  • SS Prerequisite 1: Construction activity pollution prevention

    Intent

    To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust.

    Requirements

    Stockpile and protect disturbed topsoil from erosion (for reuse).

    Control the path and velocity of runoff with silt fencing or comparable measures.

    Protect on-site storm sewer inlets, streams, and lakes with straw bales, silt fencing, silt sacks, rock filters, or comparable measures.

    Provide swales to divert surface water from hillsides.

    Use tiers, erosion blankets, compost blankets, filter socks, berms, or comparable measures to stabilize soils in any area with a slope of 15% (6.6:1) or more that is disturbed during construction.

    Prevent air pollution from dust and particulate matter.

    Construction sites larger than 1 acre must conform to the erosion and sedimentation requirements of the 2012 U.S. Environmental Protection Agency Construction General PermitEPA's Construction General Permit. Outlines the provisions necessary to comply with Phase I and Phase II of the National Pollutant Discharge Elimination System (NPDES) program. or local equivalent, whichever are more stringent.

0 Comments

Start a new LEED comment thread

Feb 25 2017
Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.

Copyright 2017 – BuildingGreen, Inc.