Definition of "residential area or neighborhood and more in Schools 2009 SSc2: Development Density and Community Connectivity |
6 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 25, 2012 |
|
RE: Regional Priority Credits for Schools 2007? in Schools 2009 RPc1: Regional Priority |
8 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Dec 15, 2011 |
|
Help test the Pilot Credits! in Pilot Credit 35: Environmental Tobacco Smoke |
1 |
Maureen Mahle Program Manager, LEED for Homes Steven Winter Associates, Inc. Wed, Dec 22, 2010 |
|
RE: SSc6.2 - Calculate % of Annual Rainfall Treated by BMP in Schools 2009 SSc6.1: Stormwater Design—Quantity Control |
4 |
Gregory Hurst Office Manager Robert Peccia & Associates Wed, Mar 6, 2013 |
|
RE: CxA as employee of Owner in Schools 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 15, 2010 |
|
RE: Low-flush WC problems in Schools 2009 WEc2: Innovative Wastewater Technologies |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Sep 5, 2012 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: KEMA Services in Recommendations for companies that perform ASHRAE Level I Energy Audit around the Sacramento area? |
2 |
Andy Rhoades Partner Leading Edge Consulting Tue, Jul 27, 2010 |
|
RE: good question in credit stats |
2 |
Natesan Seshagiri Architect Tue, Jul 27, 2010 |
|
EBOM changes explored in more depth in July 2010 LEED Addenda Published by USGBC |
17 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Jul 27, 2010 |
|
RE: Construction phase in Changes after Design Submittal |
2 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Tue, Jul 27, 2010 |
|
RE: Manufactured Offices? in ASHRAE 90.1- 2.3 |
2 |
Jun Hashimoto RLA, LEED-AP Mon, Jul 26, 2010 |
|
RE: Length of construction project in EBOM or NC? When is it too late to utilize the NC rating system? |
2 |
Thomas Boyd MEP Construction Manager Tonn and Blank Construction, LLC Sat, Jul 24, 2010 |
|
RE: Also, fees... in Switching from NC to EB |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
RE: LEED for Healthcare date in Healthcare |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
looking for this in LEED Reference Guides in MRc4 Referenced Standards : FTC vs. ISO |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sat, Jul 24, 2010 |
|
From the current FAQ located in About Regional Priority Credits |
1 |
Tim Rogers Designer The Clark Enersen Partners Wed, Jul 21, 2010 |
| Energy Plus or EQuest | - |
by Billy Ng Fri, Jul 23, 2010 |
| New Unlocked LEED Checklists from USGBC | - |
by Tristan Roberts Mon, Jul 19, 2010 |
|
ERB-approved in How to get certified to teach a CEU? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 19, 2010 |
|
Chris- both you and the owner in Energy Star Portfolio Manager |
1 |
Allison Beer McKenzie Architect, Director of Sustainability SHP Leading Design Fri, Jul 16, 2010 |
|
check with GBCI in Vertically Attached Building |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 12, 2010 |
|
work under IDc1 in Construction Waste Management |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 12, 2010 |
|
LEED Online roles in project team administration |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 12, 2010 |
|
post to EAp2 or EAc1 forum in innovation in design credit for reduction in peak energy load |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 12, 2010 |
|
see LEED CMP webinar in CE Hours |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jul 12, 2010 |
|
RE: No hard deadline in Qualifying Period for LEED certification |
2 |
Grace Ming ESD Consultant Tue, Jul 6, 2010 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
SRECs in NC v2.2 EAc2: On-Site Renewable Energy |
65 | 31 |
Michelle Cottrell President Design Management Services Thu, Aug 26, 2010 |
|
RE: Separate design and construction commissioning agents? in NC v2.2 EAc3: Enhanced Commissioning |
65 | 43 |
Chris Ladner Partner Viridian Wed, Apr 6, 2011 |
|
Actual VOC Content in Schools IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
65 | 22 |
Carmelito Tatlonghari LEED-AP BD+C Leighton Contractors Philippines, Inc. Tue, Jul 27, 2010 |
|
RE: LEED outside the US in Comment on the New LEED Rating System Draft to be Released in 2012 |
64 | 97 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Jan 14, 2011 |
|
RE: Outside of the US in CS 2009 EAc6: Green Power |
64 | 40 |
Billy Ng Mon, Aug 30, 2010 |
|
just what I needed! in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
64 | 12 |
C Brokaw Architect Tue, Feb 8, 2011 |
|
RE: just what I needed! in Easy Access to LEED Online Forms Through LEEDuser's Documentation Toolkits |
64 | 12 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 8, 2011 |
|
Ongoing Commissioning Overlap with New Building Commissioning in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning |
64 | 26 |
Doug Pierce, AIA Architect / Sustainability Strategist Perkins+Will Tue, Aug 10, 2010 |
|
RE: LEED EBOM performance period for EA credits. in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
64 | 73 |
Adam Meltzer LEED AP_Designer Shlemmer+Algaze+Associates Wed, Aug 18, 2010 |
|
RE: I-BEAM in EBOM 2009 IEQc1.1: IAQ Best Management Practices—IAQ Management Program |
64 | 20 |
John Beeson Chief Mystic in Resident betterENVIRONMENT, LLC Fri, Aug 20, 2010 |
|
Help with review comments in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials |
64 | 84 |
ZEB Tech singapore ESD Consultancy ZEB-Technology Pte Ltd Sun, Aug 8, 2010 |
|
Preventive maintenance program in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency |
64 | 217 |
Rachael McClain Mon, Sep 13, 2010 |
|
RE: IEQ Testing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
64 | 287 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Dec 10, 2009 |
|
IEQ C6.2, acceptable adjustable diffusers? in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
64 | 112 |
mike diess Engineer LNI, inc. Fri, Aug 27, 2010 |
|
shift work in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
64 | 157 |
Martin Mechtenberg Sat, Nov 21, 2009 |
|
Blowdown water for irrigation? in NC 2009 WEc1: Water Efficient Landscaping |
64 | 236 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Dec 28, 2009 |
|
RE: Commissioning LEED Submittal in NC v2.2 EAc3: Enhanced Commissioning |
64 | 43 |
David Hubka GROUP Leader E3 GROUP Wed, Mar 30, 2011 |
|
Our project team is thinking in NC v2.2 IDc1: Innovation in Design |
64 | 116 |
Kath Williams LEED Fellow, Principal Kath Williams + Associates Mon, Sep 13, 2010 |
|
RE: Base Line Budget and Change Orders in NC v2.2 MRc6: Rapidly Renewable Materials |
64 | 23 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Aug 20, 2010 |
|
Prime farmland area in NC v2.2 SSc1: Site Selection |
64 | 19 |
Tongsu Han Thu, Sep 9, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Pilot Credit 45 in Pilot Credit 45: Site Assessment |
5 |
Rachel McCaffery Weston Solutions, Inc. Mon, May 7, 2012 |
|
Where do special review requirements come from? in Review Comments with Phantom Requirements |
59 |
Hernando Miranda Owner Soltierra LLC Sat, May 5, 2012 |
|
credit for MR4 or MR7 in CI 2009 MRc7: Certified Wood |
82 |
Steven Jones Vice President Quinn Evans Architects Thu, May 3, 2012 |
|
WEp1 - Total Daily Usage Rates in CS 2009 WEp1: Water Use Reduction—20% Reduction |
155 |
Krista Wayne Thu, May 3, 2012 |
|
MPR 2 'complete building' & LEED HC MRc6 Design for Flexibility in LEED Minimum Program Requirements |
428 |
Susan Walter Sr Project Architect Wilmot/Sanz Thu, May 3, 2012 |
|
Property Manager vs Facility Manager in Required Signatories in LEED Online Forms |
43 |
Johanna Ofner Wed, May 2, 2012 |
|
Conference Call with Review Team prior to submittal in Do you have questions for GBCI? |
44 |
Alison Y Rivenburgh Tue, May 1, 2012 |
|
retaining LEED certification in Loss of LEED Certification after renovating? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 1, 2012 |
|
Reference Guide E-Books need to be editable or updated by USGBC in LEED 2012 Behind the Scenes - follow up conversation |
4 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Tue, May 1, 2012 |
|
GBCI Changes - Notification and Timing in Do you have questions for GBCI? |
44 |
Harvard University Green Building Services Mon, Apr 30, 2012 |
|
"Confidential" projects in Do you have questions for GBCI? |
44 |
Kath Williams LEED Fellow, Principal Kath Williams + Associates Mon, Apr 30, 2012 |
|
Signatories in LEED 2012 Behind the Scenes - follow up conversation |
4 |
Brittany Eldredge Mon, Apr 30, 2012 |
|
LEED online access and compatability in leedonline.com access - is it possible??? |
6 |
Sherri Brown Thu, Apr 26, 2012 |
|
USGBC Energy and Water Data Release Authorization Form Upload in MPR 6 - Energy Star Portfolio Manager |
47 |
Kendal Neitzke LEED Administrator, LEED AP O&M, Assoc. AIA MSI General Corporation Wed, Apr 25, 2012 |
|
Tenant Space Ventilation in CS-2009 IEQp1: Minimum IAQ Performance |
90 |
Luis Miguel Diazgranados Green Factory Tue, Apr 24, 2012 |
|
C&S Default Occupancy - Unoccupied zones in CS 2009 EAp2: Minimum Energy Performance |
518 |
Omar Katanani Tue, Apr 24, 2012 |
|
Detached Offices and Restroom in LEED Minimum Program Requirements |
428 |
Prudence Ferreira Principal Integral Impact Inc Mon, Apr 23, 2012 |
|
System type and OA input in CS 2009 EAp2: Minimum Energy Performance |
518 |
Mary Ann Santos Sat, Apr 21, 2012 |
|
Weather data for sizing runs in NC 2009 EAc1: Optimize Energy Performance |
817 |
Francesco Passerini Fri, Apr 20, 2012 |
|
IEQp1 Compliance ? in CI-2009 IEQp1: Minimum IAQ Performance |
96 |
George Bender arora engineers Thu, Apr 19, 2012 |
Copyright 2013 – BuildingGreen, Inc.