LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: LEED ND acronyms
in What’s New in LEED for Neighborhood Development v4
3 Conor Merrigan
Principal
C2 Sustainability LLC
Tue, Apr 29, 2014
RE: LEED for Retail
in PIf1: Minimum Program Requirements
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 29, 2014
RE: IN Credit 2: LEED Accredited Professional
in CI-v4: LEED Accredited Professional
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 29, 2014
Choice between LEED NC & LEED HC
in LEED for Healthcare forum - LEED-HC users welcome!
120 Omar Katanani
Mon, Apr 28, 2014
RE: Feed-in Tariff Program Allowed?
in CS 2009 EAc2: On-Site Renewable Energy
47 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 28, 2014
LEED v3 CS Warehouse - MPR Minimum Occupancy Compliance
in MPR5: Must comply with minimum occupancy rates
1 Asa Posner
Senior Sustainability Consultant
Sustainable Investment Group (SIG)
Fri, Apr 25, 2014
RE: Previously developed
in CS v4: Surrounding density and diverse uses
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 24, 2014
Performance Period Extension, Post-Reviewer's Comments
in Performance Period
51 Sara Zoumbaris
Wed, Apr 23, 2014
RE: Trying to locate 2yr, 24hr rainfall info for Central America
in Locating 2-year, 24-hour rainfall intensity values for EBOM SSc6
7 Samantha Longshore
Sustainability Advisor
Transwestern
Mon, Apr 21, 2014
Greenhouse Program
in Schools 2009 IDc1: Innovation in Design
18 Larry Turbes
Architect
TKDA
Fri, Apr 18, 2014
Illustrating Compliance using representative sampling?
in EBOM 2009 IEQc2.2: Controllability of Systems—Lighting
48 Ryan Hoffman
Heapy Engineering
Thu, Apr 17, 2014
RE: Building Reuse off Site
in Schools-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
16 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Thu, Apr 17, 2014
RE: Window Frames and Window Area
in Schools 2009 IEQc8.1: Daylight and Views—Daylight
123 Todd Reed
Daylight Designer
7group
Thu, Apr 17, 2014
Use of renewable energy in calculation
in ND-v4: Optimize building energy performance
1 Martine Desbois
Wed, Apr 16, 2014
RE: Entry Matt Cleaning Requirements
in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control
91 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 23, 2014
RE: Multiple Buildings
in EBOM-v4: Indoor water use reduction
2 Trista Little
Sustainability Manager
YR&G
Tue, Apr 15, 2014
RE: Credit Pending due to type of Manufactures documentation
in Schools 2009 MRc4: Recycled Content
25 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Mon, Apr 14, 2014
RE: Process refrigerant conversion
in EBOM 2009 EAp3: Fundamental Refrigerant Management
63 Julia Weatherby
Senior Mechanical Engineer
Lindgren & Sharples, P.C.
Fri, Apr 11, 2014
IO Credit _ Option B (Additional Strategies)
in EBOM 2009 RPc1: Regional Priority
46 Pal Ahuja
President
Millennium Engineering Inc.
Fri, Apr 11, 2014
RE: Ergonomic Strategy - 75% ergonomic workstations
in Pilot Credit 44: Ergonomics Strategy
32 Lisa Marshall
Ecological Building Strategies
Fri, Apr 11, 2014
Title Comments Most Recent Post
RE: acrylic with non paper backer
in Homes-v4: Durability management
2 Ann Edminster
founder/principal
Design AVEnues LLC
Fri, Mar 28, 2014
HVAC system's capability to accommodate CO2 sensors
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
50 CT G
Fri, Mar 28, 2014
Question about the Performance Period & newley added credits
in PIf4: Schedule and Overview Documents
1 Bahareh van Boekhold
Energy and Sustainability Planner
Delaware Division of Energy and Climate
Thu, Mar 27, 2014
RE: Working hours and daylight
in NC v2.2 EQc8.1: Daylight and Views—Daylight 75% of Spaces
169 Todd Reed
Daylight Designer
7group
Thu, Mar 27, 2014
RE: Feedback for ACP Program
in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2
9 David Eldridge
Project Manager
Grumman/Butkus Associates
Wed, Mar 26, 2014
RE: Late Start
in Hospitality-NC-v4: Integrative process
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 26, 2014
Not Regularly occupied
in NC-v4: Enhanced indoor air quality strategies
1 Phillip Cook
WGE
Wed, Mar 26, 2014
RE: Timing of survey?
in ND-v2009: Imperiled species and ecological communities conservation
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Mar 21, 2014
RE: Data loggers
in EBOM-v4: Thermal comfort
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 21, 2014
Green Cleaning products for norovirus?
in EBOM 2009 IEQc3.1: Green Cleaning—High Performance Cleaning Program
25 Lauren Sparandara
Sustainability Manager
Google
Wed, Apr 16, 2014
RE: Pilot Credit Closed
in Pilot Credit 7: Light Pollution Reduction
29 Glenn Heinmiller
IALD, LC, LEED AP, Principal
Lam Partners
Wed, Mar 19, 2014
Achieving this credit in a Shopping mall?
in CS 2009 IEQc6: Controllability of Systems—Thermal Comfort
34 Omar Katanani
Mon, Mar 17, 2014
RE: T2, T4, T6
in Healthcare-v2009: PBT source reduction - mercury
7 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M
Revitaliza Consultores
Fri, Mar 14, 2014
Open grid pavement
in NC v2.2 SSc7.1: Heat Island Effect—Nonroof
39 james connors
Thu, Mar 13, 2014
Insulating Concrete Forms
in Pilot Credit 20: Recycled Content for Non-Structural Materials
11 Amy Van Dam
Sustainable Design Coordinator
Boulder Associates Architects
Thu, Mar 13, 2014
RE: Appropriate use of Core and Shell?
in PIf5: Building System Control
10 John Beeson
Chief Mystic in Resident
Catalyst Partners
Wed, Mar 12, 2014
RE: Manual Override
in NC-v4: Light pollution reduction
4 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Mar 12, 2014
RE: CFL compliance
in Healthcare-v2009: PBT source reduction - mercury in lamps
11 Mark Gelfo
DIrector of Sustainability
TLC Engineering for Archiecture
Tue, Mar 11, 2014
RE: EAc4 calculator vs online template
in NC v2.2 EAc4: Enhanced Refrigerant Management
22 Amy Harmon
Tue, Mar 11, 2014
RE: Senior living facility
in ND-v2009: Connected and open community
34 Susan Di Giulio
Project Manager
Zinner Consultants
Tue, Mar 11, 2014
Title Comments Most Recent Post
Re: Project Summary Information
in Project Summary Information
1 David Posada
Sustainability Manager
GBD Architects
Mon, Dec 20, 2010
RE: LEED for hotels
in Hotels - Must We Use New Retail Program?
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Dec 17, 2010
post under IEQc4.2
in Paint VOC limits
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 14, 2010
RE: BUilding area to site area ratio
in EB-OM PIf2- Project Summary Details
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
Proposed changes to the LEED AP credit
in What's behind the proposed changes to the LEED AP credit for LEED 2012?
1 James Green
VP Engineering
HInes
Wed, Dec 8, 2010
MEP components
in Include plumbing components to recycled content
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
RE: Does anyone have any thoughts
in BREEAM as an alternative green building system?
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 7, 2010
RE: Same here. Its been about 15
in Pilot Credit Survey completion e-mail
3 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Dec 1, 2010
Treatment of District or Campus Thermal Energy
in DOes any one know if the USGBC produced the Addenda for LEED 2009 Districit Energy guidance?
1 Scott DeGaro
Sustainability Administrator
Barge Waggoner Sumner & Cannon, Inc.
Tue, Nov 30, 2010
Thank you
in Want to share LEED documentation tools or documents?
1 Terry Squyres
Principal
GWWO Inc./Architects
Wed, Nov 24, 2010
Ergonomic Design
in Ergonomic Design for an Innovation Point
1 Simon S.
SL+A International, Taipei
Thu, Nov 18, 2010
RE: 2009 CI IEQ Credit 5 Entryway System
in CI 2009 IEQ Credit 5 Entryway Systems
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Nov 17, 2010
RE: change in scope
in Extension of Mechanical Duct work
2 Kendrick Richardson
LSY Architects
Tue, Nov 16, 2010
LEED boundary
in Remote Parking lot, pre-existing LEED project
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 16, 2010
MPR#6
in Sharing energy/water useage data
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Nov 15, 2010
RE: LEED documentation in English
in Documentation
3 Katsiaryna Mazur
ISG OLSON, CJSC
Mon, Nov 15, 2010
certifying the process
in LEED for Water/Wastewater Treatment Facilities?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Nov 13, 2010
runs the gamut
in Taking Advantage of Utility Incentives?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 12, 2010
RE: out buildings and LEED
in Question about multiple buildings & LEED
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Nov 12, 2010
New LEED 2009 Addenda Released - November 2010 - by Tristan Roberts
Mon, Nov 8, 2010
Title Votes Comments Most Recent Post
RE: Performance Period - end dates
in LEED-EBOM: Eight Steps to Success
91 31 John Albrecht
Director of LEED Services
Sieben Energy Assoc.
Sat, Feb 12, 2011
RE: How does this people still using the title LEED AP
in GBCI Streamlines LEED Credentialing, Offers New Window for Legacy LEED APs
91 47 Zachary Rohlfs
Plumbing and Fire Protection Engineer
Mon, Nov 12, 2012
RE: EP Credit
in EBOM 2009 MRc8: Solid Waste Management—Durable Goods
90 42 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 28, 2010
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
90 91 Jennifer Jewell
Project Manager/Project Architect
Design Collective, Inc.
Wed, Sep 8, 2010
RE: Zero employees did not commute due to an absence
in EBOM 2009 SSc4: Alternative Commuting Transportation
90 269 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Thu, Jan 31, 2013
Beehives on rooftops – ID credit?
in CI 2009 IDc1: Innovation in Design
90 137 Maria Porter
Environmental Certification Engineer
Skanska Sweden
Tue, Nov 29, 2011
leed pilot credits - we need your help!
in Pilot Credit 10: Sustainable Wastewater Management
90 54 Brendan Owens, LEED Fellow
Vice President, LEED Technical Development
USGBC
Thu, Sep 9, 2010
RE: Building Area Method Compliance Path
in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
90 84 Dane Sanders
Principal
Clanton Associates
Fri, Aug 6, 2010
RE: Composite materials
in NC v2.2 MRc4: Recycled Content
90 148 Anne Nicklin
Executive Director
Building Materials Reuse Association
Tue, Sep 28, 2010
Must we include all furniture in project?
in NC v2.2 MRc4: Recycled Content
90 148 Reid Middlebrooks
Sustainability Director
Apollo BBC
Tue, Dec 27, 2011
Uploading Phase II ESA report - where?
in Schools SSp2: Environmental Site Assessment
90 52 Renee Shirey
Fri, Sep 17, 2010
RE: "Building Completed 1993 or Later" Tab on Graph
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
90 51 Paul C
Mon, Sep 20, 2010
RE: VOC Budget - General Question
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
89 371 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Thu, Aug 12, 2010
no desigated/assigned/reserved parking for tenant
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
89 121 Kathy Buck
Senior Project Manager
Neumann/Smith Architecture
Wed, Aug 25, 2010
RE: Local zoning requires no parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
89 121 Larry Jones
Associate
Atelier Ten
Tue, Sep 21, 2010
RE: WEc3 & WEc2 linked?
in NC 2009 WEc3: Water Use Reduction
89 97 E H
Sustainability Architect
Mon, Apr 15, 2013
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
89 91 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Wed, Sep 8, 2010
right to access checklist
in EBOM 2009 SSc1: LEED Certified Design and Construction
89 37 Joanna Yaghooti
Director of Sustainable Design
PageSoutherlandPage
Thu, Aug 12, 2010
Extensive Green Cleaning Policy
in Schools 2009 IDc1: Innovation in Design
89 18 Russell Philstrom
Fri, Sep 24, 2010
RE: Guestrooms Excluded?
in LEED IEQ Space Matrix - Frequently Asked Questions
89 31 Lauren Sparandara
Sustainability Manager
Google
Thu, Apr 18, 2013
Title Comments Most Recent Post
multiple buildings forum
in Multiple Buildings - One Registration
5 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
Check my math
in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
252 American University
Sustainability
American University
Mon, Nov 4, 2013
fitness shower
in NC 2009 WEp1: Water Use Reduction—20% Reduction
585 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Mon, Nov 4, 2013
see MPR-specific forums
in LEED Minimum Program Requirements
440 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Nov 3, 2013
MRc69 easily achieved with a comprehensive comingled service
in NC-2009: Construction and demolition waste management
9 Vince Briones
Sustainable Design Manager
Atkins
Sat, Nov 2, 2013
Pilot credit 10 vs. WEc2:Innovative Wastewater Technologies
in Pilot Credit 10: Sustainable Wastewater Management
54 Jiri Dobias
Fri, Nov 1, 2013
VRP Compliance Calculator Error
in Healthcare-v2009: Minimum indoor air quality performance
9 Kevin Chow
Mechanical Engineer
Thu, Oct 24, 2013
"Trying is no longer enough" - When did this change occur?
in Using the LEED Pilot Credit Library
28 Adam West
Project Manager
Southface Energy Institute
Mon, Oct 14, 2013
Removal of Office/Open Office Trash Cans
in EBOM 2009 MRp2: Solid Waste Management Policy
23 Heather Riley
LEED Project Manager
SAS Institute Inc.
Fri, Oct 11, 2013
Universal Design
in Pilot Credit 34: Design for Adaptability
10 USGBC IP Account
Fri, Oct 4, 2013
Challenges logging into forum
in Pilot Credit 24: Acoustics
28 deborah lucking
associate
fentress architects
Wed, Sep 25, 2013
Industry Scare Tactics
in Does LEED v4 Ban PVC?
11 Andrew Ellsworth
Ellsworth Building Portfolio Services
Mon, Sep 23, 2013
Modeling a Commercial Kitchen
in NC 2009 EAp2: Minimum Energy Performance
2,272 September Silvers
Senior Mechanical Engineer
Mussett, Nicholas & Associates
Mon, Sep 23, 2013
Well Said - Not All PVCs are Equal - Good Decisions are Required
in Does LEED v4 Ban PVC?
11 Louise Schlatter
Architect
SSOE Group
Mon, Sep 23, 2013
LEEDuser template updated
in EBOM 2009 SSc2: Building Exterior and Hardscape Management Plan
100 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 17, 2013
Remediating to "residential (unrestricted) use"
in Healthcare-v2009: Environmental site assessment
6 Kathy Wislocky
Project Manager
Isgenuity LLC
Thu, Sep 12, 2013
Core performance path
in NC 2009 EAc1: Optimize Energy Performance
1,064 Jatuwat Varodompun
Dr
Green Building Soultion
Sat, Sep 7, 2013
LEED Scorecard Forms
in Scorecard
6 Clara Simon
Sustainability Manager
University of Washington - Capital Projects Office
Fri, Sep 6, 2013
SSc6 - Site Improvement Plan
in EBOM-v4: Site improvement plan
1 Levi Jimenez
Project Manager
BuildingWise
Fri, Sep 6, 2013
BREEAM and LEED
in BREEAM Equivalency for LEED Projects
1 Emily Rhee
Fri, Sep 6, 2013

Copyright 2014 – BuildingGreen, Inc.