-
More fresh air means healthier buildings
More fresh air means healthier buildings. Building on IEQp1: Minimum Indoor Air Quality Performance, this credit calls for exceeding by 30% the minimum outside air requirements set by ASHRAE 62.1-2007. Our indoor environments are burdened by carbon dioxide produced by occupants and by off-gassing of construction materials and furnishings. These conditions can cause fatigue and contribute to occupant health problems. Increased ventilation is one way to mitigate these problems.
There may be some tradeoffs
Your mechanical system may already be designed to accommodate increased ventilation, but in other cases, this credit may represent a tradeoff in energy consumption (conditioning more air along with increased fan power to distribute it), and may reduce...
Step-by-step credit help
Got the gist of the LEED credit but not sure how to actually achieve it? LEEDuser gives step-by-step help. Members get:
- Checklists covering all the key action steps you'll need to earn the credit.
- Hot tips to give you shortcuts and avoid pitfalls.
- Cost tips to assess what a credit will actually cost, and how to make it affordable.
- Ideas for going beyond LEED with best practices.
- All checklists organized by project phase.
- On-the-fly suggestions on useful items from the Documentation Toolkit, Resources, and Credit Language.
-
Credit language straight from USGBC
Need to check up on the exact LEED credit language from the LEED Rating System on the fly? LEEDuser includes the verbatim language. Members get:
- Easy access to the official LEED credit language with just a couple of clicks.
- On the jobsite without your bulky LEED Reference Guide? Check up on the credit language details here.
- Credit language content is used by permission of the U.S. Green Building Council.
Your credit-by-credit reference library
Why waste time chasing down referenced standards and supporting resources when LEEDuser links you directly to the ones you need? LEEDuser has gathered all the best tools out there and organized them by credit for easy reference. Members get links to:
- Organizations that can give information or help on a credit.
- Standards or studies that are key reference points for credits and prerequisites.
- Articles that help explain important topics.
- Key documents or references for credit inputs.
- Software tools you can use to run calculations or simulations.
Documentation Toolkit
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.
Sign in for complete access
Not a member yet? LEEDuser membership gives you access to all credit tips, checklists, documentation samples, and more.
Monthly Individual Membership (auto-renews):
Access to all content, cancel anytime—$9.95/month
Annual Individual Membership (auto-renews):
Access to all content, cancel anytime—$99.95/year
Annual Team Membership:
Access for up to 10 members—$349.95/year





2 Comments
Increase Ventilation - Corridor
Hi,
we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor. the corridor is a simple walkway for employees walk over to a customer lounge to meet up with client. the corridor is just 15 feet long. do i need to ensure this particular corridor have sufficient OA as to achieve this credit requirement.? the lobby or customer lounge connected by the walk way has sufficient OA (with a dedicated FCU serving this area) but by adding in the corridor SF, the whole required CFM increase. Please advice.
I've included corridors within the "office space" designation in my ventilation calculations. We may not be specifically supplying air to every corridor however we have accounted for the floor area within the ventilation calc.
the LEED reviewers have not flagged me . . .yet
Please register to use the forum.