Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    108 Todd Reed
    Daylight Designer
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    Title Comments Most Recent Post
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    108 Todd Reed
    Daylight Designer
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    RE: How to define vision glazing
    in NC 2009 IEQc8.2: Daylight and Views—Views
    248 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    120 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Thu, May 23, 2013
    RE: Property Boundry.
    in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
    2 Candace Small
    Thu, May 23, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    34 Candace Small
    Thu, May 23, 2013
    RE: Interior Places of Respite
    in Healthcare-v2009: Connection to the natural world - places of respite
    5 Candace Small
    Thu, May 23, 2013
    Title Comments Most Recent Post
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    Can't select "other" in space usage type drop down
    in Filling out Space Usage Type
    18 Shivani Langer
    Architect
    SHW Group
    Thu, May 23, 2013
    LEED Healthcare Certification Level Costs and Challenges
    in LEED Rating System Selection Q&A
    332 Arpan Bakshi
    Thu, May 23, 2013
    RE: Resubmit After Dening
    in Review Appeal
    24 Jim Park
    Project Manager
    EAN Technology
    Thu, May 23, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    RE: Correction
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    15 Peggy White
    White + GreenSpec
    Wed, May 22, 2013
    RE: Regarding LEED certification for District Cooling Plant
    in New District Energy Guidance for LEED Released by USGBC
    45 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    LEED EB:OM
    in Start a New LEED Discussion Topic
    11 Lennart Lifvenhjelm
    Vasakronan AB
    Wed, May 22, 2013
    RE: v3 stormwater design vs v4 rainwater management
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    94 Theresa Backhus
    Sites Technical Specialist
    USGBC
    Tue, May 21, 2013
    RE: MRc4 recycled content---recovered fiber
    in MR Credit 4- Recycled Content
    4 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 21, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: (Jacob) Calculating for Future Growth
    in Calculating FTEs
    135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 14, 2013
    RE: about that working group....
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Marian Keeler
    Senior Associate
    Thornton Tomasetti / Simon & Associates
    Mon, May 13, 2013
    RE: Cannot login to LEED Online..
    in Living with LEED Online - quirks, bugs and hiccups
    103 Francisca Herrera
    Miranda & Nasi
    Mon, May 13, 2013
    RE: V4 implementation and '09 phase out
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 10, 2013
    RE: Master Site and different buidings certifications
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Eric Anderson
    Technical Customer Service Specialist
    GBCI
    Fri, May 10, 2013
    Tenant Sales or Lease Agreement
    in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
    19 Julie Hendricks
    Director of EcoServices
    Kirksey
    Sun, May 5, 2013
    RE: BD&C Exam Prep
    in Earn CEUs on LEEDuser—With Ease
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 30, 2013
    Title Votes Comments Most Recent Post
    RE: With Specialty expired
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    9 43 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Nov 2, 2012
    RE: With Specialty expired
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    9 43 Erin Emery Hartz
    Manager, Marketing & Product Development
    U.S. Green Building Council
    Fri, Nov 2, 2012
    How does this people still using the title LEED AP
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    9 43 Zachary Rohlfs
    Plumbing and Fire Protection Engineer
    Tue, Nov 6, 2012
    RE: How does this people still using the title LEED AP
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    9 43 Zachary Rohlfs
    Plumbing and Fire Protection Engineer
    Thu, Nov 8, 2012
    Registration fees refunded if you get high certification level
    in Understanding the Cost of LEED-NC Project Certification
    9 43 shashank jain
    Environmental Analyst
    BDSP Partnership
    Fri, Oct 12, 2012
    RE: Regional Priority Credit Outside USA
    in EBOM 2009 RPc1: Regional Priority
    9 44 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Thu, Jul 5, 2012
    RE: New Recertification Guidance!
    in Recertification
    9 44 Alicia Chu
    Sustainability Advisor
    Healthy Buildings
    Sat, Jul 21, 2012
    RE: New Recertification Guidance!
    in Recertification
    9 44 Barry Giles
    Founder & CEO, USGBC LEED Faculty, LEED AP O+M
    BuildingWise LLC
    Sat, Jul 21, 2012
    Recertification LEED Online v3 Registration
    in Recertification
    9 44 Alicia Chu
    Sustainability Advisor
    Healthy Buildings
    Wed, Aug 15, 2012
    LEED speciality will need to match to project type?
    in Do you have questions for GBCI?
    9 44 Valerie J. Amor
    Visionary - CEO/President/Founder
    Drawing Conclusions LLC
    Sun, Jun 24, 2012
    RE: LEED GA and LEED AP exam changes
    in Do you have questions for GBCI?
    9 44 Michael Zhang
    professional
    KKECO
    Mon, Jun 4, 2012
    RE: Phantom Requirements
    in Do you have questions for GBCI?
    9 44 Robert Andrews
    Partner
    AHA Consulting Engineers, Inc.
    Wed, May 2, 2012
    RE: Charging for plaques??
    in Do you have questions for GBCI?
    9 44 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, May 2, 2012
    RE: Owner Agent Forms Process Improvements
    in Do you have questions for GBCI?
    9 44 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 2, 2012
    RE: statistics and consistency
    in Do you have questions for GBCI?
    9 44 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Wed, May 9, 2012
    RE: Energy Modeling Technical Questions and Answers
    in Do you have questions for GBCI?
    9 44 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Fri, Jun 1, 2012
    What is considered "participation" for LEED Project CE hours?
    in Video: LEED AP Credential Maintenance
    9 44 Andy Rolfs
    Sr. Project Engineer
    Flintco, Inc.
    Tue, Apr 10, 2012
    RE: What is considered "participation" for LEED Project CE hours?
    in Video: LEED AP Credential Maintenance
    9 44 Mara Baum
    Healthcare Sustainable Design Leader
    HOK
    Tue, Apr 10, 2012
    Property Manager vs Facility Manager
    in Required Signatories in LEED Online Forms
    9 44 Johanna Ofner
    Wed, May 2, 2012
    RE: Salvaged granite block
    in NC 2009 MRc3: Materials Reuse
    9 45 Susie Spivey-Tilson
    Project Management Sustainability Services
    CBRE
    Mon, Jun 11, 2012
    Title Comments Most Recent Post
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    LEED Project Boundary for a Train Station
    in MPR3: Must use a reasonable site boundary
    97 Michael Guadagnoli
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    ASHRAE 62.1 - 2007 Occupant Density vs T24
    in NC-2009 IEQp1: Minimum IAQ Performance
    467 Jauni Novak
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    No file uploads?
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Carly Ruggieri
    Senior Sustainability Consultant
    Steven Winter Associates, Inc.
    Thu, May 23, 2013
    SSc4 Alternate Commuting Transportation - survey question
    in Doing the Alternative Commuting Transportation Survey
    9 Heather Reiners
    MetroPool Inc.
    Thu, May 23, 2013
    Change in Owner signature
    in Required Signatories in LEED Online Forms
    44 Green Domus
    Green Domus
    Thu, May 23, 2013
    Can't select "other" in space usage type drop down
    in Filling out Space Usage Type
    18 Shivani Langer
    Architect
    SHW Group
    Thu, May 23, 2013
    LEED Healthcare Certification Level Costs and Challenges
    in LEED Rating System Selection Q&A
    332 Arpan Bakshi
    Thu, May 23, 2013
    Still a Pilot Credit?
    in Pilot Credit 7: Light Pollution Reduction
    24 Caroline Hedin
    Wed, May 22, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    Street trees
    in Pilot Credit 14: Walkable Streets
    46 Roland Le Roux
    Green Building Consultant
    Wed, May 22, 2013

    Copyright 2013 – BuildingGreen, Inc.