LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Split Submissions now and after 2015
in How long does it take for USGBC to do the LEED design & construction review?
11 John Neville
President
Sustainable Arizona
Thu, Jan 23, 2014
Pilot Credit 34 Update
in Pilot Credit 34: Design for Adaptability
10 Sandy Chung
Senior Associate, Senior Designer
TCA Architects
Wed, Jan 22, 2014
waste management by bedroom vs sf
in Homes-v4: Construction waste management
1 Elizabeth Eason
principal architect
Elizabeth Eason Architecture LLC
Wed, Jan 22, 2014
RE: FSC Wood type and certification
in CS 2009 MRc6: Certified Wood
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jan 21, 2014
RE: Aren't Corrections only supposed to be published in Apr and Oct?
in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Apr 5, 2014
RE: Case for existing parking
in ND-v2009: Reduced parking footprint
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Jan 17, 2014
Low-Emitting and Fuel-Efficient Bus and Maintenance Fleet
in Schools 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
43 Mary Petrovich
Senior Sustainability Associate
Center for Maximum Potential Building Systems
Thu, Jan 16, 2014
RE: 62MZ calculator in version 4 LEED
in NC-v4: Minimum indoor air quality performance
2 Dylan Connelly
Mechanical Engineer
Integral Group
Wed, Jan 15, 2014
Concepts
in Healthcare-v2009: Water use reduction - measurement and verification
9 Alicia Silva
CEO
Revitaliza consultores
Wed, Jan 15, 2014
RE: Alternatives for Option 1. material ingredient reporting
in NC-v4: Building product disclosure and optimization - material ingredients
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jan 15, 2014
RE: Medical equipment not using process water
in Healthcare-v2009: Minimize potable water use for medical equipment cooling
7 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, Jan 15, 2014
RE: Calculating unobstructed operable window area of top hung window
in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
67 Dylan Connelly
Mechanical Engineer
Integral Group
Tue, Jan 14, 2014
RE: Bank
in Schools 2009 SSc2: Development Density and Community Connectivity
14 Todd Bundren
Associate
Lawrence Group
Tue, Jan 14, 2014
RE: combining SSc7.1 and 7.2
in CS 2009 SSc7.1: Heat Island Effect—Nonroof
46 Crissy Tsai
Sustainability Coordinator
Webcor Builders
Mon, Jan 13, 2014
RE: Weird Things at USGBC
in LEED Fellow Yudelson to Lead Rival Green Globes
14 Bill Swanson
PE, LEED AP
Integrated Architecture
Mon, Jan 13, 2014
RE: 100-year flood and nonconveyance area of river
in ND-v2009: Floodplain avoidance
13 Regina Ng
Mon, Jan 13, 2014
RE: LEED GA
in Video: LEED AP Credential Maintenance
49 Mohamed El Mallah
LEED AP
Sun, Jan 12, 2014
RE: IEQc8.2 Exemplary Performance
in CS 2009 IEQc8.2: Daylight and Views—Views
45 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Sun, Jan 12, 2014
RE: Baseline of NPDc8
in ND-v2009: Transportation demand management
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Jan 10, 2014
RE: Private versus public lavs
in Healthcare-v2009: Water use reduction
11 Mara Baum
Healthcare Sustainable Design Leader
HOK
Thu, Jan 9, 2014
Title Comments Most Recent Post
RE: Different sources
in CS 2009 MRc5: Regional Materials
19 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: synergy with SSc5.1
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: VOC Budget Process - If you make a mistake, you can still get it
in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings
78 Walter Currin
Project Architect
SHW Group
Fri, Dec 20, 2013
RE: Documentation for DES systems?
in NC v2.2 EAc3: Enhanced Commissioning
51 Scott Bowman
Principal - Corporate Sustainability Leader
KJWW Engineering Consultants
Fri, Dec 20, 2013
RE: Does this credit apply for dorms?
in NC v2.2 EQc7.1: Thermal Comfort—Design
26 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: LCI datasets
in Pilot Credit 63: Whole Building Life Cycle Assessment
11 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: SSpc16 - Rainwater Management
in Pilot Credit 16: Rainwater Management
14 Michael DeVuono
Senior Staff Designer
T&M Associates
Fri, Dec 20, 2013
RE: Background Noise Measurements
in Schools 2009 IEQp3: Minimum Acoustical Performance
136 Daniel Hicks
Daniel Hicks, E.I., INCE
Geiler & Associates
Thu, Dec 19, 2013
RE: CDHP Testing
in Healthcare-v2009: Furniture and medical furnishings
19 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Dec 19, 2013
RE: Building reuse for parking deck?
in Healthcare-v2009: Building reuse - maintain existing walls, floors and roof
3 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Dec 19, 2013
RE: Previously developed?
in ND-v2009: Preferred locations
11 Michael DeVuono
Senior Staff Designer
T&M Associates
Thu, Dec 19, 2013
RE: Can A project Team Perform that credit
in Schools SSp2: Environmental Site Assessment
52 Larry Sims
Principal
Studio4, LLC
Tue, Dec 17, 2013
RE: LTc1. possible 18 points
in CI-v4: LEED for neighborhood development location
3 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Fri, Dec 13, 2013
RE: Bike Lanes "in two directions"
in Schools 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
33 Nicole Ferrini
via T&M Associates
Fri, Dec 13, 2013
RE: Utility tariff - an accepted DR strategy?
in Data Centers-NC-v4: Demand response
2 Marcus Sheffer
LEED Fellow
7group
Fri, Dec 13, 2013
RE: LEED-Healthcare: EAc5 M&V Exemplary Performance
in Healthcare-v2009: Measurement and verification
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Dec 9, 2013
RE: Do Requirements Apply?
in Retail–NC-v2009: Low-emitting materials
3 Carly Ruggieri
Senior Sustainability Consultant
Steven Winter Associates, Inc.
Fri, Dec 6, 2013
RE: Proper way to apply ASHRAE 62.1 to baseline model?
in Schools 2009 EAp2: Minimum Energy Performance
49 Marcus Sheffer
LEED Fellow
7group
Wed, Dec 4, 2013
RE: Qualifying Third party certification examples?
in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
8 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Tue, Dec 3, 2013
RE: Development Density and Community Connectivity
in NC v2.2 SSc2: Development Density and Community Connectivity
28 Gulcin Tanil
Tue, Dec 3, 2013
Title Comments Most Recent Post
RE: LEED for hotels
in Hotels - Must We Use New Retail Program?
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Dec 17, 2010
post under IEQc4.2
in Paint VOC limits
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 14, 2010
RE: BUilding area to site area ratio
in EB-OM PIf2- Project Summary Details
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
Proposed changes to the LEED AP credit
in What's behind the proposed changes to the LEED AP credit for LEED 2012?
1 James Green
VP Engineering
HInes
Wed, Dec 8, 2010
MEP components
in Include plumbing components to recycled content
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
RE: Does anyone have any thoughts
in BREEAM as an alternative green building system?
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 7, 2010
RE: Same here. Its been about 15
in Pilot Credit Survey completion e-mail
3 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Dec 1, 2010
Treatment of District or Campus Thermal Energy
in DOes any one know if the USGBC produced the Addenda for LEED 2009 Districit Energy guidance?
1 Scott DeGaro
Sustainability Administrator
Barge Waggoner Sumner & Cannon, Inc.
Tue, Nov 30, 2010
Thank you
in Want to share LEED documentation tools or documents?
1 Terry Squyres
Principal
GWWO Inc./Architects
Wed, Nov 24, 2010
Ergonomic Design
in Ergonomic Design for an Innovation Point
1 Simon S.
SL+A International, Taipei
Thu, Nov 18, 2010
RE: 2009 CI IEQ Credit 5 Entryway System
in CI 2009 IEQ Credit 5 Entryway Systems
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Nov 17, 2010
RE: change in scope
in Extension of Mechanical Duct work
2 Kendrick Richardson
LSY Architects
Tue, Nov 16, 2010
LEED boundary
in Remote Parking lot, pre-existing LEED project
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 16, 2010
MPR#6
in Sharing energy/water useage data
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Nov 15, 2010
RE: LEED documentation in English
in Documentation
3 Katsiaryna Mazur
ISG OLSON, CJSC
Mon, Nov 15, 2010
certifying the process
in LEED for Water/Wastewater Treatment Facilities?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Nov 13, 2010
runs the gamut
in Taking Advantage of Utility Incentives?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 12, 2010
RE: out buildings and LEED
in Question about multiple buildings & LEED
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Nov 12, 2010
New LEED 2009 Addenda Released - November 2010 - by Tristan Roberts
Mon, Nov 8, 2010
post to credit forum
in Development Density declaration (in buildings per hectare)
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Nov 4, 2010
Title Votes Comments Most Recent Post
RE: pest management control
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
85 68 Pablo Fortunato Suarez
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
Fri, Jul 16, 2010
RE: Outdoor Air Contamination
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
85 216 Dylan Connelly
Mechanical Engineer
Integral Group
Thu, Jan 10, 2013
RE: Project information forms
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
85 503 Kristina Bach
CORE Steward
Cooper Carry
Tue, Jan 15, 2013
RE: Staging Flush Out.
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
85 137 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Mon, Sep 27, 2010
RE: Interior lighting for residential project
in NC 2009 SSc8: Light Pollution Reduction
85 488 Bill Swanson
PE, LEED AP
Integrated Architecture
Tue, Sep 28, 2010
footprint clarification
in PIf2: Project Summary Details
85 148 Jennifer Ratts
P.E. LEED AP
AMEC Earth and Enviornemntal
Fri, Nov 30, 2012
10 basic services inside a mall in front of LEED project
in CS 2009 SSc2: Development Density and Community Connectivity
85 34 Michael E. Edmonds-Bauer
Edmonds International
Wed, Dec 19, 2012
Raised floor with gypsum panel - exempted from FloorScore?
in CS 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
85 67 William Wong
Tue, Dec 18, 2012
RE: Exemplary Peformance
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
85 67 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 21, 2013
RE: Exterior lighting - option 3
in EBOM 2009 SSc8: Light Pollution Reduction
85 103 Bill Swanson
PE, LEED AP
Integrated Architecture
Tue, Sep 14, 2010
Pool Complex EAp2
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
85 441 Emilio Rovira
Sustainability Planner
DoD US Marine Corps
Mon, Nov 19, 2012
RE: Permanent entryways on the roof
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
85 81 Sarah Corbitt
Assoc AIA, LEED AP BD+C
LS3P
Wed, Oct 6, 2010
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
85 85 Jennifer Jewell
Project Manager/Project Architect
Design Collective, Inc.
Wed, Sep 8, 2010
Existing AHU serves more than the LEED tenant space- what to do?
in CI 2009 IEQc5: Indoor Chemical and Pollutant Source Control
85 78 Kathy Buck
Senior Project Manager
Neumann/Smith Architecture
Thu, Aug 5, 2010
RE: Metering
in EBOM 2009 WEc1: Water Performance Measurement
85 75 Natalie Bodenhamer
Associate
Altura Associates, Inc.
Thu, Sep 16, 2010
RE: No smoking policy in urban area and the 25' rule.
in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
85 54 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 26, 2010
EQc6.1 for enclosed offices
in CI 2009 IEQc6.1: Controllability of Systems—Lighting
85 50 Paladino &Company
Paladino and Company
Mon, Sep 27, 2010
RE: Waste Hauler sorts off-site
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
85 64 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Sep 23, 2010
RE: Batteries - annual actual diversion performance verification
in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
85 60 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Mon, Feb 21, 2011
RE: Documented benefits as a result of LEED for Existing Buildings
in LEED-EBOM: Eight Steps to Success
85 31 Yun Day
Firm Administrator
Shlemmer+Algaze+Associates
Wed, Sep 29, 2010
Title Comments Most Recent Post
Average Pressure Differential Calculation - Underground Parking
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
81 Nathan Lee
Project Engineer
SGS Korea
Fri, Apr 26, 2013
Greywater recirculated
in NC 2009 WEp1: Water Use Reduction—20% Reduction
544 MM K
Thu, Apr 25, 2013
invidually buildings ceritifcation vs multiple buildings/ campus
in New LEED Guidance for Campuses and Multiple Buildings
468 Muhammad Faisal Azizullah Jaffar
Sustainability Consultant
Ramboll
Wed, Apr 24, 2013
WEc2 vs. Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
52 Jiri Dobias
Tue, Apr 23, 2013
EAp2/EAc1 - Case 2 Option 2b
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
441 Peter Locke
Sustainability Consulting Director
McKinstry
Fri, Apr 19, 2013
Interior vegetation
in NC 2009 WEc1: Water Efficient Landscaping
316 Albert Sagrera
Architect
Societat Organica
Fri, Apr 19, 2013
suspiciously high savings in auxillary power
in CS 2009 EAc1: Optimize Energy Performance
237 shashank jain
Environmental Analyst
BDSP Partnership
Fri, Apr 19, 2013
Cafeteria/Training Room: Regurlarly Occupied Area?
in PIf3: Occupant and Usage Data
169 Alejandro Rivera Rivera
Sustainability Coordinator
Studio Domus
Thu, Apr 18, 2013
Spaces smaller than 3000ft2
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Tue, Apr 16, 2013
Providing verification that there will be side stream filtration
in Pilot Credit 17: Cooling Tower Water Use
26 Sara Greenwood
Green Building Consultant
Cadmus Group
Mon, Apr 15, 2013
Current Regs?
in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases
7 Robert Millspaugh
Fri, Apr 12, 2013
New USGBC searchable database..
in Key LEED 2009 Interpretations
4 Lewis Hewton
Cundall
Thu, Apr 11, 2013
Test
in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
67 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Thu, Apr 11, 2013
Evapotranspiration rate units?
in NC 2009 WEc1: Water Efficient Landscaping
316 E H
Sustainability Architect
Thu, Apr 11, 2013
Flush-out Spreadsheet?
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
137 James Houston
Thu, Apr 11, 2013
"Keep Calm and Do Your Homework"
in GBCI Invites Direct Inquiries—But Do Your Homework First
16 deborah lucking
associate
fentress architects
Wed, Apr 10, 2013
Air Curtain for Building in Climate Zone 3A
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Shenhao Li
Atkins
Mon, Apr 8, 2013
Calculating FTE- LEED for Healthcare
in PIf3: Occupant and Usage Data
169 Catherine Blakemore
Architect, LEED AP BC+D
HOLT Architects
Mon, Apr 8, 2013
Hi all, (I posted this
in LEED Rating System Selection Q&A
559 Diaa Madkour
Architect
Sun, Apr 7, 2013
Full list of
in Key LEED 2009 Interpretations
4 Michael E. Edmonds-Bauer
Edmonds International
Sat, Apr 6, 2013

Copyright 2014 – BuildingGreen, Inc.