LEEDuser Forum

The following discussions are happening right now all around our LEED credit forums. If you don't find what you're looking for below, check our LEED credit menu or the list of hot discussion topics to the right.

Title Comments Most Recent Post Location
RE: ID+C v4 - Existing Office Building: Lighitng & Envelope
in CI 2009 EAp2: Minimum Energy Performance
572 Marcus Sheffer
LEED Fellow
7group
Mon, May 1, 2017
Add row to purchasing calculator
in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods
96 Mihir Parikh
CB&I
Mon, May 1, 2017
RE: EA CR 02 - Qualified List
in NC 2009 EAc2: On-Site Renewable Energy
318 Marcus Sheffer
LEED Fellow
7group
Mon, May 1, 2017
Entryway Systems Location
in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control
468 Trina Hernandez
Architect
RSP
Sun, Apr 30, 2017
RE: How is it graduate?
in CS v4: Innovation
3 emily reese
Sustainability Consultant
Jacobs
Thu, Apr 27, 2017
RE: Increasing certification level after accepting certification?
in United States
2 Kristina Bach
Sustainability Specialist
HGA Architects and Engineers
Thu, Apr 27, 2017
RE: Basic Amenities Within the Main Building
in CI 2009 SSc2: Development Density and Community Connectivity
127 Garrett Ferguson
Sustainable Building Advisor, LEED AP BD+C
Perkins+Will
Thu, Apr 27, 2017
RE: Off-site Off-set Documentation Requirements
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
303 Amber Richane
Performance Driven Design Lead
CallisonRTKL
Thu, Apr 27, 2017
RE: GREEN POWER - WIND Mills
in NC-2009: Green power
2 SAMY Chamy
Enginneer
T&T Green
Thu, Apr 27, 2017
Conditions for site fence
in NC 2009 SSp1: Construction Activity Pollution Prevention
308 Julian Bork
Thu, Apr 27, 2017
Germany
RE: Occupancy from areas not in LEED scope
in PIf3: Occupant and Usage Data
32 David Lazaro
WSS REAL ESTATE
Thu, Apr 27, 2017
How to apply base ratios for non-specified usage type?
in CI-v4: Reduced parking footprint
13 Jonathan Weiss
Wed, Apr 26, 2017
United States
radius used for density calculations
in CI-v4: Surrounding density and diverse uses
4 emily reese
Sustainability Consultant
Jacobs
Wed, Apr 26, 2017
RE: Renewable Energy in CS project
in CI-v4: Renewable energy production
4 Meike Borchers
Technical Director
WSP UK
Wed, Apr 26, 2017
Sound Isolation ACP?
in NC-v4: Acoustic performance
22 Rita Haberman
Brightworks
Tue, Apr 25, 2017
TI scope vs. CS base building
in CI-v4: Acoustic performance
3 Michelle Rosenberger
Partner
ArchEcology, LLC
Tue, Apr 25, 2017
RE: Total Gross Area: does the roof area counts?
in PIf2: Project Summary Details
15 Carlos Echeverria
Architect
Studio Domus
Tue, Apr 25, 2017
RE: No Mow Grass
in Schools 2009 SSc5.1: Site Development—Protect or Restore Habitat
13 April Brown
Sustainable Building Consultant
Green Bridge Consulting
Tue, Apr 25, 2017
Samples from Stopwaste.org
in EBOM-v4: Interior lighting
7 Alexa Stone
ecoPreserve - Building Sustainbility
Tue, Apr 25, 2017
RE: Parking Pen
in ND-v4: Connected circulation network
14 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Apr 25, 2017
Title Comments Most Recent Post Location
TI scope vs. CS base building
in CI-v4: Acoustic performance
3 Michelle Rosenberger
Partner
ArchEcology, LLC
Tue, Apr 25, 2017
RE: Total Gross Area: does the roof area counts?
in PIf2: Project Summary Details
15 Carlos Echeverria
Architect
Studio Domus
Tue, Apr 25, 2017
RE: No Mow Grass
in Schools 2009 SSc5.1: Site Development—Protect or Restore Habitat
13 April Brown
Sustainable Building Consultant
Green Bridge Consulting
Tue, Apr 25, 2017
Samples from Stopwaste.org
in EBOM-v4: Interior lighting
7 Alexa Stone
ecoPreserve - Building Sustainbility
Tue, Apr 25, 2017
RE: Parking Pen
in ND-v4: Connected circulation network
14 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Apr 25, 2017
Water Pressure to Fixtures
in CS v4: Indoor water use reduction
4 Ciaran McCabe
METEC Consulting Engineers
Mon, Apr 24, 2017
Onsite solar PV generation - 10 years contract
in EBOM-v4: Renewable energy and carbon offsets
3 Ameet AA
Mon, Apr 24, 2017
Singapore
RE: Hotel Recycling Note
in NC 2009 MRp1: Storage and Collection of Recyclables
84 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Sat, Apr 22, 2017
RE: Third party in renewable energy
in NC-v4: Renewable energy production
28 Marcus Sheffer
LEED Fellow
7group
Fri, Apr 21, 2017
RE: Dry Air Cooler
in CS v4: Cooling tower water use
6 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Fri, Apr 21, 2017
RE: Anti Smoking Sign
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
334 James Bell
Senior Associate
Bohlin Cywinski Jackson
Fri, Apr 21, 2017
RE: Envelope CxA Requirements
in NC-v4: Fundamental commissioning and verification
33 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 21, 2017
RE: LEED ID&C EAc1.3
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
460 Marcus Sheffer
LEED Fellow
7group
Fri, Apr 21, 2017
Monitoring and Corrective action plan
in Pilot Credit 55: Bird Collision Deterrence
54 Luis Huertas
Project Manager
Sustainable Design Consulting
Fri, Apr 21, 2017
RE: Pilot credit Vs LEED V4
in Pilot Credit 63: Whole Building Life Cycle Assessment
22 Dirk Kestner
Principal
Walter P Moore
Thu, Apr 20, 2017
United States
April 2017 addenda
in NC-v4: Building product disclosure and optimization - material ingredients
46 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Tue, May 16, 2017
UCSB - Bren Hall
in Pilot Credit 96: LEED Lab
3 Brandon Kaysen
Sustainability Advisor
Healthy Buildings
Wed, Apr 19, 2017
United States
RE: System Furniture Include or Excluude?
in CI 2009 IEQc8.1: Daylight and Views—Daylight
147 Todd Reed
Daylight Designer
7group
Wed, Apr 19, 2017
RE: Bike stor. and shower facility sharing between NON LEED and LEED
in Schools 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
48 Marilyn Specht
Sustainability Consultant
Integral Group
Wed, Apr 19, 2017
LEED CI v4 in a CS V2009
in CI-v4: Integrative process
15 Gabriela Mena
Master in Science
IACSA
Wed, Apr 19, 2017
Mexico
Title Comments Most Recent Post Location
Grenada - by LEEDUser Team
Thu, Sep 18, 2014
Guatemala - by LEEDUser Team
Thu, Sep 18, 2014
Haiti - by LEEDUser Team
Thu, Sep 18, 2014
Honduras - by LEEDUser Team
Thu, Sep 18, 2014
Jamaica - by LEEDUser Team
Thu, Sep 18, 2014
Mexico - by LEEDUser Team
Thu, Sep 18, 2014
Hungary - by LEEDUser Team
Thu, Sep 18, 2014
Moldova - by LEEDUser Team
Thu, Sep 18, 2014
Poland - by LEEDUser Team
Thu, Sep 18, 2014
Romania - by LEEDUser Team
Thu, Sep 18, 2014
Slovakia - by LEEDUser Team
Thu, Sep 18, 2014
Ukraine - by LEEDUser Team
Thu, Sep 18, 2014
Antigua and Barbuda - by LEEDUser Team
Thu, Sep 18, 2014
Bahamas - by LEEDUser Team
Thu, Sep 18, 2014
Kazakhstan - by LEEDUser Team
Thu, Sep 18, 2014
Kyrgyzstan - by LEEDUser Team
Thu, Sep 18, 2014
Russian Federation - by LEEDUser Team
Thu, Sep 18, 2014
Tajikistan - by LEEDUser Team
Thu, Sep 18, 2014
Turkmenistan - by LEEDUser Team
Thu, Sep 18, 2014
Uzbekistan - by LEEDUser Team
Thu, Sep 18, 2014
Title Comments Most Recent Post Location
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Mon, Mar 27, 2017
United States
Customer Use of Restrooms
in Retail-CI-v4: Indoor water use reduction
7 Manuelle Croft
Les services exp
Mon, Mar 27, 2017
Canada
UL Product Lens - any USGBC issued acceptance/precedent?
in CI-v4: Building product disclosure and optimization - material ingredients
10 Joanna Switzer
Sustainability Project Manager
Atkins North America
Mon, Mar 27, 2017
United States
Entryway mats
in CS 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
94 Anna Korinkova
Fri, Mar 24, 2017
Czech Republic
Existing Building LEED certification through LEED ARC
in NC-v4: Must be in a permanent location on existing land
26 Subrota Roy
ECORAY Sustainability & Design
Fri, Mar 24, 2017
Scope
in CI-v4: Enhanced refrigerant management
3 Michael Smithing
Director - Green Building Advisory
Colliers International
Fri, Mar 24, 2017
April 2017 addenda
in NC-v4: Building product disclosure and optimization - material ingredients
46 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Thu, Mar 23, 2017
LIghts pointing upwards
in EBOM-v4: Light pollution reduction
7 David Lazaro
WSS REAL ESTATE
Thu, Mar 23, 2017
Spain
RE: LEED V4 -Healthcare Or NC
in LEED Rating System Selection
831 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Mar 22, 2017
hidden price on the invoice
in CS 2009 MRc6: Certified Wood
43 Agata Mozer
GO4IT SP Z OO SP K
Wed, Mar 22, 2017
Poland
Adjustable-height desktop
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
164 Simon S.
SL+A International, Taipei
Wed, Mar 22, 2017
Pre-Consumer Recycled Content
in EBOM-v4: Purchasing - ongoing
13 Claire Bannister
Tue, Mar 21, 2017
Canada
LEED CI v4 in a CS V2009
in CI-v4: Integrative process
15 Gabriela Mena
Master in Science
IACSA
Tue, Mar 21, 2017
Mexico
LEED HC 2009 - IEQc8.1 Daylight
in Healthcare-v2009: Daylight and views - daylight
1 Christie Morris-Withers
NIKA
Mon, Mar 20, 2017
United States
RE: DES with CHP, electric and absorption chillers and boilers
in NC 2009 EAc1: Optimize Energy Performance
1,344 Marcus Sheffer
LEED Fellow
7group
Mon, Mar 20, 2017
RE: DES with CHP, electric and absorption chillers and boilers
in NC 2009 EAc1: Optimize Energy Performance
1,344 Marcus Sheffer
LEED Fellow
7group
Mon, Mar 20, 2017
RE: DES with CHP, electric and absorption chillers and boilers
in NC 2009 EAc1: Optimize Energy Performance
1,344 Marcus Sheffer
LEED Fellow
7group
Mon, Mar 20, 2017
ESVE Requirement
in Pilot Credit 70: Green vehicles
15 Joshua Chia
IEN Consultants
Fri, Mar 17, 2017
Malaysia
RE: roller shades/blinds
in EBOM-v4: Purchasing - facility maintenance and renovation
9 Kimberly Schlaepfer
Sustainability Coordinator LEED AP O+M, BD+C
YR&G
Fri, Mar 17, 2017
electrical and plumbing in pre construction meeting
in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
291 filomena nigro
Thu, Mar 16, 2017
Title Comments Post date Most Recent Post Location
Option 1: Smart-Phone Control
in NC-v4: Interior lighting
47 Ian Robinson
Energy Engineer / Project Manager
RDK Engineers
Thu, Apr 13, 2017
2017-04-13 17:16 United States
Project size extended in the middle of construction
in NC-v4: Must comply with project size requirements
22 wachira sosaeng
Thu, Apr 13, 2017
2017-04-13 12:07 Thailand
>10% exemption possible?
in MPR2: Must be a complete, permanent building or space
2 Rasita Masalskyte
Ms
Vesta Consulting
Thu, Apr 13, 2017
2017-04-13 09:37 Lithuania
Baseline EER - System 2 PTHP
in NC 2009 EAp2: Minimum Energy Performance
4,008 Nikhil Kumar
Thu, Apr 13, 2017
2017-04-13 06:32 Saudi Arabia
Energy Modelling - Australia
in NC-v4: Minimum energy performance
200 Quentin Jackson
Sustainable Design Leader
Aurecon
Thu, Apr 13, 2017
2017-04-13 03:05 Australia
System 2 - LEED Fan Power ASHRAE 90.1.2007
in NC 2009 EAp2: Minimum Energy Performance
4,008 Nikhil Kumar
Thu, Apr 13, 2017
2017-04-13 02:07 Saudi Arabia
Partitioned office space clarification
in WELL Building Standard Discussion Forum
76 Carina Clark
Interior Designer
HKS
Wed, Apr 12, 2017
2017-04-12 18:36 United States
1-floor renovation in an 2009 EBOM Certified Building
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
528 John Krutko
Sr Project Manager
Osborn Engineering
Wed, Apr 12, 2017
2017-04-12 16:04 United States
Innovation credit on cultural preservation
in NC 2009 IDc1: Innovation in Design
638 Vanessa Poirier
architecture intern
EVOQ architecture
Wed, Apr 12, 2017
2017-04-12 15:08 Canada
definition of composite wood and tectum panels?
in NC-v4: Low emitting materials
332 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Wed, Apr 12, 2017
2017-04-12 15:06 United States
List of Green Cars?
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
508 Erin Holdenried
Sustainable Design Manager
AECOM
Wed, Apr 12, 2017
2017-04-12 10:26 United States
ID+C v4 - Existing Office Building: Lighitng & Envelope
in CI 2009 EAp2: Minimum Energy Performance
572 Marc Maso
Wed, Apr 12, 2017
2017-04-12 10:00 Spain
Non-composite wood with off-site applied coatings
in NC-v4: Low emitting materials
332 Ashley Hu
Jr. Sustainable Building Advisor
Tue, Apr 11, 2017
2017-04-11 20:07 Canada
A partial ceiling area was affected by mold
in Schools 2009 IEQc10: Mold Prevention
30 Diaa El-Masry
General Manager
Qatar Green Leaders
Tue, Apr 11, 2017
2017-04-11 12:19 Qatar
Free Address vs. Full Flexibility
in WELL Building Standard Discussion Forum
76 Carina Clark
Interior Designer
HKS
Tue, Apr 11, 2017
2017-04-11 09:52 United States
Vegetation under solar panels
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
303 Angelica Ospina Alvarado
Tue, Apr 11, 2017
2017-04-11 09:10 Colombia
Arc Platform
in Performance Period
58 Sarfaraj Khan
Commissioning & Sustainability Consultant
Green Consulting
Tue, Apr 11, 2017
2017-04-11 08:45 United Arab Emirates
Option 1 - Individual occupant spaces 3 level lighting
in NC-v4: Interior lighting
47 Mario S.
Tue, Apr 11, 2017
2017-04-11 08:07 United Arab Emirates
General Emissions Evaluation
in NC-v4: Low emitting materials
332 Joshua Chia
IEN Consultants
Tue, Apr 11, 2017
2017-04-11 07:28 Malaysia
Energy Star Protfolio Manager
in EBOM-v4: Minimum energy performance
53 Sarfaraj Khan
Commissioning & Sustainability Consultant
Green Consulting
Tue, Apr 11, 2017
2017-04-11 07:13 United Arab Emirates

Copyright 2017 – BuildingGreen, Inc.