Log in
LEED v2008
Homes
Materials and Resources
Waste management

LEED CREDIT

Homes-v2008 MRc3: Waste management .5-3 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

3.1 Construction waste management planning. Complete the following tasks related to management of construction waste:
  1. Investigate and document local options for diversion (e.g., recycling, reuse) of all anticipated major constituents of the project waste stream, including cardboard packaging and household recyclables (e.g., beverage containers).
  2. Document the diversion rate for construction waste. Record the diversion rate for land clearing and/or demolition, if applicable (e.g., on gut rehab project), separately from the rate for the new construction phase of the project.
class=”lowercase_letter”>

Credits

3.2 Construction waste reduction (maximum 3 points). Reduce or divert waste generated from new construction activities from landfills and incinerators to a level below the industry norm. Use either of two options:a) Reduced construction waste. Generate 2.5 pounds (or 0.016 cubic yards) or less of net waste (not including waste diverted for reclamation or recycling) per square foot of building floor area. Use column 1 or 2 and column 5 of Table 1 to determine the score.2b) Increased waste diversion. Divert 25% or more of the total materials taken off the construction site from landfills and incinerators. Use column 3 or 4 and column 5 of Table 1 to determine the score; calculate the percentage using either weight or volume. Note: Land clearing and demolition waste (e.g., from removal of preexisting structures on the site) should not be counted in this calculation.
Table 1. Waste Diversion

Amount to landfills and incinerators

Points

Reduced construction waste

Increased waste diversion

Pounds / ft2

Cubic yards / 1,000 ft2

Percentage waste

Percentage diverted

4.0

25.5

100%

0%

0.0

3.5

22.3

88%

13%

0.0

3.0

19.1

75%

25%

0.5

2.5

15.9

63%

38%

1.0

2.0

12.8

50%

50%

1.5

1.5

9.6

38%

63%

2.0

1.0

6.4

25%

75%

2.5

0.5

3.2

13%

88%

3.0

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

3.1 Construction waste management planning. Complete the following tasks related to management of construction waste:
  1. Investigate and document local options for diversion (e.g., recycling, reuse) of all anticipated major constituents of the project waste stream, including cardboard packaging and household recyclables (e.g., beverage containers).
  2. Document the diversion rate for construction waste. Record the diversion rate for land clearing and/or demolition, if applicable (e.g., on gut rehab project), separately from the rate for the new construction phase of the project.
class=”lowercase_letter”>

Credits

3.2 Construction waste reduction (maximum 3 points). Reduce or divert waste generated from new construction activities from landfills and incinerators to a level below the industry norm. Use either of two options:a) Reduced construction waste. Generate 2.5 pounds (or 0.016 cubic yards) or less of net waste (not including waste diverted for reclamation or recycling) per square foot of building floor area. Use column 1 or 2 and column 5 of Table 1 to determine the score.2b) Increased waste diversion. Divert 25% or more of the total materials taken off the construction site from landfills and incinerators. Use column 3 or 4 and column 5 of Table 1 to determine the score; calculate the percentage using either weight or volume. Note: Land clearing and demolition waste (e.g., from removal of preexisting structures on the site) should not be counted in this calculation.
Table 1. Waste Diversion

Amount to landfills and incinerators

Points

Reduced construction waste

Increased waste diversion

Pounds / ft2

Cubic yards / 1,000 ft2

Percentage waste

Percentage diverted

4.0

25.5

100%

0%

0.0

3.5

22.3

88%

13%

0.0

3.0

19.1

75%

25%

0.5

2.5

15.9

63%

38%

1.0

2.0

12.8

50%

50%

1.5

1.5

9.6

38%

63%

2.0

1.0

6.4

25%

75%

2.5

0.5

3.2

13%

88%

3.0

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Homes-v2008 MRc3