ND-v4 NPDc7: Transit facilities 1 point

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Work with the transit agency or agencies serving the project to inventory existing transit stops and new transit stops within the project boundary that will be warranted within two years of project completion (because of either increased ridership on existing service or planned transit). At those locations,

  1. Confirm that transit facilities will be funded by either the transit agency or the project developer.
  2. Install transit agency-approved shelters and any other required improvements at existing stops. Reserve space for transit facilities or install transit facilities at new stops.
Shelters must be covered, be at least partially enclosed to buffer wind and rain, have seating and illumination, and have signage that display transit schedules and route information. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Work with the transit agency or agencies serving the project to inventory existing transit stops and new transit stops within the project boundary that will be warranted within two years of project completion (because of either increased ridership on existing service or planned transit). At those locations,

  1. Confirm that transit facilities will be funded by either the transit agency or the project developer.
  2. Install transit agency-approved shelters and any other required improvements at existing stops. Reserve space for transit facilities or install transit facilities at new stops.
Shelters must be covered, be at least partially enclosed to buffer wind and rain, have seating and illumination, and have signage that display transit schedules and route information.