LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: WC's in CS 2009 WEp1: Water Use Reduction—20% Reduction |
157 |
Jim Park Project Manager EAN Technology Wed, May 22, 2013 |
|
RE: Same firm as sub-contractor and CxA in NC 2009 EAc3: Enhanced Commissioning |
172 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
Park & Community Centers = Services? in Schools 2009 SSc2: Development Density and Community Connectivity |
7 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
RE: Streamlined Path in NC 2009 SSc7.2: Heat Island Effect—Roof |
164 |
Heather Holdridge Sustainability Coordinator Lake/Flato Architects Wed, May 22, 2013 |
|
Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
118 |
Adam Knoff Sustainability Project Manager Unico Properties Wed, May 22, 2013 |
|
RE: Exterior Envelope Commissioning in NC 2009 IDc1: Innovation in Design |
367 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Wed, May 22, 2013 |
|
RE: Exterior window shades controllability in Healthcare-v2009: Controllability of systems - lighting |
2 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Roofing Adhesives, Sealants & Mastics in Healthcare-v2009: Low-emitting materials |
3 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: Number of testing point in Healthcare-v2009: Construction IAQ management plan - before occupancy |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Wed, May 22, 2013 |
|
RE: List of approved LEED modeling Software in NC 2009 EAc1: Optimize Energy Performance |
819 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
RE: Recycled Soil and Aggregate in NC 2009 MRc4: Recycled Content |
265 |
Joel McCreary Principal McCreary/Snow Architects, PA Wed, May 22, 2013 |
|
RE: Flexible furniture layout in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
171 |
Larissa Oaks Specialist, LEED USGBC Wed, May 22, 2013 |
|
RE: Can after school care be included in Joint use facilities? in Schools SSc10: Joint Use of Facilities |
33 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 22, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
101 |
Rebecca Grant Dull Olson Weekes - IBI Group Architects, Inc. Wed, May 22, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Small Buildings are Ineligible? in Healthcare-v2009: Daylight and views - views |
15 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Apr 19, 2013 |
|
Residential Units requirements Ashrae 62.1 2004 in NC v2.2 EQp1: Minimum IAQ Performance |
45 |
Victor Avedano Principal JALRW Eng. Group Inc. Fri, Apr 19, 2013 |
|
RE: Laundry detergent in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials |
84 |
Patty Breech Sustainability Consultant UHG Consulting Thu, Apr 18, 2013 |
|
Waste water generation and treated water in CS 2009 WEc2: Innovative Wastewater Technologies |
14 |
Michael E. Edmonds-Bauer Edmonds International Thu, Apr 18, 2013 |
|
RE: Process Loads Description in CI 2009 EAc3: Measurement and Verification |
74 |
Marcus Sheffer LEED Fellow 7group Thu, Apr 18, 2013 |
|
RE: LEED Boundary in NC v2.2 SSc6.2: Stormwater Design—Quality Control |
21 |
Nadia Ayala Architect / LEED AP BD+C AMP Proyectos México Thu, Apr 18, 2013 |
|
RE: One stop with 6 different rutes - Expemplary Performance in CS 2009 SSc4.1: Alternative Transportation—Public Transportation Access |
14 |
Alicia Silva CEO Revitaliza consultores Thu, Apr 18, 2013 |
|
RE: Electric furniture in CI 2009 MRc5: Regional Materials |
75 |
Pat Jung Thu, Apr 18, 2013 |
|
Community Center on Park Land in NC 2009 SSc1: Site Selection |
56 |
Paula Jarrett Nasta CPZ Architects Wed, Apr 17, 2013 |
|
RE: Play ground equipment in Schools 2009 MRc4: Recycled Content |
21 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Apr 17, 2013 |
|
RE: Furniture salvaged from site=Regional Mat+diverted Const. Waste? in Schools 2009 MRc5: Regional Materials |
31 |
Tiffany Moore LEED Documentation Consultant Built Kansas City LLC Wed, Apr 17, 2013 |
|
RE: Heavy duty/industrial clothes washers in Pilot Credit 18: Appliance & Process Water Use Reduction |
25 |
Jennifer Knocha Assistant Mack-Cali Realty Corporation Wed, Apr 17, 2013 |
|
RE: Regional Priority SSc7.2 - Heat Island Roof in NC 2009 RPc1: Regional Priority |
18 |
Kristina Bach CORE Steward Cooper Carry Wed, Apr 17, 2013 |
|
RE: Skateboard Wall Panels in CI 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products |
41 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Apr 17, 2013 |
|
Campus setting uploading refrigerant data LEED letter template in NC 2009 EAp3: Fundamental Refrigerant Management |
34 |
John Covello LEED and Sustainability Manager Development Management Group Wed, Apr 17, 2013 |
|
RE: Who can be the CxA? in CS 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
49 |
Scott Bowman Principal - Corporate Sustainability Leader KJWW Engineering Consultants Tue, Apr 16, 2013 |
|
FSC Mix in Schools 2009 MRc7: Certified Wood |
7 |
Gabriela G Tue, Apr 16, 2013 |
|
RE: SSc6.2 form in CS-2009 SSc6.2: Stormwater Design—Quality Control |
13 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 16, 2013 |
|
RE: Shower Location Outside LEED Project Boundary in NC v2.2 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
50 |
E H Sustainability Architect Tue, Apr 16, 2013 |
|
RE: May 2011 Addenda - CFC Phaseout Plan in CI 2009 EAp3: Fundamental Refrigerant Management |
38 |
Dana Villeneuve Sustainable Design Consultant Architectural Energy Corporation Tue, Apr 16, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Questionnaire in needs to develop and adopt the standards for the green building construction field in Turkey |
1 |
Devran Bengü Architect SOYAK Construction CO. Fri, Nov 18, 2011 |
|
LEED GA help in Organisation registeration and LEED GA approves courses. |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Nov 17, 2011 |
|
RE: Cancellation due to inactivity in Upcoming LEED project |
5 |
Emily Catacchio Sustainability Specialist Wight and Company Tue, Nov 15, 2011 |
|
RE: residential or commercial in 6-story res building - residential or non-residential |
2 |
David Posada Sustainability Manager GBD Architects Mon, Nov 14, 2011 |
|
revising submission in Revising a credit that is marked "Anticipated" |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
MPRs in LEED Project Registration |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
response in Changing to a Muliple Building Registration |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
password in USGBC LEED EB:O&M 2009, EAp2 and EAc1 Case 2 Calculator - password for the cell F38 of the spreadsheet |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
owner required signatory in Help with PI Form - Tenant Fit-out |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
RE: New construction, catering facilities in What LEED rating system to use? |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
RE: Addenda changes and project schedules- compliance cut-off dates? in USGBC releases April 2010 LEED addenda – changes to rating systems, Reference Guides |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Nov 14, 2011 |
|
RE: Town House project LEED Certification in China in How to certify the Town House project under LEED rating system in China? |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
RE: Doesn't replace Standards 62.1 and 90.1 in Ashrae standard 189.1, Total building sustainability package |
5 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
using LEEDuser in the field in LEEDuser usage for field personnel |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
LEED and sterilization in Soil Sterilization |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
LEED international discussion in LEED international proyects |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
RE: LEED Healthcare Forum in LEED for Healthcare |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
GBCI policy on deferring appeal in Defer a Design Phase Appeal |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
LEED-ND forum in LEED for Neighborhood Development |
5 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Sun, Nov 13, 2011 |
|
RE: Download completed templates in LEED Online + Documentation |
5 |
Emily Catacchio Sustainability Specialist Wight and Company Fri, Nov 11, 2011 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
Calculations for SSc6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
106 | 116 |
Gregory Hurst Office Manager Robert Peccia & Associates Sun, Jan 10, 2010 |
|
Map of FSC Distributors in NC 2009 MRc7: Certified Wood |
106 | 239 |
Devon Bertram Sustainability Manager YR&G Wed, Jan 13, 2010 |
|
RE: Re-used wood in NC 2009 MRc7: Certified Wood |
104 | 239 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Jan 25, 2010 |
|
RE: RE: Circulation space, lobbies, reception, corridors? in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces |
103 | 42 |
Carlie Bullock-Jones, LEED Fellow Principal Ecoworks Studio Sun, Sep 12, 2010 |
|
SCAQMD - Concrete Curing within weatherproofing system. in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings |
102 | 78 |
lynne panagotopulos Mon, Sep 27, 2010 |
|
Exemplary Performance in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces |
102 | 42 |
Eric Claycamp Mon, Sep 13, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
99 | 43 |
Richard Walker Sr Vice President Transwestern Sustainability Services Thu, Apr 22, 2010 |
|
RE: Composite materials in NC v2.2 MRc4: Recycled Content |
98 | 138 |
Gary Ashford Architect Duket Architects Planners Mon, Sep 27, 2010 |
|
Documentation Tool Kit coming soon? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
96 | 37 |
Alison Y Rivenburgh Mon, Sep 27, 2010 |
|
RE: Zero Blowdown Technology for Cooling Towers - No Chemicals in EBOM 2009 WEc4: Cooling Tower Water Management |
96 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Sep 28, 2010 |
|
RE: 75% COMPLIANCE area in EBOM 2009 SSc7.2: Heat Island Reduction—Roof |
96 | 58 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Sep 10, 2010 |
|
RE: Circulation space, lobbies, reception, corridors? in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces |
96 | 42 |
Elicia Ratajczyk Fri, Sep 10, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
94 | 43 |
Jonathan Weiss Thu, May 6, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
94 | 43 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Sep 20, 2010 |
|
RE: leed pilot credits - we need your help! in Pilot Credit 10: Sustainable Wastewater Management |
93 | 33 |
M San Miguel Paulson Chief LEED Specialist Wulff Architects, Inc. Fri, Sep 24, 2010 |
|
RE: 100 year flood for project outside US? in NC 2009 SSc1: Site Selection |
93 | 56 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Tue, Sep 28, 2010 |
|
RE: Glare Control for CS project in CS 2009 IEQc8.1: Daylight and Views—Daylight |
92 | 57 |
Eddy Santosa Sustainable Design Coordinator HMC Architects Fri, Sep 24, 2010 |
|
Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
92 | 43 |
Omar Katanani Fri, Apr 16, 2010 |
|
RE: Zero Blowdown Technology for Cooling Towers - No Chemicals in EBOM 2009 WEc4: Cooling Tower Water Management |
91 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Sep 23, 2010 |
|
RE: Cost of LEED report - Internationl projects in Understanding the Cost of LEED-NC Project Certification |
91 | 43 |
Michael Smith Architect Zivic and Hudle Architects Mon, Sep 20, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
ENERGY MODELING in CS 2009 EAp2: Minimum Energy Performance |
518 |
RICARDO GUEMEZ DIAZ ENG IACSA Mon, Mar 25, 2013 |
|
LEED NC/Major Renovation or LEED CI? in LEED Rating System Selection Q&A |
331 |
Nicole Kimoto Mon, Mar 25, 2013 |
|
Residential Applications in NC 2009 IEQc6.1: Controllability of Systems—Lighting |
171 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Fri, Mar 22, 2013 |
|
Line between consumables and 'process' consumables in EBOM 2009 MRc1: Sustainable Purchasing—Ongoing Consumables |
77 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Mar 22, 2013 |
|
Does this credit apply for dorms? in NC v2.2 EQc7.1: Thermal Comfort—Design |
24 |
Marco Barrera Engineer FMS Engineering Fri, Mar 22, 2013 |
|
DCV in CS-2009 IEQp1: Minimum IAQ Performance |
90 |
Anil Bhari Min engineering inc Fri, Mar 22, 2013 |
|
Apportioning Rainwater between WEc1, WEc2 and WEc3 in NC 2009 WEc3: Water Use Reduction |
73 |
Lewis Hewton Fri, Mar 22, 2013 |
|
join LEEDuser in New for LEED need help |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
EAp2 forum in Appendix G and anair conditioned distribution center |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
EAp2 forum in Reference building for a dewatering facility |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
Wet mineral wool on spandrel in CI 2009 IEQc3.1: Construction IAQ Management Plan—During Construction |
17 |
Antonio Rodriguez LEED AP BD+C SYASA - México Thu, Mar 21, 2013 |
|
Man-made canal in NC v2.2 SSc1: Site Selection |
19 |
Ye Yao Engineer ARUP Thu, Mar 21, 2013 |
|
Dual Flow faucet in NC 2009 WEc3: Water Use Reduction |
73 |
Mariela Garate Clarke Architect Green Building Council Chile Wed, Mar 20, 2013 |
|
USGBC as Code Officials in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Hernando Miranda Owner Soltierra LLC Wed, Mar 20, 2013 |
|
Lease Agreement an option to comply with the credit requirements in PIf4: Schedule and Overview Documents |
39 |
Mary Ann Santos Wed, Mar 20, 2013 |
|
What's the surprise new MR option in LEED v4 all about? in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Mar 19, 2013 |
|
Is there no opportunity for ID pt for data sharing in CI retail in Retail–CI-v2009: Measurement and verification |
1 |
Valerie Molinski Sustainability Coordinator Vocon Tue, Mar 19, 2013 |
|
PC 26 Advanced Energy Metering - Feedback in Pilot Credit 26: Advanced Energy Metering |
17 |
SOFIA KESIDOU Mon, Mar 18, 2013 |
|
PC 25 Water Metering and Reporting - Feedback in Pilot Credit 25: Water Metering & Reporting |
8 |
SOFIA KESIDOU Mon, Mar 18, 2013 |
|
Clogging Issues with Low Flow Fixtures in NC 2009 WEp1: Water Use Reduction—20% Reduction |
406 |
Melissa Perry Director of Sustainable Operations Manfred Construction Fri, Mar 15, 2013 |
Copyright 2013 – BuildingGreen, Inc.