Welcome to LEEDuser

LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.

Browse for the Credit you need, or view all of the credits in each rating system:

  • LEED-NC: New Construction v2.2,
  • LEED-NC: New Construction v2009,
  • LEED-CS: Core and Shell v2009,
  • LEED-CI: Commercial Interiors v2009,
  • LEED-Schools v2009,
  • LEED-EBOM: Existing Buildings Operation and Maintenance v2009.
  • Discussion Forum

    There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.

    Title Comments Most Recent Post
    RE: Acoustics study
    in NC 2009 IDc1: Innovation in Design
    356 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sat, May 18, 2013
    SS1 Option 2 Path 11 With Tenant installing PV
    in CI 2009 SSc1: Site Selection
    159 Susan Di Giulio
    Project Manager
    Zinner Consultants
    Sat, May 18, 2013
    changing prerequisite completed forms
    in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
    8 Linda Francis
    President
    Francis Consulting
    Sat, May 18, 2013
    RE: Percantage Make-Up
    in Healthcare-v2009: Sustainably sourced materials and products
    5 BABAR MEHMOOD
    SAUD CONSULT
    Sat, May 18, 2013
    RE: Casework
    in NC 2009 MRc7: Certified Wood
    238 Jason Grant
    Principal
    Jason Grant Consulting
    Fri, May 17, 2013
    School addition - LEED Boundary
    in MPR3: Must use a reasonable site boundary
    96 padraic o connell
    Fri, May 17, 2013
    RE: Recycled Soil and Aggregate
    in NC 2009 MRc4: Recycled Content
    255 Lyle Axelarris
    Civil Engineer, LEED AP BD+C, O+M
    Design Alaska
    Fri, May 17, 2013
    RE: Good to know
    in The Hidden Beltway Lobbyists Who Shape Green Building Policy
    13 Paula Melton
    Managing Editor
    BuildingGreen, Inc.
    Fri, May 17, 2013
    RE: Building Envelope Commissioning LEED required test methodology
    in NC 2009 EAc3: Enhanced Commissioning
    169 Brett Farbstein
    Commissioning Engineer
    AKF Group
    Fri, May 17, 2013
    RE: Form Questions
    in Healthcare-v2009: Acoustic environment
    7 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    RE: Entry mat in vestibule w/ tile surround
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, May 17, 2013
    Canada-NC 1.0 -- EAc1
    in LEED Canada Forum
    14 Laura Long
    Project Manager
    NORR
    Fri, May 17, 2013
    RE: Meaning of "Ready to Use Products"
    in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
    333 Alicia Silva
    CEO
    Revitaliza consultores
    Fri, May 17, 2013
    CS - Residential Building
    in MPR6: Must commit to sharing whole-building energy and water usage data
    10 CRolim Engenharia
    Fri, May 17, 2013
    RE: LEV discounted parking
    in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    209 BABAR MEHMOOD
    SAUD CONSULT
    Fri, May 17, 2013
    Title Comments Most Recent Post
    Campus setting uploading refrigerant data LEED letter template
    in NC 2009 EAp3: Fundamental Refrigerant Management
    34 John Covello
    LEED and Sustainability Manager
    Development Management Group
    Wed, Apr 17, 2013
    RE: Confirmation from recycling companied
    in NC v2.2 MRc2: Construction Waste Management
    95 Sustainability Consultant
    LEED Consultant
    Wed, Apr 17, 2013
    RE: Who can be the CxA?
    in CS 2009 EAp1: Fundamental Commissioning of Building Energy Systems
    49 Scott Bowman
    Principal - Corporate Sustainability Leader
    KJWW Engineering Consultants
    Tue, Apr 16, 2013
    FSC Mix
    in Schools 2009 MRc7: Certified Wood
    7 Gabriela G
    Tue, Apr 16, 2013
    RE: SSc6.2 form
    in CS-2009 SSc6.2: Stormwater Design—Quality Control
    13 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Apr 16, 2013
    RE: Shower Location Outside LEED Project Boundary
    in NC v2.2 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
    50 E H
    Sustainability Architect
    Tue, Apr 16, 2013
    RE: May 2011 Addenda - CFC Phaseout Plan
    in CI 2009 EAp3: Fundamental Refrigerant Management
    38 Dana Villeneuve
    Sustainable Design Consultant
    Architectural Energy Corporation
    Tue, Apr 16, 2013
    RE: Recycling Design Guidelines for large projects
    in ND-v2009: Solid waste management infrastructure
    7 Eliot Allen
    AICP, LEED AP-ND, CNU-A
    Principal, Criterion Planners LEED Faculty, LP TAG
    Tue, Apr 16, 2013
    Non Potable Water Source Use
    in EBOM 2009 WEc4: Cooling Tower Water Management
    55 Rajesh Ghorla
    Mr
    First Green Consulting Pvt Ltd
    Tue, Apr 16, 2013
    RE: Ashpalt used in MRc4
    in NC v2.2 MRc4: Recycled Content
    138 Michelle Reott
    LEED AP BD+C, ID+C, Managing Principal
    Earthly Ideas LLC
    Mon, Apr 15, 2013
    RE: Tenant Lease Agreement-Glazed partitions as part of fit-out work
    in CS 2009 IEQc8.2: Daylight and Views—Views
    25 Todd Reed
    Daylight Designer
    7group
    Mon, Apr 15, 2013
    RE: Tenant Lease Agreement - Interior glare protection
    in CI 2009 IEQc8.1: Daylight and Views—Daylight
    110 Todd Reed
    Daylight Designer
    7group
    Mon, Apr 15, 2013
    Open bottom planters
    in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat
    79 Michael E. Edmonds-Bauer
    Edmonds International
    Sat, Apr 13, 2013
    Tenant Lease Agreement - Interior glare protection
    in CS 2009 IEQc8.1: Daylight and Views—Daylight
    57 Petr Vogel
    Specialist Consultant
    EkoWATT CZ
    Sat, Apr 13, 2013
    Current Regs?
    in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases
    4 Robert Millspaugh
    Fri, Apr 12, 2013
    RE: Heat Island Effect - Nonroof in a Zero-Lot Building
    in CS 2009 SSc7.1: Heat Island Effect—Nonroof
    42 Crissy Tsai
    Sustainability Coordinator
    Webcor Builders
    Fri, Apr 12, 2013
    RE: IEQc3.2 APPA audit compliance using ISO 90001
    in EBOM 2009 IEQc3.2: Green Cleaning—Custodial Effectiveness Assessment
    53 Gerrit-Jan Teunissen
    consultant
    TRAJECT
    Fri, Apr 12, 2013
    RE: IEQ Space Matrix Version Applicability
    in NC 2009 IEQc6.1: Controllability of Systems—Lighting
    169 Lauren Glasscock
    Sr. Sustainability Professional
    DNV KEMA Energy & Sustainability
    Fri, Apr 12, 2013
    Test
    in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
    51 Victor Avedano
    Principal
    JALRW Eng. Group Inc.
    Thu, Apr 11, 2013
    RE: Multiple CxAs?
    in CS 2009 EAc3: Enhanced Commissioning
    27 Susan Walter
    Sr Project Architect
    Wilmot/Sanz
    Thu, Apr 11, 2013
    Title Comments Most Recent Post
    LEED GA help
    in Organisation registeration and LEED GA approves courses.
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Nov 17, 2011
    RE: Cancellation due to inactivity
    in Upcoming LEED project
    5 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Tue, Nov 15, 2011
    RE: residential or commercial
    in 6-story res building - residential or non-residential
    2 David Posada
    Sustainability Manager
    GBD Architects
    Mon, Nov 14, 2011
    revising submission
    in Revising a credit that is marked "Anticipated"
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    MPRs
    in LEED Project Registration
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    response
    in Changing to a Muliple Building Registration
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    password
    in USGBC LEED EB:O&M 2009, EAp2 and EAc1 Case 2 Calculator - password for the cell F38 of the spreadsheet
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    owner required signatory
    in Help with PI Form - Tenant Fit-out
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    RE: New construction, catering facilities
    in What LEED rating system to use?
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    RE: Addenda changes and project schedules- compliance cut-off dates?
    in USGBC releases April 2010 LEED addenda – changes to rating systems, Reference Guides
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Nov 14, 2011
    RE: Town House project LEED Certification in China
    in How to certify the Town House project under LEED rating system in China?
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    RE: Doesn't replace Standards 62.1 and 90.1
    in Ashrae standard 189.1, Total building sustainability package
    5 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    using LEEDuser in the field
    in LEEDuser usage for field personnel
    2 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    LEED and sterilization
    in Soil Sterilization
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    LEED international discussion
    in LEED international proyects
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    RE: LEED Healthcare Forum
    in LEED for Healthcare
    3 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    GBCI policy on deferring appeal
    in Defer a Design Phase Appeal
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    LEED-ND forum
    in LEED for Neighborhood Development
    5 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Sun, Nov 13, 2011
    RE: Download completed templates
    in LEED Online + Documentation
    5 Emily Catacchio
    Sustainability Specialist
    Wight and Company
    Fri, Nov 11, 2011
    RE: Re: Is EBOM Cheaper than NC
    in Is EBOM cheaper than NC
    2 Eric Johnson
    Associate
    Gardiner & Theobald
    Fri, Nov 11, 2011
    Title Votes Comments Most Recent Post
    Calculations for SSc6.1
    in NC 2009 SSc6.1: Stormwater Design—Quantity Control
    106 111 Gregory Hurst
    Office Manager
    Robert Peccia & Associates
    Sun, Jan 10, 2010
    Map of FSC Distributors
    in NC 2009 MRc7: Certified Wood
    106 238 Devon Bertram
    Sustainability Manager
    YR&G
    Wed, Jan 13, 2010
    RE: Re-used wood
    in NC 2009 MRc7: Certified Wood
    104 238 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Jan 25, 2010
    RE: RE: Circulation space, lobbies, reception, corridors?
    in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces
    103 42 Carlie Bullock-Jones, LEED Fellow
    Principal
    Ecoworks Studio
    Sun, Sep 12, 2010
    Exemplary Performance
    in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces
    102 42 Eric Claycamp
    Mon, Sep 13, 2010
    SCAQMD - Concrete Curing within weatherproofing system.
    in NC v2.2 EQc4.2: Low-Emitting Materials—Paints and Coatings
    102 78 lynne panagotopulos
    Mon, Sep 27, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    99 43 Richard Walker
    Sr Vice President
    Transwestern Sustainability Services
    Thu, Apr 22, 2010
    RE: Composite materials
    in NC v2.2 MRc4: Recycled Content
    98 138 Gary Ashford
    Architect
    Duket Architects Planners
    Mon, Sep 27, 2010
    RE: Circulation space, lobbies, reception, corridors?
    in NC v2.2 EQc8.2: Daylight and Views—Views for 90% of Spaces
    96 42 Elicia Ratajczyk
    Fri, Sep 10, 2010
    RE: 75% COMPLIANCE area
    in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
    96 58 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Fri, Sep 10, 2010
    RE: Zero Blowdown Technology for Cooling Towers - No Chemicals
    in EBOM 2009 WEc4: Cooling Tower Water Management
    96 55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Sep 28, 2010
    Documentation Tool Kit coming soon?
    in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
    96 37 Alison Y Rivenburgh
    Mon, Sep 27, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    94 43 Jonathan Weiss
    Thu, May 6, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    94 43 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Sep 20, 2010
    RE: 100 year flood for project outside US?
    in NC 2009 SSc1: Site Selection
    93 56 Jean Marais
    b.i.g. Bechtold DesignBuilder Expert
    Tue, Sep 28, 2010
    RE: leed pilot credits - we need your help!
    in Pilot Credit 10: Sustainable Wastewater Management
    93 33 M San Miguel Paulson
    Chief LEED Specialist
    Wulff Architects, Inc.
    Fri, Sep 24, 2010
    Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    92 43 Omar Katanani
    Fri, Apr 16, 2010
    RE: Cost of LEED report - Internationl projects
    in Understanding the Cost of LEED-NC Project Certification
    91 43 Michael Smith
    Architect
    Zivic and Hudle Architects
    Mon, Sep 20, 2010
    RE: Zero Blowdown Technology for Cooling Towers - No Chemicals
    in EBOM 2009 WEc4: Cooling Tower Water Management
    91 55 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Sep 23, 2010
    Independent review of contractors submittals
    in NC v2.2 EAc3: Enhanced Commissioning
    90 43 Brian Farrelly
    Wed, Sep 8, 2010
    Title Comments Most Recent Post
    EAp2 forum
    in Appendix G and anair conditioned distribution center
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Mar 21, 2013
    EAp2 forum
    in Reference building for a dewatering facility
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Thu, Mar 21, 2013
    Wet mineral wool on spandrel
    in CI 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
    17 Antonio Rodriguez
    LEED AP BD+C
    SYASA - México
    Thu, Mar 21, 2013
    Man-made canal
    in NC v2.2 SSc1: Site Selection
    19 Ye Yao
    Engineer
    ARUP
    Thu, Mar 21, 2013
    Dual Flow faucet
    in NC 2009 WEc3: Water Use Reduction
    73 Mariela Garate Clarke
    Architect
    Green Building Council Chile
    Wed, Mar 20, 2013
    USGBC as Code Officials
    in USGBC Engages Chemical Supply Chain with New LEED v4 Option
    36 Hernando Miranda
    Owner
    Soltierra LLC
    Wed, Mar 20, 2013
    Lease Agreement an option to comply with the credit requirements
    in PIf4: Schedule and Overview Documents
    39 Mary Ann Santos
    Wed, Mar 20, 2013
    Exterior window shades controllability
    in Healthcare-v2009: Controllability of systems - lighting
    1 April Eisenhauer
    Mechanical Engineer
    ccrd
    Tue, Mar 19, 2013
    What's the surprise new MR option in LEED v4 all about?
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Tue, Mar 19, 2013
    Is there no opportunity for ID pt for data sharing in CI retail
    in Retail–CI-v2009: Measurement and verification
    1 Valerie Molinski
    Sustainability Coordinator
    Vocon
    Tue, Mar 19, 2013
    PC 26 Advanced Energy Metering - Feedback
    in Pilot Credit 26: Advanced Energy Metering
    17 SOFIA KESIDOU
    Mon, Mar 18, 2013
    PC 25 Water Metering and Reporting - Feedback
    in Pilot Credit 25: Water Metering & Reporting
    8 SOFIA KESIDOU
    Mon, Mar 18, 2013
    Clogging Issues with Low Flow Fixtures
    in NC 2009 WEp1: Water Use Reduction—20% Reduction
    406 Melissa Perry
    Director of Sustainable Operations
    Manfred Construction
    Fri, Mar 15, 2013
    WR p3 and EA p3 Building-Level Monitoring
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Timothy Nabholz
    Miljöcertifieringsingenior (Environmental Certification Engineer)
    Skanska
    Thu, Mar 14, 2013
    LEED v4 Sixth Public Comment
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    90 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Wed, Mar 13, 2013
    WR p3 and EA p3 Building-Level Monitoring
    in LEED v4 Public Comment Forum - LEED Takes a New Direction
    90 Timothy Nabholz
    Miljöcertifieringsingenior (Environmental Certification Engineer)
    Skanska
    Wed, Mar 13, 2013
    Lease Agreement an option to comply with the credit requirements
    in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
    44 Mary Ann Santos
    Tue, Mar 12, 2013
    Are Science Classrooms with no fume hood exempt?
    in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control
    28 Rebecca Grant
    Dull Olson Weekes - IBI Group Architects, Inc.
    Tue, Mar 12, 2013
    asbestos roof
    in Asbestos Roof
    1 Tristan Roberts
    LEED AP BD+C, Editorial Director – LEEDuser
    BuildingGreen, Inc.
    Mon, Mar 11, 2013
    MR Credits - Building product disclosure and optimization
    in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
    29 Melissa Wrolstad
    Mon, Mar 11, 2013

    Copyright 2013 – BuildingGreen, Inc.