Retail–NC-v2009 IPpc88: LEED O+M Starter Kit

  • Streamline entry to EBOM

    This pilot credit is a collection of Pilot Credits that BD+C projects can use in the Innovation in Design credit category for early pre‐approval of O+M prerequisites, streamlining the path into certification in LEED v4 for Operations + Maintenance.

  • USGBC

    Excerpted from LEED 2009 for Retail: New Construction and Major Renovations

    IP Pilot Credit 88: LEED O+M Starter Kit

    Intent

    Pilot Credit Closed - Innovation Catalog Version Available

    The O+M Starter Kit pilot credit was closed on 8/16/2016, however, a modified version is available in the Innovation Catalog.

    Requirements

    Pilot Credit 88: LEED O+M Starter Kit is a collection of Pilot Credits that BD+C projects can use in the Innovation in Design credit category for early pre‐approval of O+M prerequisites, streamlining the path into certification in LEED v4 for Operations + Maintenance.


    Site Management Policy

    Systems O+M Plan

    Purchasing, Waste and Renovation Policies

    Green CleaningGreen cleaning is the use of cleaning products and practices that have lower environmental impacts and more positive indoor air quality impacts than conventional products and practices. Policy and IPMIntegrated pest management (IPM) is the coordinated use of knowledge about pests, the environment, and pest prevention and control methods to minimize pest infestation and damage by the most economical means while minimizing hazards to people, property, and the environment. Plan






    Prerequisites and credits in the O+M rating system are divided between Establishment and Performance requirements. Establishment requirements are physical assets and policies that can be documented and approved once, and do not generally change substantially over time. Performance requirements involve cyclical actions or ongoing tracking during the Performance Period. Many of the Establishment requirements are included in the BD+C rating systems. The O+M Starter Kit consists of the remaining Establishment policy requirements that are not in the BD+C rating systems.

    Stipulations:
    1. All versions and adaptations of BD+C rating systems may use the Starter Kit with the following caveats:

      1. Core & Shell projects must provide evidence that the credits have been developed with the participation of the property management team that will be responsible for their implementation.
      2. BD+C v4 projects cannot use the Systems O+M Manual credit because these requirements are already included in those rating systems.
    2. Teams can use any number of these Pilot Credits, in any number of ID credit slots not to exceed the number of Pilot Credits attempted. (All four can be submitted within one ID credit or each can be submitted in a separate ID credit.)
    3. v3 teams may continue to use similar, previously allowed strategies for ID credits, but streamlined approval in an eventual O+M certification will only be allowed if these Pilot Credits are used.

    General Pilot Documentation Requirements

    Register for the pilot credit

    Credits 1-14

    Credits 15-27

    Credits 28-42

    Credits 43-56

    Credits 57-67

    Credits 68-82

    Credits 83-103

    Documentation

    • See O+M Starter Kit Document for documentation requirements on each credit.
    • See the resources tab for policy documents
    • All documentation for this credit must be translated into English

0 Comments

Start a new LEED comment thread

Feb 26 2017
Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.

Copyright 2017 – BuildingGreen, Inc.