Topic | Recent |
---|---|
WEp1_manual wateringNC-v4 WEp1: Outdoor water use reductionposted by ed HvacSimulator on Apr 29, 2022, 3:27 am
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water... Last reply: Santiago Avila, Mar 19, 2024, 5:32 am |
|
"7% for green vehicles "NC-v4 LTc8: Green vehiclesposted by Santiago Avila on Mar 18, 2024, 10:53 am
"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for... Last reply: Santiago Avila, Mar 19, 2024, 5:21 am |
|
No More Strigent ThanNC-v4 EQp2: Environmental tobacco smoke controlposted by Hannah Fleck on May 11, 2017, 4:06 pm
Hello, Last reply: Afogreen Build, Mar 19, 2024, 5:18 am |
|
Commercial Kitchen QueryCI-v4 EAp2: Minimum Energy Performanceposted by padma priya on Mar 7, 2024, 6:30 am
In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. Last reply: Samuel Calhoun, Mar 18, 2024, 4:49 pm |
|
Building Product Disclosure and Optimization required documentationNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Marcelo Alencar Pereira on Mar 15, 2024, 10:49 am
Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If not... Last reply: Marcelo Alencar Pereira, Mar 18, 2024, 2:48 pm |
|
Peak Shaving StrategiesNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Mar 18, 2024, 1:06 pm
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model. I am wondering, if electric vehicle charging was 'locked out'... Last reply: Dave Hubka, Mar 18, 2024, 2:02 pm |
|
LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
Exceptional calculation method application.NC-2009 EAp2: Minimum Energy Performanceposted by FABIO VIERO on Jun 8, 2015, 4:07 am
Under ASHRAE 90.1 – G2.5, can we avoid to use a workaround to detail a HVAC system feature which could involve an energy saving, therefore avoid to do an exceptional calculation method, if we... Last reply: Farooq Saeed, Mar 18, 2024, 3:19 am |
|
Energy modeling for unconditioned human occupied spacesNC-2009 EAp2: Minimum Energy Performanceposted by Yusuf Turab on Jul 15, 2010, 4:02 pm
I recently attended a course on energy modeling using eQuest. I was puzzled by the response of the instructor when asked how can one model an office building that is completely unconditioned.... Last reply: Muhammad Farooq Saeed, Mar 17, 2024, 9:26 pm |
|
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?NC-v4 SSc2: Site development - protect or restore habitatposted by Kathy Wong on Apr 13, 2021, 6:18 am
Hi all, The credit requires 1) preserve 40% of the... Last reply: Afogreen Build, Mar 17, 2024, 9:12 pm |