Log in
Forum
Topic

SSc Enahnced resilient site design

LEED v5 BD+C/ID+C: Sustainable Sites Public Comments
posted by Emily Purcell on Apr 23, 2024, 11:55 am

I like the overall...

Recycling Building Products

CS-v4 MRc5: Construction and demolition waste management
posted by Ciaran McCabe on Oct 7, 2019, 5:07 pm

Hi, if existing building materials, such as concrete as an example, is removed from site during demolition, is there benefits if this was processed offsite and reused in there of gravel for the...

Last reply: Catarina Costa Goncalves, Apr 23, 2024, 11:47 am

PC44- where is the "Pilot Credit Feedback Survey"?

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Leticia SooHoo on Mar 29, 2019, 12:53 am

Our project is pursuing LEED v4 EQ44 -

'Provide the registration confirmation email for the Pilot Credit from USGBC and the email confirming completion of the Pilot Credit Feedback Survey...

Last reply: Kristi Ennis, Apr 23, 2024, 10:35 am

Innovation and Pilot credit clarification on Cleaning Policy

Retail-CI-v4 INc1: Innovation
posted by Toshif Ruikar on Sep 22, 2020, 5:56 am

Hi,

Can I use green cleaning policy as a innovation in one of our LEED ID+C retail project, as i am already applying for Pilot-Credits INpc137: Safety First: Cleaning and Disinfecting...

Last reply: Jonathan Burgess, Apr 23, 2024, 9:06 am

Low emitting materials- insulation category.

NC-v4 EQc2: Low-emitting materials
posted by Keith Robertson on Feb 22, 2019, 1:54 pm

comments Mark Andrews LEEDuser Basic Member April 23, 2024- 4:00 am According to the LEED user forum post, LEED v4.1 defines low-emitting materials for insulation to include a broad range of insulation...

Last reply: Mark Andrews, Apr 23, 2024, 4:00 am

EA Credit: GHG Emissions Reduction

LEED v5 O&M Existing Buildings Public Comments
posted by James Lee on Apr 23, 2024, 12:15 am

This credit provides 3 options to achieve a total of 12 points for...

Native plants = No Irrigation Required?

NC-v4 WEc1: Outdoor water use reduction
posted by Yoyo Shek on Jan 24, 2022, 6:40 am

Hi All,

Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:

A landscaping plan showing native plants may be provided to confirm that irrigation will not...

Last reply: emily reese moody, Apr 22, 2024, 9:42 pm

Should the soil be previously disturbed, before the owner starts to do anything with it?

CS-v4 SSc2: Site development - protect or restore habitat
posted by Marine Petrosyan on Oct 4, 2023, 3:17 am

Hi, All!

The Site Development - Protect or Restore Habitat credit requires, that the calculations are done with the previously disturbed land.

I am planning to calculate the area of...

Last reply: Afogreen Build, Apr 22, 2024, 9:02 pm

Option 1: General Contractor, (and? or?) Subcontractor and Trades

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Vanessa Hostick on Apr 22, 2024, 6:36 pm

In reviewing the language for Option 1 item 2, it is not clear if this language applies to all trades under the construction contract. I typically work on large projects where the general...

Comments- per IFMA

LEED v5 O&M Existing Buildings Public Comments
posted by Josh McIlwain on Apr 22, 2024, 4:01 pm

Comment 1: Location and Transportation (LT) – Public Comment Draft, Page 10 Granted a maximum of 10 points, this credit category is overweight, given that an existing building has no control over...