LEEDuser Forum

The following discussions are happening right now all around our LEED credit forums. If you don't find what you're looking for below, check our LEED credit menu or the list of hot discussion topics to the right.

Title Comments Most Recent Post Location
New and Renovation: How to Determine Points from Table 1
in NC-v4: Optimize energy performance
42 James Keohane, PE LEED BD+C CxA CPMP
Sustainability and Commissioning Consultant
Sustainable Engineering Concepts, LLC
Thu, May 25, 2017
United States
RE: browser compatibility
in LEED Online Status Updates
80 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Thu, May 25, 2017
RE: Mixed Use Residential with C&S retail on ground floor
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
379 Erica Downs
Sustainability & LEED Consultant
Thu, May 25, 2017
RE: Core & Shell tenant retail space in mixed-use building
in NC-2009 IEQp1: Minimum IAQ Performance
1,090 Erica Downs
Sustainability & LEED Consultant
Thu, May 25, 2017
RE: Pending Systems for Commissioning
in NC 2009 EAp1: Fundamental Commissioning of Building Energy Systems
351 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Thu, May 25, 2017
RE: Daily Use of sink in Dorm Lobby
in NC 2009 WEp1: Water Use Reduction—20% Reduction
803 Meredith Elbaum
The Elbaum Group
Thu, May 25, 2017
RE: updated low-mercury lamps requirements
in NC 2009 IDc1: Innovation in Design
638 Michelle Rosenberger
Partner
ArchEcology, LLC
Thu, May 25, 2017
RE: Cx - Warranty Review After Building is Sold
in NC-2009 EAc3: Enhanced Commissioning
324 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Thu, May 25, 2017
Low Emitting Products
in Homes-v4: Low-emitting products
4 Jess Harris
Green Permitting Lead
City of Seattle
Thu, May 25, 2017
United States
Documentation for Material Reuse?
in NC-v4: Building product disclosure and optimization - sourcing of raw materials
104 Megan White
Sr. Sustainability Consultant
Integral Group
Thu, May 25, 2017
United States
RE: Canadian LEED market
in LEED Canada Forum
62 Guillaume Martel
LEED Project Manager
PROVENCHER ROY + ASSOCIÉS ARCHITECTES
Thu, May 25, 2017
Existing Building LEED certification through LEED ARC
in NC-v4: Must be in a permanent location on existing land
26 Subrota Roy
ECORAY Sustainability & Design
Thu, May 25, 2017
Access to quality transit
in NC-v4: Access to quality transit
43 Subrota Roy
ECORAY Sustainability & Design
Thu, May 25, 2017
Understanding the Cost of LEED-NC Project Certification
in Understanding the Cost of LEED-NC Project Certification
99 William Larsen
Thu, May 25, 2017
EPD for Products + installation Materials, all as one?
in CI-v4: Building product disclosure and optimization - environmental product declarations
29 leonard sciarra
architect
gensler
Wed, May 24, 2017
Demand Response on Campus applied to CI (2009) project?
in NC-v4: Demand response
19 Margaret Montgomery
Principal
NBBJ
Wed, May 24, 2017
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 24, 2017
United States
RE: DES with CHP, electric and absorption chillers and boilers
in NC 2009 EAc1: Optimize Energy Performance
1,344 Marcus Sheffer
LEED Fellow
7group
Wed, May 24, 2017
SSc5 Offsite Restoration Contract/Performance Period
in EBOM 2009 SSc5: Site Development—Protect or Restore Open Habitat
97 Randi Davis
Sr Program Manager
Wed, May 24, 2017
United States
RE: Section Table 1.4.2B- Fenestration
in Schools 2009 EAp2: Minimum Energy Performance
73 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Wed, May 24, 2017
Title Comments Most Recent Post Location
New and Renovation: How to Determine Points from Table 1
in NC-v4: Optimize energy performance
42 James Keohane, PE LEED BD+C CxA CPMP
Sustainability and Commissioning Consultant
Sustainable Engineering Concepts, LLC
Thu, May 25, 2017
United States
RE: Mixed Use Residential with C&S retail on ground floor
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
379 Erica Downs
Sustainability & LEED Consultant
Thu, May 25, 2017
RE: Core & Shell tenant retail space in mixed-use building
in NC-2009 IEQp1: Minimum IAQ Performance
1,090 Erica Downs
Sustainability & LEED Consultant
Thu, May 25, 2017
RE: Pending Systems for Commissioning
in NC 2009 EAp1: Fundamental Commissioning of Building Energy Systems
351 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Thu, May 25, 2017
RE: Daily Use of sink in Dorm Lobby
in NC 2009 WEp1: Water Use Reduction—20% Reduction
803 Meredith Elbaum
The Elbaum Group
Thu, May 25, 2017
RE: updated low-mercury lamps requirements
in NC 2009 IDc1: Innovation in Design
638 Michelle Rosenberger
Partner
ArchEcology, LLC
Thu, May 25, 2017
RE: Cx - Warranty Review After Building is Sold
in NC-2009 EAc3: Enhanced Commissioning
324 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Thu, May 25, 2017
Low Emitting Products
in Homes-v4: Low-emitting products
4 Jess Harris
Green Permitting Lead
City of Seattle
Thu, May 25, 2017
United States
Documentation for Material Reuse?
in NC-v4: Building product disclosure and optimization - sourcing of raw materials
104 Megan White
Sr. Sustainability Consultant
Integral Group
Thu, May 25, 2017
United States
Existing Building LEED certification through LEED ARC
in NC-v4: Must be in a permanent location on existing land
26 Subrota Roy
ECORAY Sustainability & Design
Thu, May 25, 2017
Access to quality transit
in NC-v4: Access to quality transit
43 Subrota Roy
ECORAY Sustainability & Design
Thu, May 25, 2017
EPD for Products + installation Materials, all as one?
in CI-v4: Building product disclosure and optimization - environmental product declarations
29 leonard sciarra
architect
gensler
Wed, May 24, 2017
Demand Response on Campus applied to CI (2009) project?
in NC-v4: Demand response
19 Margaret Montgomery
Principal
NBBJ
Wed, May 24, 2017
United States
Above ground-floor horizontal exterior spaces (plaza, roof)
in NC-v4: Light pollution reduction
81 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Wed, May 24, 2017
United States
RE: DES with CHP, electric and absorption chillers and boilers
in NC 2009 EAc1: Optimize Energy Performance
1,344 Marcus Sheffer
LEED Fellow
7group
Wed, May 24, 2017
SSc5 Offsite Restoration Contract/Performance Period
in EBOM 2009 SSc5: Site Development—Protect or Restore Open Habitat
97 Randi Davis
Sr Program Manager
Wed, May 24, 2017
United States
RE: Section Table 1.4.2B- Fenestration
in Schools 2009 EAp2: Minimum Energy Performance
73 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Wed, May 24, 2017
Multifamily Buildings
in EBOM-v4: Indoor water use reduction
25 Zachary Sherman
Energy Engineer
EN-POWER GROUP
Wed, May 24, 2017
United States
RE: Glass in Jalousie-style
in NC 2009 EAp2: Minimum Energy Performance
4,008 Marcus Sheffer
LEED Fellow
7group
Wed, May 24, 2017
RE: Alternative Compliance Path - C&S LEED Threshold reduction
in CS v4: Minimum energy performance
42 Marcus Sheffer
LEED Fellow
7group
Wed, May 24, 2017
Title Comments Most Recent Post Location
RE: Canadian LEED market
in LEED Canada Forum
62 Guillaume Martel
LEED Project Manager
PROVENCHER ROY + ASSOCIÉS ARCHITECTES
Thu, May 25, 2017
RE: v4 - SSc6 Project vs Lighting boundary
in Review Comments with Phantom Requirements
96 Hernando Miranda
Owner
Soltierra LLC
Wed, May 17, 2017
RE: Liability of the LEED Consultant
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
886 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Sun, May 14, 2017
RE: Overlap between LEED v4 and WELL
in WELL Building Standard Discussion Forum
76 Michael Munn
Assistant Project Manager, LEED AP BD+C, WELL AP
The Green Engineer, Inc.
Fri, May 12, 2017
RE: Projects constructed by diferent owners, same property managment
in LEED Guidance for Campuses and Multiple Buildings
588 Eric Anderson
Fri, May 5, 2017
RE: LEED V4 -Healthcare Or NC
in LEED Rating System Selection
831 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, May 5, 2017
RE: n/a
in Forum for LEED Volume Program Certification
14 Stefanie Young
Director, Technical Solutions
USGBC
Fri, May 5, 2017
RE: Non-default Historical Occupancy Rate for Hotel Project
in Calculating FTEs
217 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: Green Globes CIEB Technical Reference Manual?
in Green Globes Discussion Forum
11 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: ACP for Certified Wood vs Pilot for Legal Wood
in International Projects - alternative compliance path
171 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, May 4, 2017
RE: Increasing certification level after accepting certification?
in United States
2 Kristina Bach
Sustainability Specialist
HGA Architects and Engineers
Thu, Apr 27, 2017
RE: CARB and ECO-Certified
in New Rules for Formaldehyde in IEQc4.4
10 Jennifer Preston
Thu, Apr 20, 2017
SITES Discussion Forum - by Tristan Roberts
Wed, Apr 19, 2017
Parksmart Discussion Forum - by Tristan Roberts
Wed, Apr 19, 2017
Future-proofing LEED certification - Iran
in LEED Certified or Certifiable? Architects Make the Case for Earning the Plaque
10 Meike Borchers
Technical Director
WSP UK
Wed, Apr 19, 2017
Iran
RE: Arc Platform
in Performance Period
58 Batya Metalitz
Technical Director, LEED
USGBC
Thu, May 4, 2017
RE: LDP for EBOM Recertification - Pros and Cons?
in Discuss the LEED Dynamic Plaque and Arc
8 Camala Jones
Sustainability Coordinator
Austin Convention Center, Austin, Texas
Thu, May 4, 2017
RE: advanced buildings doc
in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”?
19 Erik Heck
Thu, May 4, 2017
RE: Qualified Energy Rater for v4
in LEED for Homes (LEED-H) Forum
165 Steve Loppnow
Sustainability Manager
YR&G
Thu, May 4, 2017
RE: Sunset date for v3 certification
in LEED 2009 Registration Extended to October 2016
141 Alicja Bieszyńska
Skanska
Thu, Jan 26, 2017
Title Comments Most Recent Post Location
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Mon, May 23, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Sun, May 22, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Sat, May 21, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 17, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 17, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 17, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 17, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Thu, May 12, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Thu, May 12, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Fri, May 6, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Thu, May 5, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 3, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 3, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Tue, May 3, 2011
United States
RE: Eac2 - Photovoltaic Solar Energy - Simulation
in NC v2.2 EAc2: On-Site Renewable Energy
45 Marcus Sheffer
LEED Fellow
7group
Wed, Apr 20, 2011
HIT-HY 200-R
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Celimar Fournier
Project Engineer
Turner Construction
Mon, Apr 18, 2011
RE: Projects in California
in NC 2009 SSc6.2: Stormwater Design—Quality Control
183 Michael D. DeVuono
Senior Staff Engineer
T&M Associates
Mon, Apr 18, 2011
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Thu, Apr 14, 2011
United States
Detention Center Perimeter and Recreation Yard Security Lighting
in NC 2009 SSc8: Light Pollution Reduction
648 Dranan Sparks
Sr. Electrical Designer, LEED AP BD+C, GPCP, GGP
Bowman, Foster & Associates
Thu, Apr 14, 2011
United States
RE: 2009 Initial Certification -> v4 Recertification?
in LEED Recertification
70 GHT Green Team
Sustainable Programs Studio
GHT Limited
Sun, Apr 10, 2011
Title Comments Post date Most Recent Postsort icon Location
District graywater recycling system
in NC 2009 WEc3: Water Use Reduction
132 Brian Meinrath
Associate
Atelier Ten
Thu, Aug 27, 2015
2015-08-27 18:01 United States
Roof/Terrace
in NC 2009 SSc7.2: Heat Island Effect—Roof
342 Lauren Bellamy
Thu, Aug 27, 2015
2015-08-27 14:25 United States
Assembly Calculator for Materials with Recycled Content
in NC 2009 MRc4: Recycled Content
658 CAROLINE PIN
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
Thu, Aug 27, 2015
2015-08-27 14:06 France
Defining Boundary for Energy Performance
in NC 2009 EAp2: Minimum Energy Performance
4,008 Ralph Bicknese
Principal
Hellmuth + Bicknese Architects
Thu, Aug 27, 2015
2015-08-27 11:28 United States
Tenant Guidelines for CS spaces within NC
in MPR2: Must be a complete, permanent building or space
227 Melanie Silver
Sustainability Coordinator
FXFOWLE
Thu, Aug 27, 2015
2015-08-27 11:15 United States
HVAC duct insulation adhesive
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Gaura Saxena
Ms.
Egis India Consulting Engineers Pvt. Ltd.
Thu, Aug 27, 2015
2015-08-27 00:11 India
62MZ calc for critical zones
in NC-2009 IEQp1: Minimum IAQ Performance
1,090 Hieu Huynh
Environmental Engineer, LEED AP BD+C
Thu, Aug 27, 2015
2015-08-27 00:01 Vietnam
What "floor area" to use
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
358 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Wed, Aug 26, 2015
2015-08-26 21:10 United States
Move-in versus construction
in LEED Rating System Selection
831 Mark Donahue
Price Architects, Inc.
Wed, Aug 26, 2015
2015-08-26 16:49 United States
Meeting parking requirements for residential spaces
in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
359 Magda Aghababyan
CEO
Co-Energi (Pvt) Ltd.
Wed, Aug 26, 2015
2015-08-26 01:09 Sri Lanka
Main entrance and LEED Project Boundary for Future Expansion
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
306 Lourdes Salinas
THREE Consultoría Medioambiental
Tue, Aug 25, 2015
2015-08-25 19:32 Mexico
Bus Stops Planned, Not Yet Built
in ND-v2009: Locations with reduced automobile dependence
24 Sara Zoumbaris
Sustainable Design Consulting
Tue, Aug 25, 2015
2015-08-25 15:04 United States
Several separate baseline HVAC systems on one floor.
in NC 2009 EAp2: Minimum Energy Performance
4,008 Nina Starynina
Tue, Aug 25, 2015
2015-08-25 10:05 Russian Federation
LEED EBOM Eligibility
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
528 Amgad Khattab
Managing Partner
Engineering Solutions
Tue, Aug 25, 2015
2015-08-25 07:11 Egypt
LEED EBOM Eligibility
in PIf1: Minimum Program Requirements
5 Amgad Khattab
Managing Partner
Engineering Solutions
Tue, Aug 25, 2015
2015-08-25 07:04 Egypt
Baseline ventilation rates
in NC 2009 EAp2: Minimum Energy Performance
4,008 TOMAS URIBE
PROJECT MANAGER
SOLUCIONES ENERGETICAS SOSTENIBLES
Mon, Aug 24, 2015
2015-08-24 17:44 Colombia
Diverse Uses: Community Anchor Uses: Housing
in NC-v4: Surrounding density and diverse uses
30 Kevin Dunphy
Project Coordinator, LEED AP BD+C
Holabird & Root
Mon, Aug 24, 2015
2015-08-24 15:07 United States
Electric Vehicles Fueling Stations / Parking Spots
in CS 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
117 Daniel Brum
Director
Integrative Consulting
Mon, Aug 24, 2015
2015-08-24 14:01 Brazil
a one-family House can be LEED EBOM?
in PIf2: Project Summary Details
4 SUMAC Inc.
SUMAC
Mon, Aug 24, 2015
2015-08-24 10:19 Peru
LEED CS 2009 EAc1
in CS 2009 EAc1: Optimize Energy Performance
355 Ruel Galve
Executive Mechanical Engineer
PT Meinhardt Indonesia
Mon, Aug 24, 2015
2015-08-24 05:11 Indonesia

Copyright 2017 – BuildingGreen, Inc.