LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Residential building above
in Retail-CI-v4: Environmental Tobacco Smoke Control
3 Francisco Sanchez Arroyo
hexxan
Fri, Dec 12, 2014
Spain
Credit for EPDs in LEED 2009
in NC-2009: MR Credit Category Pilot ACP
1 Gunnar Baldwin
Fri, Dec 12, 2014
RE: International Project- 2 yr, 24 hr design storm intensity
in EBOM 2009 SSc6: Stormwater Quantity Control
64 Samantha Longshore
Sustainability Advisor
Transwestern
Fri, Dec 12, 2014
Through Connections
in ND-v4: Connected circulation network
1 Martine Desbois
Thu, Dec 11, 2014
Off-Street Parking Definition
in ND-v4: Reduced parking footprint
1 Martine Desbois
Thu, Dec 11, 2014
Development Density on a university campus
in CI 2009 SSc2: Development Density and Community Connectivity
105 Rhonda Franklin
Interior Designer
Architectural Vision Group
Thu, Dec 11, 2014
United States
RE: Measurement doubt
in EBOM 2009 SSc5: Site Development—Protect or Restore Open Habitat
91 Trista Little
Sustainability Manager
YR&G
Thu, Dec 11, 2014
RE: Lighting control in office space
in NC-v4: Interior lighting
10 Lauren Sparandara
Sustainability Manager
Google
Wed, Dec 10, 2014
Store
in Most Downloaded LEEDuser Documentation Templates, Calculators, and Samples
1 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Dec 10, 2014
RE: DEC - EBOM
in EBOM 2009 WEc4: Cooling Tower Water Management
63 Trista Little
Sustainability Manager
YR&G
Fri, Feb 13, 2015
RE: Commercial Kitchen
in EBOM 2009 MRc2: Sustainable Purchasing—Durable Goods
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Feb 13, 2015
RE: New wind turbines
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
97 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 10, 2014
Case 2 Option 2C EUI weather normalization tool
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
119 Jorng-ren Chern
CEO
Enertek Sustainable Design & Technology
Tue, Dec 9, 2014
Regional Priority credits worldwide
in NC-v4: Regional priority
6 Pooja Sannamni
Mon, Dec 8, 2014
RE: Survey Completion
in CI 2009 IEQc7.2: Thermal Comfort—Verification
20 April Brown
Projects Manager
Institute for the Built Environment
Mon, Dec 8, 2014
RE: Can a LEED NC certified building pursue now a LEED EBOM?
in EBOM-v4: Must use reasonable LEED boundaries
7 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Dec 8, 2014
RE: 2-seat Reception Area in Middle School
in Schools 2009 IEQc6.1: Controllability of Systems—Lighting
27 Carrie Webster
Moseley Architects
Fri, Dec 5, 2014
RE: FSC Invoice information for custom woodworking elements
in NC v2.2 MRc7: Certified Wood
162 Jason Grant
Principal
Jason Grant Consulting
Fri, Dec 5, 2014
RE: Shopping mall and Community Connectivity
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
29 Marcus Sheffer
LEED Fellow
7group
Thu, Dec 4, 2014
RE: Public vs Staff Entries
in Healthcare-v2009: Alternative transportation - public transportation access
5 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Thu, Dec 4, 2014
Title Comments Most Recent Post Location
RE: Efficiency First
in EBOM-v4: Outdoor water use reduction
4 Edward Malesevich
Sustainability Advisor
Transwestern Sustainability Services
Fri, Nov 21, 2014
NC-v4 LTc2: Sensitive land protection/Wetland Protection
in NC-v4: Sensitive land protection
3 Robyn Dowsey
Owner
Eco-Build Strategies LLC
Thu, Nov 20, 2014
United States
RE: Exemplary Performance ID point for 40% reduction.
in Schools 2009 WEc4: Process Water Use Reduction
60 Daniel Hersh
Architect
Breslin Ridyard Fadero Architects
Wed, Nov 19, 2014
United States
RE: Pilot Credit 88: LEED O+M Starter Kit
in NC-v4: Innovation
10 Charalampos Giannikopoulos
Founder
DCarbon
Wed, Nov 19, 2014
ACP and Regional Priority
in NC 2009 RPc1: Regional Priority
40 Joanna Yaghooti
Director of Sustainable Design
PageSoutherlandPage
Tue, Nov 18, 2014
United States
RE: Daylight Measurement Levels
in EBOM-v4: Daylight and quality views
4 Jill Dalglish, PE
Senior Engineer
Dalglish Daylighting
Mon, Nov 17, 2014
RE: Zinc Spray
in CS 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
87 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Fri, Nov 14, 2014
RE: 50% of the "building's" electricity -- for Retail??
in Retail–CI-v2009: Green power
6 Erica Downs
Sustainability & LEED Consultant
Fri, Nov 14, 2014
RE: ID credit in a hospital?
in Schools 2009 IEQc10: Mold Prevention
28 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, Nov 14, 2014
RE: Electrostatic paint and VOC limits
in CI 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
76 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Thu, Nov 13, 2014
RE: Accused synergies between views documentation & other EQ points
in CS 2009 IEQc8.2: Daylight and Views—Views
59 Todd Reed
Daylight Designer
7group
Thu, Nov 13, 2014
Data Center in Portfolio Manager
in Data Centers-EBOM-v4: Minimum energy performance
1 Charalampos Giannikopoulos
Founder
DCarbon
Wed, Mar 18, 2015
RE: Convert g/bhp to ppm
in Healthcare-v2009: Community contaminant prevention - airborne releases
21 Nate Tsang
Graduate Energy Engineer
Arup
Thu, Nov 13, 2014
RE: Air quality testing for targeted chemicals
in Homes-v4: Contaminant control
2 Russ Pellegrino
Technical Director
Centek Laboratories, LLC
Thu, Nov 13, 2014
RE: In-Patient Rooms Exempt from SSc8?
in Healthcare-v2009: Light pollution reduction
17 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Nov 13, 2014
LEED EA C4 Calculator
in NC v2.2 EAc4: Enhanced Refrigerant Management
23 Achyut Kulkarni
Fri, Feb 13, 2015
India
RE: Formaldehyde resins in mineral wool insulation and firesafing
in Healthcare-v2009: Low-emitting materials
55 Susan Walter
Sr Project Architect
Wilmot/Sanz
Tue, Nov 11, 2014
ventilation flow rate
in CI 2009 IEQc2: Increased Ventilation
11 ilkyaz ceren güçlü
civil engineer
SPC Solutions
Mon, Nov 10, 2014
Turkey
Natural ventilation requirements for Basement
in NC v2.2 EQp1: Minimum IAQ Performance
58 S S
Mon, Nov 10, 2014
India
RE: Expected volume and collection frequency
in NC v2.2 MRp1: Storage and Collection of Recyclables
9 Ashley Morgan
Thu, Nov 6, 2014
Title Comments Most Recent Post Location
RE: ID Credit for Dual Certification
in Green Globes Q&A
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 4, 2012
RE: Not much of anything
in USGBC LEED EBOM policy model 2009
5 Paulina Marinkovic
Sustainability Manager LEED AP O&M
Samba Energy
Fri, Aug 31, 2012
RE: Does this mean state owned
in Georgia Bans LEED Over Certified Wood Credits
2 Paula Melton
Managing Editor
BuildingGreen, Inc.
Fri, Aug 24, 2012
RE: Activity Date in CMP
in GBCI now reviewing CMP hours within 48 hours of entry
11 Kristina Bach
Sustainability Specialist
Wed, Aug 22, 2012
RE: Thanks Andrew!
in LEED Online and how to make it run FAST on Google Chrome
4 Maura Adams
Environmental Stewardship Manager
Wed, Aug 15, 2012
RE: LEED Certified or Certifiable?
in LEED Certified or Certifiable? Architects Make the Case for Earning the Plaque
9 Sandeep Goswami
COO
Fountain Head II
Sat, Aug 11, 2012
Thanks for the responses so
in Student looking for LEED users to complete a questionnaire on the IgCC and LEED
1 Michael Zagorski
Thu, Aug 2, 2012
RE: post-event Q&A
in Video: Top-20 LEED-EBOM Documentation Mistakes—And How to Avoid Them
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jul 27, 2012
RE: suggestions
in Breech of Protocol by GBCI and Project Administrator Changes
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jul 27, 2012
RE: Contaminants of Concern & Green Globes
in Chemical Industry Attacks LEED: We Check the Facts
12 Hernando Miranda
Owner
Soltierra LLC
Thu, Jul 26, 2012
RE: The AHPBC
in The New Anti-LEED?
2 J Michael Pearson
Director of Engineering
Genelco, Inc
Wed, Jul 25, 2012
RE: change LPE info
in Change LPE
4 Peter Warren
Principal
Warren Architecture
Tue, Jul 24, 2012
RE: And the winning number is???
in Tristan's thumbs up rating?
8 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 23, 2012
Green Globes Guiding Principles Certification
in Government Hears Overwhelming Support for LEED
1 John Chyz
Commissioning Authority
The Cross Creek Initiative, Inc.
Fri, Jul 13, 2012
RE: LEED EBOM: India
in assistance for overseas projects
6 sanjay vashishtha
Dr.
Firstgreen Consulting
Thu, Jul 12, 2012
First LEED-ND Platinum Certification for NYC at Columbia University - by Erin Weaver
Wed, Jul 11, 2012
LEED for Existing Homes
in LEED for EB- O&M for Homes
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 2, 2012
LEED “Certifiable” Specifications: 4 Approaches - by Tristan Roberts
Wed, Jun 27, 2012
ACP Process : BREEAM equivalency
in LEED Now Recognizes Energy Credits from BREEAM
1 CHRISTOPHE MATHIEU
Sustainable Design And Construction Consultants, Paris, France
greenaffair
Mon, Jun 25, 2012
RE: What should USGBC do with the extra time to ensure success?
in LEED 2012 Postponed to 2013, Renamed LEED v4
28 Larry Sims
Principal
Studio4, LLC
Thu, Jun 14, 2012
Title Comments Most Recent Post Location
Borrowing credits from other rating systems
in CI-v4: Innovation
1 Breck Baird
Architect
SmithGroupJJR
Fri, Oct 17, 2014
Can a hotel+residential tower achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
101 Juhi Jain
Project Consultant
Thornton Tomasetti / Sustainability
Fri, Oct 17, 2014
RE: Future Expansion
in NC 2009 SSc5.2: Site Development—Maximize Open Space
173 Ellen Mitchell
Director of Sustainability
HKS, Inc.
Fri, Oct 17, 2014
school playgrounds
in Schools 2009 SSc7.1: Heat Island Effect—Nonroof
21 Mike Halcom
Principal
Halcom Consulting LLC
Fri, Oct 17, 2014
renovation and addition: effect on site boundary
in MPR3: Must use a reasonable site boundary
208 Ramana Koti
Building Performance Analyst
Lord, Aeck & Sargent
Fri, Oct 17, 2014
United States
Racks for visitors in residential project
in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms
251 LEED Consultant
Green Building and Alternative Energy
Thu, Oct 16, 2014
Core and Shell project with public bike scheme adjacent
in CS v4: Access to quality transit
1 Sean Hogan
LEED AP
RKD Architects
Thu, Oct 16, 2014
Ireland
Vista Users Out of Luck
in Living with LEED Online - quirks, bugs and hiccups
137 Cynthia Kaplan
Principal
cmk LEED
Wed, Oct 15, 2014
United States
24 Hour Retail
in Retail–NC-v2009: Light pollution reduction
1 Daniel Zaneto
MMA Architects
Wed, Oct 15, 2014
RE: A site with large building footprint
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
231 Michael Smithing
Director - Green Building Advisory
Colliers International
Wed, Oct 15, 2014
RE: Ventilation rates for manufacturing facilities
in EBOM 2009 IEQp1: Minimum Indoor Air Quality Performance
332 Grace Ming
Senior ESD Consultant
Tue, Oct 14, 2014
Pilot vs v4 Demand Response - Full Automation
in Pilot Credit 8: Demand Response
30 Jennifer Wehling
Director of Sustainability
Lionakis
Mon, Oct 13, 2014
United States
No new parking
in NC v2.2 SSc4.4: Alternative Transportation—Parking Capacity
40 Amanda L
Mon, Oct 13, 2014
United States
RE: District Cooling
in NC 2009 EAc4: Enhanced Refrigerant Management
118 Melissa Kelly
Sustainability Coordinator
YR&G
Mon, Oct 13, 2014
School with unusually large amount of artificial turf
in Schools 2009 SSc5.2: Site Development—Maximize Open Space
15 Helen Kessler
President
HJKessler Associates
Sun, Oct 12, 2014
United States
ACP and Regional Priority
in NC 2009 RPc1: Regional Priority
40 Joanna Yaghooti
Director of Sustainable Design
PageSoutherlandPage
Fri, Oct 10, 2014
United States
Certifying New Addition, excluding Existing Building
in MPR2: Must be a complete, permanent building or space
136 Kris Phillips
Architect
Arcadis
Fri, Oct 10, 2014
How many people per control
in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
29 Matthew Catterall
Cotera+Reed Architects
Fri, Oct 10, 2014
Confusion over tile
in Schools IEQc4.3: Low-Emitting Materials—Flooring Systems
29 Crista Shopis
Senior Engineer, LEED AP
Taitem Engineering
Fri, Oct 10, 2014
Recycled cork can contribute to achieve MRc6?
in NC 2009 MRc6: Rapidly Renewable Materials
50 Pedro Ribeiro
Director of Sustainability
Edifícios Saudáveis Consultores
Fri, Oct 10, 2014
Portugal
Title Comments Post date Most Recent Postsort icon Location
Innovation point for NCv3?
in NC-v4: Building life-cycle impact reduction
23 Erica Downs
Sustainability & LEED Consultant
Thu, Jan 15, 2015
2015-01-15 17:04 United States
Complex projects benefit from turn-key waste mgmt services
in NC-2009: Construction and demolition waste management
11 Joanna Switzer
Thu, Jan 15, 2015
2015-01-15 14:58 United States
GRI Sustainability Reports
in Pilot Credit 53: Responsible Sourcing of Raw Materials
6 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Thu, Jan 15, 2015
2015-01-15 14:04 United States
Certifying an addition to an existing building with LEED NC
in PIf1: Minimum Program Requirements
116 Veronica Reed
Founder
SDSARCH CIA. LTDA.
Thu, Jan 15, 2015
2015-01-15 11:48 Ecuador
No longer required to complete Design prereqs before review?
in NC 2009 EAp2: Minimum Energy Performance
2,774 Susan Di Giulio
Project Manager
Zinner Consultants
Wed, Jan 14, 2015
2015-01-14 23:32 United States
LEED O&M on a portion of a building
in EBOM-v4: Must comply with project size requirements
4 LEED Consultant
Green Building and Alternative Energy
Wed, Jan 14, 2015
2015-01-14 20:12 Mexico
PIf2
in PIf2: Project Summary Details
193 Shaun Andriano
Project Manager
C2 Design Architecture
Wed, Jan 14, 2015
2015-01-14 17:12 United States
low emitting materials calculator
in NC-v4: Low emitting materials
94 CAROLINE PIN
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
Wed, Jan 14, 2015
2015-01-14 14:30 France
NC V4: Thermal Comfort
in NC-v4: Thermal comfort
4 Erik Gutierrez
Mechanical Designer
C&J Technical Solutions and Services, Inc.
Wed, Jan 14, 2015
2015-01-14 12:09 United States
Compressor replacement + R422D refrigerant
in EBOM 2009 EAc5: Enhanced Refrigerant Management
40 Norbert Szircsak
Wed, Jan 14, 2015
2015-01-14 05:41 Hungary
Water Heater
in CI 2009 EAc1.4: Optimize Energy Performance—Equipment and Appliances
275 Izumi Takayama
Arup
Wed, Jan 14, 2015
2015-01-14 05:28 Japan
Cold C&S - No HVAC
in CS 2009 EAc1: Optimize Energy Performance
265 Scott Johnson
Tue, Jan 13, 2015
2015-01-13 16:22 United States
We are in the process of
in EBOM-v4: Indoor water use reduction
15 LEED Consultant
Green Building and Alternative Energy
Tue, Jan 13, 2015
2015-01-13 15:23 Mexico
EBOM on Core and Shell (not LEED) building
in EBOM-v4: Ongoing purchasing and waste policy
11 LEED Consultant
Green Building and Alternative Energy
Tue, Jan 13, 2015
2015-01-13 15:13 Mexico
IAQ Assessment - Air Testing
in CI-v4: Indoor air quality assessment
1 Harvard University Green Building Services
Tue, Jan 13, 2015
2015-01-13 12:10 United States
The vent calcs indicate a total area significantly lessthan Plf2
in NC-2009 IEQp1: Minimum IAQ Performance
885 Ahmet D
Tue, Jan 13, 2015
2015-01-13 11:15 United States
PBE Edifica for EAp2 compliance
in CS 2009 EAp2: Minimum Energy Performance
924 Mauricio Torres
Architect
Sustentativa
Tue, Jan 13, 2015
2015-01-13 11:00 Brazil
Deadline for Appeal
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
658 Marcio Alberto Casado Pereira
Tue, Jan 13, 2015
2015-01-13 08:46 Brazil
Polishing Powder
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
486 Omar ElRawy
Building Engineer, LEED AP BD+C
EA Building Consultants
Tue, Jan 13, 2015
2015-01-13 08:27 Egypt
Existing building, physically sepatated from new construction
in PIf2: Project Summary Details
193 FABIO VIERO
Head of Sustainability
Manens-Tifs s.p.a.
Tue, Jan 13, 2015
2015-01-13 05:44 Italy

Copyright 2015 – BuildingGreen, Inc.