Topic | Recent |
---|---|
Timeline to join for project teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Christoph Weindl on Sep 25, 2020, 11:27 am
We're pursuing "Social equity within the project team" with Option 2. Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years... Last reply: Robert Gomez, May 7, 2024, 7:52 pm |
|
SRI VALUE OF SOLAR ROOFNC-v4 SSc5: Heat Island Reductionposted by Shameen Dharmasena on Nov 4, 2021, 7:26 am
Hello, If a roof totally covered with Solar Panels, then how to calculate... Last reply: Talia Mamayek, May 7, 2024, 4:35 pm |
|
All Gender Restrooms- Conversations with Project TeamsPilot-Credits WEpc147: All-Gender Restroomsposted by Annalise Dum on Sep 29, 2022, 1:08 pm
What have teams found as successful ways to integrate all-gender restrooms into their projects? As a consultant, sometimes it is difficult to convince the client that individual occupant (and all... Last reply: Bethany Beers, May 7, 2024, 4:04 pm |
|
Energy and AtmosphereLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:18 pm
Add that if installing Battery Energy Storage systems this should be done in accordance with NFPA 855. |
|
Energy and AtmosphereLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:15 pm
Adding PV panels to an existing building can impact the fire performance of the existing roof... |
|
Enhanced Resilient site designLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 1:59 pm
I am thrilled to have wildfire part of this credit but the text provided is not very clear and also not up to date in some of its references. I suggest the following wording to make it more clear... |
|
Location and transportationLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:12 pm
Add the need for a fire safety review of charge points if these are within or directly adjacent to the building. |
|
Operational Planning and Response for ResilienceLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:10 pm
Missing that the emergency response plan should be communicated to the local fire department. |
|
Resilient spacesLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:05 pm
Add wildfires to the list in Option 5. |
|
Enhanced Building AccessibilityLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:03 pm
Would be great to add that emergency exits are designed to account for X number of people with physical disabilities. Often exit design has not taken this into account. It fits with the need for... |