Log in

Action Steps

You must use an Alternative Compliance Path to document savings from a non-potable source in LEED Online. Adjust the design case total water use volume to account for the annual amount of non‐potable water. Then use the adjusted design case total water us

You must use an Alternative Compliance Path to document savings from a non-potable source in LEED Online. Adjust the design case total water use volume to account for the annual amount of non‐potable water. Then use the adjusted design case total water use to recalculate the percent reduction of water use for all fixtures. Additional documentation or calculations may include but are not limited to plumbing drawings, calculations and system capacity to support quantities provided, and any analysis to confirm the availability of the non‐potable water source.

Dedicated bike lanes need to have sufficient width. Project experience has shown the following to be good guideline.: A dedicated bike lane along a roadway must be physically marked or separated from vehicular traffic. Sidewalks are acceptable if they mee

Dedicated bike lanes need to have sufficient width. Project experience has shown the following to be good guideline.: A dedicated bike lane along a roadway must be physically marked or separated from vehicular traffic. Sidewalks are acceptable if they meet the width requirements for a shared bicycle pedestrian lane. Sample width requirements established by AASHTO (American Association of State Highway & Transportation Officials) are: