LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
Landscape Architect Statement template
in ND-v2009: Tree-lined and shaded streets
2 Tom Hootman
Director of Sustainability
RNL
Tue, Jun 10, 2014
Garbage vs recycable area
in Schools 2009 MRp1: Storage and Collection of Recyclables
13 Omar Katanani
Tue, Jun 10, 2014
Design of the artificial lighting
in Designing for Daylighting
16 Valentin Grimaud
Thermal Engineer
TERAO Green Building Engineering
Tue, Jun 10, 2014
Prefered Parking Requirement
in Healthcare-v2009: Alternative transportation - parking capacity
1 Todd Bundren
Director of Sustainabilty - Architectural Project Manager
Lawrence Group
Tue, Jun 10, 2014
SRI compliant paints
in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
67 RASHID HAMEEN
Tue, Jun 10, 2014
Prerequisite
in NC-v4: Integrative process
3 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Tue, Jun 10, 2014
Is Education still acceptable?
in NC-v4: Innovation
5 deborah lucking
associate
fentress architects
Tue, Jun 10, 2014
Hot Humid, Multi Family Compliance
in Mid-Rise v4: Ventilation
1 Jason Biondi
Managing Director
Energy Cost Solutions Group
Mon, Jun 9, 2014
Registering Projects
in Registering Projects
17 Elizabeth McPherson
Principal
McPherson Environmental Resources
Mon, Jun 9, 2014
Storm drainage swales for limits of construction
in NC v2.2 SSc5.1: Site Development—Protect or Restore Habitat
60 Benjamin Lombardo
Operations Manager
Catamount Constructors, Inc
Fri, Jun 6, 2014
RE: Green Cleaning Policies
in EBOM 2009 IEQp3: Green Cleaning Policy
71 Megan Meiklejohn
Sustainability Operations Director, East Coast
Healthy Buildings
Fri, Jun 6, 2014
RE: Ventilation in rerigerated warehouse spaces
in NC v2.2 EQp1: Minimum IAQ Performance
56 Lorey Flick
Director- Sustainable Services
ADS Engineers
Fri, Jun 6, 2014
RE: Filling the Master format template
in CI 2009 MRc4: Recycled Content
153 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jun 6, 2014
Case study for preliminary analysis
in CS v4: Integrative process
2 LEED Consultant
Green Building and Alternative Energy
Fri, Jun 6, 2014
Phased Construction
in NC v2.2 EQc3.1: Construction IAQ Management Plan—During Construction
19 Amy Bechard
Thu, Jun 5, 2014
RE: Green energy default values
in CI 2009 EAc4: Green Power
95 Marcus Sheffer
LEED Fellow
7group
Thu, Jun 5, 2014
Extra Point = Building Performance Partnership
in CS 2009 EAc5.1: Measurement and Verification—Base Building
94 Alison Y Rivenburgh
Wed, Jun 4, 2014
RE: Standard requirements clarification
in Healthcare-v2009: Light pollution reduction
8 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Jun 4, 2014
RE: Shared parking facilities
in NC-2009: Green vehicles
14 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Jun 4, 2014
BREEAM as the certification scheme
in ND-v2009: Certified green building
16 Tanja Arnesson
Skanska Sweden AB
Wed, Jun 4, 2014
Title Comments Most Recent Post Location
Waste stream audit
in EBOM-v4: Ongoing purchasing and waste policy
1 Michael Smithing
Director - Green Building Advisory
Colliers International
Sun, May 18, 2014
No Added Formaldehyde
in NC v2.2 EQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
31 Angela Jackson-Bailey
Fri, May 16, 2014
Documentation and Tabulation of Areas
in CI-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
60 Weston Blaney
Project Manager
Carson Design
Thu, May 15, 2014
Unoccupied Building
in Data Centers-NC-v4: Must comply with project size requirements
4 Phillip Cook
WGE
Wed, May 14, 2014
Trash compactor
in CS 2009 MRp1: Storage and Collection of Recyclables
45 Gabriela Hernández Castillo
Architect, LEED AP BD+C
SYASA - México
Wed, May 14, 2014
Trash can liner credit EBOM V4
in Retail-EBOM-v4: Green cleaning - products and materials
3 Marion Stecklow
Executive Director
Building Wellness Institute
Wed, May 14, 2014
MRc7 collecting documentation
in Schools 2009 MRc7: Certified Wood
21 Brian Smith
CDT, QCM LEED AP BD+C
BIM Street - Sustainable Intelligent Design, LLC
Tue, May 13, 2014
Plf3
in PIf3: Occupant and Usage Data
3 Kathleen Burke
Gastinger Walker Harden Architects
Mon, May 12, 2014
Space listings & supporting documentation
in Healthcare-v2009: Acoustic environment
13 Catherine Blakemore
Architect, LEED AP BC+D
HOLT Architects
Mon, May 12, 2014
Resort in remote area
in PIf3: Project Location and Base Mapping
2 Racha Rachwan
ACE Project Management
Mon, May 12, 2014
International Projects Regional Credits
in EBOM-v4: Regional priority
1 Luis Huertas
Principal
Luis G Huertas, Architect
Sun, May 11, 2014
Exclusions
in Pilot Credit 53: Responsible Sourcing of Raw Materials
5 Vivien Fairlamb
Fri, May 9, 2014
Completing PIF1 when you have an exception to providing meters
in MPR6: Must commit to sharing whole-building energy and water usage data
35 Susan Di Giulio
Project Manager
Zinner Consultants
Fri, May 9, 2014
Qualifying Out-patient Population
in Healthcare-v2009: Connection to the natural world - direct exterior access for patients
5 Norma Lehman
Director of Sustainability
The Beck Group
Fri, May 9, 2014
Options and Paths for Pilot Credit 16
in Pilot Credit 16: Rainwater Management
15 Laura Millberg
Sustainable Development
Minnesota Pollution Control Agency
Wed, May 7, 2014
Property Boundry.
in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
4 Phillip Cook
WGE
Tue, May 6, 2014
RE: Facilities for Rent
in Schools SSc10: Joint Use of Facilities
36 Edificioverde S.A.
Mon, May 5, 2014
How to determine the 90% of the average annual rainfall
in CS-2009 SSc6.2: Stormwater Design—Quality Control
25 Hansong Sun
Mon, May 5, 2014
understanding the Daylight Factor method
in CI 2009 IEQc8.1: Daylight and Views—Daylight
124 Alex Warburton
Thu, May 1, 2014
All weather pathways?
in Pilot Credit 9: Street Network
67 Cory Benson
Managing Director
Made Sustainable
Thu, May 1, 2014
Title Comments Most Recent Post Location
First LEED-ND Platinum Certification for NYC at Columbia University - by Erin Weaver
Wed, Jul 11, 2012
LEED for Existing Homes
in LEED for EB- O&M for Homes
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 2, 2012
LEED “Certifiable” Specifications: 4 Approaches - by Tristan Roberts
Wed, Jun 27, 2012
ACP Process : BREEAM equivalency
in LEED Now Recognizes Energy Credits from BREEAM
1 CHRISTOPHE MATHIEU
Sustainable Design And Construction Consultants, Paris, France
greenaffair
Mon, Jun 25, 2012
RE: What should USGBC do with the extra time to ensure success?
in LEED 2012 Postponed to 2013, Renamed LEED v4
28 Lorne Mlotek
LEED AP BD+C
LeadingGREEN
Thu, Jun 14, 2012
LEED Specifications
in Top Six Things LEED Consultants Do Wrong in Specs
5 Jerry Yudelson
President
Green Building Initiative
Wed, Jun 20, 2012
Dan,
in LEED Submittal Forms, Beta to v3
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Tue, Jun 12, 2012
LEED Online Access to Certified Projects
in LEED Online Access to Certified Projects
8 David Eldridge
Project Manager
Grumman/Butkus Associates
Wed, May 30, 2012
Members Only?
in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
107 Landon Chapman
Graduate Architect, LEED AP
MSKTD & Associates, Inc.
Tue, May 15, 2012
LEED certification in China
in Hi from China LEED engineer
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, May 5, 2012
retaining LEED certification
in Loss of LEED Certification after renovating?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 1, 2012
LPEs
in LEED 2012 Behind the Scenes - follow up conversation
4 Susan Walter
Sr Project Architect
Wilmot/Sanz
Tue, May 1, 2012
Reduced Parking Footprint
in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section
16 Robert Korp
Manager of Projects
Barry Isett & Associates
Fri, Apr 27, 2012
Fundamental Commissioning
in LEED 2012 – 2nd Public Comment – Performance (PF) Section
9 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Thu, Apr 19, 2012
RE: GSF with demolition
in Demolition of Existing Building
4 Ruben Garza
Wed, Apr 11, 2012
Specific Forum
in The Certification of an Institutional Building
2 Emily Catacchio
Sustainability Specialist
Wight and Company
Wed, Apr 11, 2012
Re: Retail Project overview documents
in Retail Project
6 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Tue, Apr 10, 2012
Jasmin,
in Addition (second construction phase) to LEED certified building
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Tue, Apr 10, 2012
Integrated Water Budget
in LEED 2012 – 3rd Public Comment – WE (Water Efficiency) Section
14 ROBIN KINERK
Owner
Kinerk Strategic Marketing
Mon, Apr 9, 2012
Occupant Surveys & Thermal Comfort Verification
in LEED 2012 – 3rd Public Comment – IEQ (Indoor Environmental Quality) Section
20 Lindsay Baker
Consultant, PhD Candidate
UC Berkeley, Center for the Built Environment
Tue, Mar 27, 2012
Title Comments Most Recent Post Location
Use of renewable energy in calculation
in ND-v4: Optimize building energy performance
1 Martine Desbois
Wed, Apr 16, 2014
Development Density Exemplary Performance - Site Area
in CS 2009 SSc2: Development Density and Community Connectivity
39 Emmanuel Gee
Project Architect
Buell Kratzer Powell
Mon, Apr 14, 2014
USGBC master account ?
in MPR6: Must commit to sharing whole-building energy and water usage data
35 Mike Barker
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
Mon, Apr 14, 2014
IO Credit _ Option B (Additional Strategies)
in EBOM 2009 RPc1: Regional Priority
46 Pal Ahuja
President
Millennium Engineering Inc.
Fri, Apr 11, 2014
Pest Prevention by Design guidelines
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
71 Mark Palmer
Senior Green Building Coordinator
City of San Francsico
Thu, Apr 10, 2014
LEEDuser's audit IAQ form
in EBOM 2009 IEQc1.1: IAQ Best Management Practices—IAQ Management Program
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 10, 2014
Change the LEED AP person during the project
in CS 2009 IDc2: LEED Accredited Professional
13 Nándor Kovács
Project Manager
Obuda-Ujlak Zrt.
Thu, Apr 10, 2014
Design Condition
in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
323 Jerry Scott
Wed, Apr 9, 2014
Natural ventilation of interior rooms
in NC-2009 IEQp1: Minimum IAQ Performance
782 Ritwik Kakati
Dagher Engineering, PLLC
Wed, Apr 9, 2014
Material SRI
in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
67 Mohamed Hesham
LEED green associate
Wed, Apr 9, 2014
number of working days
in EBOM 2009 SSc4: Alternative Commuting Transportation
271 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Wed, Apr 9, 2014
Acceptable Forms of Universal Notification?
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
71 American University
Sustainability
American University
Tue, Apr 8, 2014
Mercury Lamps
in EBOM 2009 MRp2: Solid Waste Management Policy
23 Nate Gillette
Director
Natura Architectural Consulting LLC
Sun, Apr 6, 2014
Become a LEED committee member!
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
72 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Fri, Apr 4, 2014
Become a LEED committee member!
in EBOM 2009 SSc6: Stormwater Quantity Control
61 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Fri, Apr 4, 2014
Airflow measuring devices on MUA
in EBOM 2009 IEQc1.2: IAQ Best Management Practices—Outdoor Air Delivery Monitoring
24 Trevor Gilbert
Energy Profiles
Fri, Apr 4, 2014
Garage entrances to building
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
86 Maria Isabel Conde
Owner
Aqua Terra (Panama) S.A.
Thu, Apr 3, 2014
ASHRAE vs. ISO/EN
in CI 2009 IEQc7.1: Thermal Comfort—Design
48 Jens Apel
Thu, Apr 3, 2014
ASHRAE vs. ISO/EN
in CS 2009 IEQc7: Thermal Comfort—Design
22 Jens Apel
Thu, Apr 3, 2014
Lighting Power Density
in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
86 Yaser Al Sharif
Thu, Apr 3, 2014
Title Comments Post date Most Recent Postsort icon Location
Adhesive- expansion joints
in Schools IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
32 Stephanie Santiago
Venegas Engineering Management & Construction Inc
Wed, Oct 1, 2014
2014-10-01 16:25 United States
Potential ID Credit
in NC 2009 IDc1: Innovation in Design
530 Ashley Bertling
Wed, Oct 1, 2014
2014-10-01 11:06 United States
LEED Design Review and Final Certification Proceedures
in Start a New LEED Discussion Topic
132 Susannah Goddard
Wed, Oct 1, 2014
2014-10-01 08:31 United Kingdom
Credit 3.2 option 2
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
251 Michael Schrantz
Environmental Analytics
Tue, Sep 30, 2014
2014-09-30 13:57 United States
Glazing specifications for existing building
in CS 2009 EAp2: Minimum Energy Performance
842 João Costa
Engineer
ETRIA
Tue, Sep 30, 2014
2014-09-30 11:01 Brazil
LED lamps
in EBOM-v4: Purchasing - lamps
2 Karim Farah
Sustainability Manager / USGBC Faculty
Dar Al-Handasah
Tue, Sep 30, 2014
2014-09-30 09:18 Saudi Arabia
Modeling Heat Reclaim in EAp2 v2009
in NC 2009 EAp2: Minimum Energy Performance
2,391 Mario S.
Tue, Sep 30, 2014
2014-09-30 02:17 Lebanon
Fire Department Practice Burn
in NC 2009 MRc2: Construction Waste Management
334 Brian Leet
Freeman French Freeman
Mon, Sep 29, 2014
2014-09-29 16:43 United States
Site lighting calculations
in CS 2009 EAp2: Minimum Energy Performance
842 charles bell
principal
theGreenTeam, Inc.
Mon, Sep 29, 2014
2014-09-29 09:33 United States
FTEs and Total Daily Uses for Showers
in CI 2009 WEp1: Water Use Reduction—20% Reduction
214 Rodrigo Gomez Junco
LEED AP BD+C
SINERGI Integrated Building Sciences, LLC
Fri, Sep 26, 2014
2014-09-26 13:07 Mexico
Help, my process energy is greater than 25%
in Completing the LEED Online EAp2 Form – Option 1: Whole Building Energy Simulation
47 Amy Harmon
Fri, Sep 26, 2014
2014-09-26 09:23 United States
Typical TSS measures from Sedum roofing
in NC 2009 SSc6.2: Stormwater Design—Quality Control
164 Andreas Soederberg
Fri, Sep 26, 2014
2014-09-26 04:03 Sweden
WEp1 and c1: Indoor Water Use Reduction
in CI-v4: Indoor water use reduction
2 BEE Bisagni Environmental Enterprise
Thu, Sep 25, 2014
2014-09-25 23:45 China
SSc4.3 Option 2: How long must charge stations be installed ?
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
351 Kimberlyn Caoagas
Thu, Sep 25, 2014
2014-09-25 15:16 United States
FTE Consistency Pertaining to IEQp1
in NC-2009 IEQp1: Minimum IAQ Performance
782 Spencer Eldredge
Associate Engineer
Weston Solutions, Inc.
Thu, Sep 25, 2014
2014-09-25 14:49 United States
Mixed feelings about numbering
in Poll – Should LEED v4 Credits Have Numbers?
3 Andres Schwarz
Principal
NRG-AR
Thu, Sep 25, 2014
2014-09-25 14:36 Argentina
Need for consistent numbering system across all rating systems
in Poll – Should LEED v4 Credits Have Numbers?
3 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Thu, Sep 25, 2014
2014-09-25 14:21 United States
Line of Site into Multi-Story Dorm & Ceiling Mounted Glazing
in NC 2009 SSc8: Light Pollution Reduction
547 Sara Zoumbaris
Thu, Sep 25, 2014
2014-09-25 13:40 United States
Required Manufacturer Documentation for Option 3
in NC-v4: Building product disclosure and optimization - material ingredients
7 Randy Van Straaten
Thu, Sep 25, 2014
2014-09-25 12:41 United States
LPD in future spaces for Energy Model
in LEED Minimum Program Requirements
442 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Thu, Sep 25, 2014
2014-09-25 11:41 United States

Copyright 2014 – BuildingGreen, Inc.