Guatemala

These discussion threads from across LEEDuser have been tagged by the commenter as relevant to this geographic location. Please join the discussion by clicking through to those specific threads. Or for general issues specific to your location, please post at the bottom of this page!

Title Comments Post date Most Recent Post Location
Gross floor area modification
in PIf2: Project Summary Details
13 Carlos Echeverria
Architect
Studio Domus
Tue, Apr 18, 2017
2017-04-18 13:43 Guatemala
Meeting room ID+C: CI certification
in CI-v4: Must comply with project size requirements
3 Carlos Echeverria
Architect
Studio Domus
Thu, Apr 6, 2017
2017-04-06 12:39 Guatemala
Meeting room ID+C: CI certification
in CI-v4: Must use reasonable LEED boundaries
7 Carlos Echeverria
Architect
Studio Domus
Wed, Apr 5, 2017
2017-04-05 20:38 Guatemala
Can roofed areas be considered open space?
in CS 2009 SSc5.2: Site Development—Maximize Open Space
61 Alejandro Rivera Rivera
LEED AP BD+C, ID+C
ASTY
Mon, Mar 20, 2017
2017-03-20 03:34 Guatemala

0 Comments

Start a new comment thread

Apr 23 2017
Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.

Copyright 2017 – BuildingGreen, Inc.