Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    Submittal templates in metric Units
    in PIf1: Minimum Program Requirements
    66 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 25, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    109 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Fri, May 24, 2013
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Title Comments Most Recent Post
    Submittal templates in metric Units
    in PIf1: Minimum Program Requirements
    66 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 25, 2013
    RE: Option 3 - Measurement
    in Schools 2009 IEQc8.1: Daylight and Views—Daylight
    109 Eddy Santosa
    Sustainable Design Coordinator
    HMC Architects
    Fri, May 24, 2013
    RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
    in NC 2009 EAp2: Minimum Energy Performance
    1,381 TOMAS URIBE
    PROJECT MANAGER
    SOLUCIONES ENERGETICAS SOSTENIBLES
    Fri, May 24, 2013
    Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Craig Sieben
    President
    Sieben Energy Associates
    Fri, May 24, 2013
    RE: Gravel
    in NC 2009 SSc7.1: Heat Island Effect—Nonroof
    167 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, May 24, 2013
    infill site
    in ND-v2009: Restoration of habitat or wetlands and water bodies
    1 Cardy V
    Fri, May 24, 2013
    RE: EA Credit 1 - Using available waste oil for heating
    in NC 2009 EAc1: Optimize Energy Performance
    821 Marcus Sheffer
    LEED Fellow
    7group
    Fri, May 24, 2013
    RE: Golf Courses
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Ellen Mitchell
    Sustainable Design Coordinator
    HKS, Inc.
    Fri, May 24, 2013
    EAp 1 Performance Period
    in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
    74 Lucy Williams
    Principal
    Lucy C. Williams, Architect
    Fri, May 24, 2013
    RE: Design Respons from GBCI C6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    119 Michael DeVuono
    T&M Associates
    Fri, May 24, 2013
    RE: Correct FSC Claim
    in NC v2.2 MRc7: Certified Wood
    149 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 24, 2013
    Parking space separate problem
    in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
    194 Nan ZHANG
    Thu, May 23, 2013
    HCFC123 or HFC410A
    in NC 2009 EAp3: Fundamental Refrigerant Management
    35 edward deschapell
    Facility Manager
    Airbus North America
    Thu, May 23, 2013
    RE: Spray insulation
    in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants
    128 Laurie Winter
    Thu, May 23, 2013
    Landscape not performing well (post certification)
    in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
    77 Jill Tomczyk
    Thu, May 23, 2013
    RE: How to define vision glazing
    in NC 2009 IEQc8.2: Daylight and Views—Views
    248 Hernando Miranda
    Owner
    Soltierra LLC
    Thu, May 23, 2013
    JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
    in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
    37 Michelle Bracewell-Musson
    Owner, LEED AP
    Musson General Contracting & Green Expectations Sustainability Solutions
    Thu, May 23, 2013
    RE: Zero-Waste Office as LEED CI ID Credit
    in CI 2009 IDc1: Innovation in Design
    120 Adam Knoff
    Sustainability Project Manager
    Unico Properties
    Thu, May 23, 2013
    RE: Property Boundry.
    in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
    2 Candace Small
    Thu, May 23, 2013
    RE: Can after school care be included in Joint use facilities?
    in Schools SSc10: Joint Use of Facilities
    34 Candace Small
    Thu, May 23, 2013
    Title Comments Most Recent Post
    When to submit for construction Review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Jon Quigley
    Fri, May 24, 2013
    3 month performance period vs. Construction
    in Performance Period
    42 Karin Wohlert
    Northwest Sustainability Consulting, LLC
    Thu, May 23, 2013
    last minute
    in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
    43 Bill Swanson
    PE, LEED AP
    Integrated Architecture
    Thu, May 23, 2013
    Can't select "other" in space usage type drop down
    in Filling out Space Usage Type
    18 Shivani Langer
    Architect
    SHW Group
    Thu, May 23, 2013
    LEED Healthcare Certification Level Costs and Challenges
    in LEED Rating System Selection Q&A
    332 Arpan Bakshi
    Thu, May 23, 2013
    RE: Resubmit After Dening
    in Review Appeal
    24 Jim Park
    Project Manager
    EAN Technology
    Thu, May 23, 2013
    Help, please
    in International Projects - alternative compliance path
    117 Stefanie Hoffmann
    HAAGA HELIA OY Ab
    Wed, May 22, 2013
    RE: Correction
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    15 Peggy White
    White + GreenSpec
    Wed, May 22, 2013
    RE: Regarding LEED certification for District Cooling Plant
    in New District Energy Guidance for LEED Released by USGBC
    45 Marcus Sheffer
    LEED Fellow
    7group
    Wed, May 22, 2013
    LEED EB:OM
    in Start a New LEED Discussion Topic
    11 Lennart Lifvenhjelm
    Vasakronan AB
    Wed, May 22, 2013
    RE: v3 stormwater design vs v4 rainwater management
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    94 Theresa Backhus
    Sites Technical Specialist
    USGBC
    Tue, May 21, 2013
    RE: MRc4 recycled content---recovered fiber
    in MR Credit 4- Recycled Content
    4 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 21, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: (Jacob) Calculating for Future Growth
    in Calculating FTEs
    135 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 14, 2013
    RE: about that working group....
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Marian Keeler
    Senior Associate
    Thornton Tomasetti / Simon & Associates
    Mon, May 13, 2013
    RE: Cannot login to LEED Online..
    in Living with LEED Online - quirks, bugs and hiccups
    103 Francisca Herrera
    Miranda & Nasi
    Mon, May 13, 2013
    RE: V4 implementation and '09 phase out
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 10, 2013
    RE: Master Site and different buidings certifications
    in New LEED Guidance for Campuses and Multiple Buildings
    318 Eric Anderson
    Technical Customer Service Specialist
    GBCI
    Fri, May 10, 2013
    Tenant Sales or Lease Agreement
    in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
    19 Julie Hendricks
    Director of EcoServices
    Kirksey
    Sun, May 5, 2013
    RE: BD&C Exam Prep
    in Earn CEUs on LEEDuser—With Ease
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 30, 2013
    Title Votes Comments Most Recent Post
    RE: Ongoing Commissioning Overlap with New Building Commissioning
    in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
    58 26 Pierce Holstrom
    Director of Engineering
    Environmental Building Strategies
    Wed, Aug 11, 2010
    RE: LEED CI v2.0 EQc4.5 Template
    in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
    58 102 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Aug 29, 2010
    USGBC responses to comments on LEED Interpretations
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    58 27 Cara Mae Cirignano
    Specialist, LEED Resource Development
    US Green Building Council
    Tue, Mar 1, 2011
    RE: USGBC responses to comments on LEED Interpretations
    in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
    58 27 Marcus Sheffer
    LEED Fellow
    7group
    Thu, Mar 3, 2011
    RE: Existing Equipment
    in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
    58 188 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Thu, Aug 12, 2010
    RE: Offices building Project Boundary
    in LEED Minimum Program Requirements
    58 428 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, May 24, 2011
    LEED Campus Certification with complex buildings conditions
    in Understanding the Cost of LEED-NC Project Certification
    58 43 Alejandro Matos
    LEED-AP
    ADDS
    Tue, Jun 28, 2011
    Appeal Fees Up
    in Understanding the Cost of LEED-NC Project Certification
    58 43 Devon Bertram
    Sustainability Manager
    YR&G
    Fri, Sep 23, 2011
    Project Registration Fee - Non-member or USGBC Member
    in Understanding the Cost of LEED-NC Project Certification
    58 43 Kendal Neitzke
    LEED Administrator, LEED AP O&M, Assoc. AIA
    MSI General Corporation
    Wed, Oct 19, 2011
    RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    58 55 ZEB Tech singapore
    ESD Consultancy
    ZEB-Technology Pte Ltd
    Thu, Jul 29, 2010
    RE: Grey Water for Flushing
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    58 55 Jutta Berns-Mumbi
    principal
    ecocentric cc
    Tue, Aug 3, 2010
    RE: "Building Completed 1993 or Later" Tab on Graph
    in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
    58 55 Paul C
    Mon, Sep 20, 2010
    RE: Reused furniture works against you for MRc4?
    in CI 2009 MRc3.2: Materials Reuse—Furniture and Furnishings
    58 48 Susie Spivey-Tilson
    Project Management Sustainability Services
    CBRE
    Wed, Sep 1, 2010
    RE: Using the DOE CBECS Table
    in NC v2.2 EAc2: On-Site Renewable Energy
    58 31 Marcus Sheffer
    LEED Fellow
    7group
    Thu, Sep 16, 2010
    RE: Energy audits of current practices
    in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis
    58 36 Jenny Carney
    Principal
    YR&G
    Tue, Sep 7, 2010
    VOC limits
    in Schools IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems
    58 57 Sue Barnett
    Principal
    Sue Barnett Sustainable Design
    Tue, Aug 31, 2010
    RE: Two Surveys
    in EBOM 2009 IEQc2.1: Occupant Comfort—Occupant Survey
    58 34 Geoffrey Tomlinson
    Vaha Sustainable Energy
    Tue, Aug 10, 2010
    Owner as Cx Agent
    in NC v2.2 EAc3: Enhanced Commissioning
    58 43 Sue Barnett
    Principal
    Sue Barnett Sustainable Design
    Mon, Jun 20, 2011
    LEED AP as well as ehnanced CxA
    in NC v2.2 EAc3: Enhanced Commissioning
    58 43 Banafsheh Shobeiri
    Sustainable Engineering Group Leader
    Hyder Consulting Middle East
    Sun, Oct 23, 2011
    RE: What should USGBC do with the extra time to ensure success?
    in LEED 2012 Postponed to 2013, Renamed LEED v4
    58 28 Nick _
    Architect, LEED AP
    Tue, Jun 5, 2012
    Title Comments Most Recent Post
    Existing Imperviouness
    in CS 2009 SSc6.1: Stormwater Design—Quantity Control
    20 Markus Henning
    M.Eng Facility Management
    Alpha Energy & Environment
    Fri, Feb 10, 2012
    Evapotranspiration rate
    in CS 2009 WEc1: Water Efficient Landscaping
    37 M K
    Fri, Feb 10, 2012
    Ashrae 90.1 - Tradable Surfaces
    in CS 2009 EAp2: Minimum Energy Performance
    518 Angela Saggin
    Fri, Feb 10, 2012
    Commissioning firm instead of a specific person?
    in NC 2009 EAc3: Enhanced Commissioning
    172 Veronika Sundberg
    Environmental Engineer - Certification
    Skanska Sverige AB
    Fri, Feb 10, 2012
    Pressure Drop Adjustment when no HVAC has been designed
    in CS 2009 EAp2: Minimum Energy Performance
    518 Santiago Rodriguez
    Consultant
    REVITALIZA CONSULTORES
    Fri, Feb 10, 2012
    Team Members Blocked from accessing the Project
    in Owner team member and signatories
    12 Mairead Morrissey
    Principal Environmental Consultant
    AWN Consulting Ltd
    Fri, Feb 10, 2012
    SCS Gold Certificate
    in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
    10 Suzanne Allerton
    Architect
    W2A Design Group
    Thu, Feb 9, 2012
    ARI Certification for Japanese equipment in LEED-NC 2.2
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Mauricio Ramirez
    Thu, Feb 9, 2012
    Residential project
    in LEED Rating System Selection Q&A
    332 Emmanuel Pauwels
    Owner
    Green Living Projects s.l.
    Thu, Feb 9, 2012
    How to address the lighting in a train station?
    in NC v2.2 EAp2: Minimum Energy Performance
    175 Rosana Correa
    Director
    Casa do Futuro
    Thu, Feb 9, 2012
    Strategy changes after construction review
    in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
    334 Michael Smithing
    Director - Green Building Advisory
    Colliers International
    Thu, Feb 9, 2012
    Using the centerline as the "site boundary"
    in NC 2009 SSc8: Light Pollution Reduction
    397 Zachary Guren
    LEED AP BD+C
    Wed, Feb 8, 2012
    Addition to Hospital with Shared HW and CHW Plant
    in NC 2009 EAc1: Optimize Energy Performance
    821 David Weigel, PE
    Managing Member
    The Watt Doctors, LLC
    Wed, Feb 8, 2012
    Charging stations and Calgreen
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    213 deborah lucking
    Wed, Feb 8, 2012
    PEAK Transients--What makes for PEAK? Not TOTALLY Occupied?
    in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
    157 Brooks Critchfield
    Principal
    Open Field Designs, Inc.
    Wed, Feb 8, 2012
    Option 2 with exterior lights on motion sensors
    in EBOM 2009 SSc8: Light Pollution Reduction
    82 Melinda Shah
    Architect
    Schooley Caldwell Associates
    Wed, Feb 8, 2012
    LEED CI
    in International Projects - alternative compliance path
    117 MARIA GARCIA
    Wed, Feb 8, 2012
    Community Connectivity - Campus Services
    in NC 2009 SSc2: Development Density and Community Connectivity
    124 Shannon Terrell
    Sustainable Design Director
    Walter Robbs Callahan & Pierce Architects
    Wed, Feb 8, 2012
    IEQp1 required signatory
    in NC-2009 IEQp1: Minimum IAQ Performance
    467 Anne-Maria Vierinen
    Environmental Specialist, M.Sc (Tech.), LEED AP
    Vahanen Oy
    Wed, Feb 8, 2012
    EQp1
    in LEED for Healthcare forum - LEED-HC users welcome!
    116 James Chueh
    Wed, Feb 8, 2012

    Copyright 2013 – BuildingGreen, Inc.