LEEDuser helps you certify your building project through the following LEED rating systems with tips, checklists, sample documentation, forums, and more.
Browse for the Credit you need, or view all of the credits in each rating system:
There are discussions happening on pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion.
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
Surface finish on Concrete Yards slab pursuing SSc7.1 in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
164 |
Sean Hogan Mr. RKD Architects Fri, May 24, 2013 |
|
RE: No HVAC / Natural Ventilation - Unmet Hrs in NC 2009 EAp2: Minimum Energy Performance |
1,379 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
RE: Does casework count for MR4, MR5 and MR7? in Schools 2009 MRc7: Certified Wood |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Derek Sylvia Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Design Respons from GBCI C6.1 in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Michael DeVuono T&M Associates Fri, May 24, 2013 |
|
Surface finish on Concrete Yards slab pursuing SSc7.1 in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
164 |
Sean Hogan Mr. RKD Architects Fri, May 24, 2013 |
|
RE: No HVAC / Natural Ventilation - Unmet Hrs in NC 2009 EAp2: Minimum Energy Performance |
1,379 |
Jean Marais b.i.g. Bechtold DesignBuilder Expert Fri, May 24, 2013 |
|
RE: Correct FSC Claim in NC v2.2 MRc7: Certified Wood |
149 |
Jason Grant Principal Jason Grant Consulting Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
RE: Spray insulation in NC v2.2 EQc4.1: Low-Emitting Materials—Adhesives and Sealants |
128 |
Laurie Winter Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
RE: How to define vision glazing in NC 2009 IEQc8.2: Daylight and Views—Views |
248 |
Hernando Miranda Owner Soltierra LLC Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
RE: Zero-Waste Office as LEED CI ID Credit in CI 2009 IDc1: Innovation in Design |
120 |
Adam Knoff Sustainability Project Manager Unico Properties Thu, May 23, 2013 |
|
RE: Does casework count for MR4, MR5 and MR7? in Schools 2009 MRc7: Certified Wood |
8 |
Candace Small Thu, May 23, 2013 |
|
RE: Healthcare Prereq 1 Fixtures and Calcs in NC 2009 WEp1: Water Use Reduction—20% Reduction |
410 |
Derek Sylvia Thu, May 23, 2013 |
|
RE: Potential crossover credit from New Construction to Schools? in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
38 |
James Leonard via Buro Happold Thu, May 23, 2013 |
|
RE: MRc4 and MRc7 in NC 2009 MRc4: Recycled Content |
267 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, May 23, 2013 |
|
RE: Interior Places of Respite in Healthcare-v2009: Connection to the natural world - places of respite |
4 |
Candace Small Thu, May 23, 2013 |
|
RE: Core & Shell: Electricity Use in CS 2009 EAc6: Green Power |
42 |
Marcus Sheffer LEED Fellow 7group Thu, May 23, 2013 |
|
RE: Option 3 - Measurement in Schools 2009 IEQc8.1: Daylight and Views—Daylight |
106 |
Todd Reed Daylight Designer 7group Thu, May 23, 2013 |
|
RE: CalGreen and LEED Requirements for SSc4.3 in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles |
213 |
Michelle Reott LEED AP BD+C, ID+C, Managing Principal Earthly Ideas LLC Thu, May 23, 2013 |
|
RE: WC's in CS 2009 WEp1: Water Use Reduction—20% Reduction |
159 |
OSCAR DE LA RED LEED AP BD+C PROMEC Thu, May 23, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
RE: Resubmit After Dening in Review Appeal |
24 |
Jim Park Project Manager EAN Technology Thu, May 23, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
RE: Correction in The Hidden Beltway Lobbyists Who Shape Green Building Policy |
15 |
Peggy White White + GreenSpec Wed, May 22, 2013 |
|
RE: Regarding LEED certification for District Cooling Plant in New District Energy Guidance for LEED Released by USGBC |
45 |
Marcus Sheffer LEED Fellow 7group Wed, May 22, 2013 |
|
LEED EB:OM in Start a New LEED Discussion Topic |
11 |
Lennart Lifvenhjelm Vasakronan AB Wed, May 22, 2013 |
|
RE: v3 stormwater design vs v4 rainwater management in LEED v4 Public Comment Forum - LEED Takes a New Direction |
94 |
Theresa Backhus Sites Technical Specialist USGBC Tue, May 21, 2013 |
|
RE: MRc4 recycled content---recovered fiber in MR Credit 4- Recycled Content |
4 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 21, 2013 |
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: (Jacob) Calculating for Future Growth in Calculating FTEs |
135 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, May 14, 2013 |
|
RE: about that working group.... in USGBC Engages Chemical Supply Chain with New LEED v4 Option |
36 |
Marian Keeler Senior Associate Thornton Tomasetti / Simon & Associates Mon, May 13, 2013 |
|
RE: Cannot login to LEED Online.. in Living with LEED Online - quirks, bugs and hiccups |
103 |
Francisca Herrera Miranda & Nasi Mon, May 13, 2013 |
|
RE: V4 implementation and '09 phase out in Sixth Comment Period for LEED v4 Won't Delay Member Ballot |
29 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 10, 2013 |
|
RE: Master Site and different buidings certifications in New LEED Guidance for Campuses and Multiple Buildings |
318 |
Eric Anderson Technical Customer Service Specialist GBCI Fri, May 10, 2013 |
|
Tenant Sales or Lease Agreement in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement |
19 |
Julie Hendricks Director of EcoServices Kirksey Sun, May 5, 2013 |
|
RE: BD&C Exam Prep in Earn CEUs on LEEDuser—With Ease |
2 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 30, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: Can the Technical Controller on the project be the CxA as well? in NC 2009 EAc3: Enhanced Commissioning |
11 | 172 |
Chris Ladner Partner Viridian Mon, May 21, 2012 |
|
Commissioning of plumbing fixtures when no hot water in NC 2009 EAc3: Enhanced Commissioning |
11 | 172 |
Emmanuel Pauwels Owner Green Living Projects s.l. Fri, Aug 17, 2012 |
|
RE: Combination of Steep-Slope and Low-Slope Roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Apr 20, 2010 |
|
RE: Alternative Color to White Roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
David Koons LEED AP BD & C NTD Architecture Wed, Apr 21, 2010 |
|
RE: Is it a roof-2? in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, May 3, 2010 |
|
RE: Is it a roof-1? in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Mara Baum Healthcare Sustainable Design Leader HOK Thu, May 6, 2010 |
|
ASTM E 1980 in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
gustavo goldman Mon, May 17, 2010 |
|
RE: SRI value for an existing copper roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Robert Hink Principal, LEED Faculty The Spinnaker Group Wed, Oct 13, 2010 |
|
RE: Is it a roof-1? in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Norma Rosowski Sustainability Consultant The Beck Group Mon, Jan 31, 2011 |
|
RE: Is it a roof-1? in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Mara Baum Healthcare Sustainable Design Leader HOK Wed, Feb 9, 2011 |
|
SSc7.2 Heat Island Effect, Roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Francisco Villela Project Manager Marcatects Tue, Feb 28, 2012 |
|
RE: SSc7.2 Heat Island Effect, Roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Susann Geithner Director of Sustainability HSB Architects & Engineers Wed, Mar 14, 2012 |
|
RE: SSc7.2 Heat Island Effect, Roof in NC 2009 SSc7.2: Heat Island Effect—Roof |
11 | 164 |
Francisco Villela Project Manager Marcatects Mon, May 21, 2012 |
|
RE: ID Exemplary performance in NC 2009 IDc1: Innovation in Design |
11 | 367 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jul 4, 2012 |
|
Educational program- Case study? in NC 2009 IDc1: Innovation in Design |
11 | 367 |
Diaa Madkour Architect Mon, Jul 16, 2012 |
|
EAp2 vs EAc1 in NC 2009 EAc1: Optimize Energy Performance |
11 | 819 |
Thiago Bondini Sat, Feb 6, 2010 |
|
RE: EAp2 vs EAc1 in NC 2009 EAc1: Optimize Energy Performance |
11 | 819 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Mon, Feb 8, 2010 |
|
RE: EAc1 Combined Heat & Power / Cogeneration in NC 2009 EAc1: Optimize Energy Performance |
11 | 819 |
Christopher Schaffner Principal & Founder The Green Engineer, LLP Mon, Feb 8, 2010 |
|
eQuest energy modelling in NC 2009 EAc1: Optimize Energy Performance |
11 | 819 |
Fabio Frescia Sustainable Engineer Mon, Feb 8, 2010 |
|
RE: eQuest energy modelling in NC 2009 EAc1: Optimize Energy Performance |
11 | 819 |
Dan Prows Wed, Feb 10, 2010 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Within Boundary-Consider only 1 service&shud be open to public? in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Muna Akheel Fri, May 24, 2013 |
|
Surface finish on Concrete Yards slab pursuing SSc7.1 in NC 2009 SSc7.1: Heat Island Effect—Nonroof |
164 |
Sean Hogan Mr. RKD Architects Fri, May 24, 2013 |
|
Parking space separate problem in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity |
194 |
Nan ZHANG Thu, May 23, 2013 |
|
HCFC123 or HFC410A in NC 2009 EAp3: Fundamental Refrigerant Management |
35 |
edward deschapell Facility Manager Airbus North America Thu, May 23, 2013 |
|
3 month performance period vs. Construction in Performance Period |
42 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 23, 2013 |
|
Landscape not performing well (post certification) in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping |
77 |
Jill Tomczyk Thu, May 23, 2013 |
|
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll) in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management |
37 |
Michelle Bracewell-Musson Owner, LEED AP Musson General Contracting & Green Expectations Sustainability Solutions Thu, May 23, 2013 |
|
last minute in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs |
43 |
Bill Swanson PE, LEED AP Integrated Architecture Thu, May 23, 2013 |
|
No file uploads? in NC 2009 SSc6.1: Stormwater Design—Quantity Control |
119 |
Carly Ruggieri Senior Sustainability Consultant Steven Winter Associates, Inc. Thu, May 23, 2013 |
|
SSc4 Alternate Commuting Transportation - survey question in Doing the Alternative Commuting Transportation Survey |
9 |
Heather Reiners MetroPool Inc. Thu, May 23, 2013 |
|
Change in Owner signature in Required Signatories in LEED Online Forms |
44 |
Green Domus Green Domus Thu, May 23, 2013 |
|
Can't select "other" in space usage type drop down in Filling out Space Usage Type |
18 |
Shivani Langer Architect SHW Group Thu, May 23, 2013 |
|
LEED Healthcare Certification Level Costs and Challenges in LEED Rating System Selection Q&A |
332 |
Arpan Bakshi Thu, May 23, 2013 |
|
Still a Pilot Credit? in Pilot Credit 7: Light Pollution Reduction |
24 |
Caroline Hedin Wed, May 22, 2013 |
|
Help, please in International Projects - alternative compliance path |
117 |
Stefanie Hoffmann HAAGA HELIA OY Ab Wed, May 22, 2013 |
|
Street trees in Pilot Credit 14: Walkable Streets |
46 |
Roland Le Roux Green Building Consultant Wed, May 22, 2013 |
|
Golf Courses in NC 2009 SSc2: Development Density and Community Connectivity |
121 |
Jennifer Berthelot-Jelovic President & CEO A SustainAble Production Wed, May 22, 2013 |
|
sealant applied to clearance between double glazing in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
porous or non-porous material in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants |
287 |
Noriko Yasuhara CSR Design & Landscape Co., Ltd. Tue, May 21, 2013 |
|
Just joined in with LEED in NC v2.2 EQc6.1: Controllability of Systems—Lighting |
42 |
alex songs Tue, May 21, 2013 |
Copyright 2013 – BuildingGreen, Inc.