LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: RP credits for International Projects
in CI-v4: Regional priority
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 14, 2014
RE: Performance period falls in between 2 different years
in EBOM 2009 IOc3: Documenting Sustainable Building Cost Impacts
28 Gabriel Frasson
Project Manager
OTEC
Mon, Jul 14, 2014
Extension past v2.2 Sunset date June 27, 2015?
in Upgrade to LEED 2009? How to Choose for Your Project
16 Rodger Kuo
Architect
Port of Los Angeles
Fri, Jul 11, 2014
Non Regularly Occupied Spaces
in CI 2009 IEQc1: Outdoor Air Delivery Monitoring
29 James Keohane, PE LEED BD+C CxA CPMP
Sustainability and Commissioning Consultant
Sustainable Engineering Concepts, LLC
Wed, Jul 9, 2014
RE: Outdoor Airflow Measurement
in NC v2.2 EQc1: Outdoor Air Delivery Monitoring
19 Eduardo Carlo
Energy Engineer
UPM Group
Wed, Jul 9, 2014
RE: Rational Method
in CS 2009 SSc6.1: Stormwater Design—Quantity Control
35 MKK LEED
Wed, Jul 9, 2014
CS MPR2: reclaimed land without development previously
in MPR2: Must be a complete, permanent building or space
3 Vivien Wong
Parsons Brinckerhoff
Wed, Jul 9, 2014
RE: Regional- Additives Taken into Consideration?
in CS 2009 MRc5: Regional Materials
28 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Tue, Jul 8, 2014
RE: Licensed Professional Exemption (LPE) - outside of USA
in Licensed Professional Exemption
19 Sylvain laporte
GASD-Co
Tue, Jul 8, 2014
RE: calculating FTE
in Schools-NC-v4: Indoor water use reduction
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 7, 2014
RE: AISI 307 - stainless steel
in Healthcare-v2009: Furniture and medical furnishings
22 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M
Revitaliza Consultores
Mon, Jul 7, 2014
Residential Type Sinks in Middle School Classroom
in Schools 2009 WEp1: Water Use Reduction—20% Reduction
35 Sara Zoumbaris
Sustainable Design Consulting
Mon, Jul 7, 2014
LEED HC 2009 ID P1 and c3
in Healthcare-v2009: Integrated project planning and design
1 Usama Eita
Sat, Jul 5, 2014
RE: Reusing IO credits for recertification
in Recertification
58 Barry Giles
Founder & CEO, LEED Fellow
BuildingWise LLC
Thu, Jul 3, 2014
Carpool trips for regular building occupants
in EBOM-v4: Alternative transportation
1 Tom Cosgro
Thu, Jul 3, 2014
RE: Concrete Sediment Control
in NC v2.2 SSp1: Construction Activity Pollution Prevention
33 michelle bombeck
Project Assistant
O'Brien & Company
Wed, Jul 2, 2014
brownfield confusion
in NC-v4: High priority site
1 Larry Sims
Principal
Studio4, LLC
Tue, Jul 1, 2014
RE: Non english version
in CS 2009 SSc9: Tenant Design and Construction Guidelines
35 Daniel LeBlanc
Senior Sustainability Manager
YR&G
Tue, Jul 1, 2014
RE: Closed Pilot Credits
in Using the LEED Pilot Credit Library
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jun 30, 2014
LEED Membership Statistics Tool
in LEED App Store Coming Soon – What's on Your Wish-List?
4 Spencer Kim
Mon, Jun 30, 2014
Title Comments Most Recent Post Location
RE: Landscape Architect Statement template
in ND-v2009: Tree-lined and shaded streets
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Jun 10, 2014
Commingled Collection
in Schools 2009 MRp1: Storage and Collection of Recyclables
13 Adam Musante
KCBA Architects
Tue, Jun 10, 2014
Prefered Parking Requirement
in Healthcare-v2009: Alternative transportation - parking capacity
1 Todd Bundren
Director of Sustainabilty - Architectural Project Manager
Lawrence Group
Tue, Jun 10, 2014
RE: Annual Maintenance Cost of White Roof
in EBOM 2009 SSc7.2: Heat Island Reduction—Roof
67 Ben Stanley
Sustainability Manager
YRG sustainability
Tue, Jun 10, 2014
RE: Prerequisite
in NC-v4: Integrative process
3 John Beeson
Chief Mystic in Resident
Catalyst Partners
Tue, Jun 10, 2014
Hot Humid, Multi Family Compliance
in Mid-Rise v4: Ventilation
1 Jason Biondi
Managing Director
Energy Cost Solutions Group
Mon, Jun 9, 2014
RE: Green Walls - vertical gardens
in NC v2.2 SSc5.1: Site Development—Protect or Restore Habitat
60 Jamison Hill
Energy Engineer/LEED Consultant
Community Environmental Center
Fri, Jun 6, 2014
Air Purifiers? Dehumidifiers?
in EBOM 2009 IEQp3: Green Cleaning Policy
71 Nate Gillette
Director
Natura Architectural Consulting LLC
Fri, Jun 6, 2014
RE: Case study for preliminary analysis
in CS v4: Integrative process
2 Marcus Sheffer
LEED Fellow
7group
Fri, Jun 6, 2014
RE: EQc3, EQc5 and filtration requirements
in NC v2.2 EQc3.1: Construction IAQ Management Plan—During Construction
19 Matthew Martin
Assistant Site Superintendent
QBS, Inc.
Thu, Jun 5, 2014
RE: Projects outside the US
in CI 2009 EAc4: Green Power
95 MM K
Thu, Jun 5, 2014
RE: EA Credit 5.1: Base Building Sub-metering
in CS 2009 EAc5.1: Measurement and Verification—Base Building
94 Marcus Sheffer
LEED Fellow
7group
Wed, Jun 4, 2014
Option1 Electric Vehicle Charging vs. Option2 Liquid/Gas/Battery
in NC-2009: Green vehicles
14 Maggie Pipek
Wed, Jun 4, 2014
RE: LEED ND Green Buildings
in ND-v2009: Certified green building
16 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Jun 4, 2014
RE: SSc8 and EAc1 Disconnect?
in Schools 2009 EAc1: Optimize Energy Performance
41 Marcus Sheffer
LEED Fellow
7group
Tue, Jun 3, 2014
LEED V3 GA exam Vs LEED V4 GA Exam
in NC-v4: Must be in a permanent location on existing land
8 Manzoor Ilahi
Tue, Jun 3, 2014
Commissioning with Volume Build Projects
in Retail-CI-v4: Fundamental commissioning and verification
1 Robin Dukelow, LEED AP BD+C
Sustainability Consultant; Project Manager
Henderson Engineers, Inc.; Sustainable Design Consulting, LLC
Mon, Jun 2, 2014
RE: Project Incomplete Before End of Performance Period
in EBOM 2009 MRc3: Sustainable Purchasing—Facility Alterations and Additions
76 Terry Gorski
via GBD Architects
Fri, May 30, 2014
RE: LEED CI V2012
in CI 2009 IDc2: LEED Accredited Professional
18 Jaewan Lee
Consultant
SGS Korea
Thu, May 29, 2014
Utility Trenches OK Beyond Boundary?
in MPR3: Must use a reasonable site boundary
1 Larry Turbes
Architect
TKDA
Thu, May 29, 2014
Title Comments Most Recent Post Location
RE: The AHPBC
in The New Anti-LEED?
2 J Michael Pearson
Director of Engineering
Genelco, Inc
Wed, Jul 25, 2012
RE: change LPE info
in Change LPE
4 Peter Warren
Principal
Warren Architecture
Tue, Jul 24, 2012
RE: And the winning number is???
in Tristan's thumbs up rating?
8 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 23, 2012
Green Globes Guiding Principles Certification
in Government Hears Overwhelming Support for LEED
1 John Chyz
Commissioning Authority
The Cross Creek Initiative, Inc.
Fri, Jul 13, 2012
RE: LEED EBOM: India
in assistance for overseas projects
6 sanjay vashishtha
Dr.
Firstgreen Consulting
Thu, Jul 12, 2012
First LEED-ND Platinum Certification for NYC at Columbia University - by Erin Weaver
Wed, Jul 11, 2012
LEED for Existing Homes
in LEED for EB- O&M for Homes
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Jul 2, 2012
LEED “Certifiable” Specifications: 4 Approaches - by Tristan Roberts
Wed, Jun 27, 2012
ACP Process : BREEAM equivalency
in LEED Now Recognizes Energy Credits from BREEAM
1 CHRISTOPHE MATHIEU
Sustainable Design And Construction Consultants, Paris, France
greenaffair
Mon, Jun 25, 2012
RE: What should USGBC do with the extra time to ensure success?
in LEED 2012 Postponed to 2013, Renamed LEED v4
28 Larry Sims
Principal
Studio4, LLC
Thu, Jun 14, 2012
RE: LEED Specifications
in Top Six Things LEED Consultants Do Wrong in Specs
5 Hernando Miranda
Owner
Soltierra LLC
Wed, Jun 20, 2012
Dan,
in LEED Submittal Forms, Beta to v3
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Tue, Jun 12, 2012
RE: LEED Online Access to Certified Projects
in LEED Online Access to Certified Projects
8 Matt Bartner
Wed, May 30, 2012
RE: 4th comment period open
in LEED 2012 – 3rd Public Comment – Guide to Key Changes and Forum
107 Barry Giles
Founder & CEO, LEED Fellow
BuildingWise LLC
Tue, May 15, 2012
RE: LEED certification in China
in Hi from China LEED engineer
3 Hernando Miranda
Owner
Soltierra LLC
Sat, May 5, 2012
retaining LEED certification
in Loss of LEED Certification after renovating?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 1, 2012
Reference Guide E-Books need to be editable or updated by USGBC
in LEED 2012 Behind the Scenes - follow up conversation
4 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Tue, May 1, 2012
RE: Surrounding Density and Diverse Uses
in LEED 2012 – 3rd Public Comment – LT (Location and Transportation) Section
16 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Fri, Apr 27, 2012
RE: Fundamental Commissioning
in LEED 2012 – 2nd Public Comment – Performance (PF) Section
9 Daniel Forino
Sustainability Engineering
Horizon Engineering Associates
Thu, Apr 19, 2012
RE: GSF with demolition
in Demolition of Existing Building
4 Clint Newton
Project Manager
Spillman Farmer Architects
Wed, Apr 11, 2012
Title Comments Most Recent Post Location
Golf Course Clubhouse Project Advice
in EBOM 2009 EAc1: Optimize Energy Efficiency Performance
118 Johanna Hendricks
Fri, May 23, 2014
United States
RE: Alternative Compliance Path Outside the US
in CI 2009 MRc5: Regional Materials
92 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 23, 2014
Whole building LCA - embodied and operational impacts
in Pilot Credit 63: Whole Building Life Cycle Assessment
12 Henrique Mendonca
Life Cycle Engineer
eTool
Thu, May 22, 2014
RE: Active controls and thermal control
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
324 Terry Schroeder
Senior Project Engineer
Whitman, Requardt & Associates, LLP
Wed, May 21, 2014
WE Credit 1, Option 2/Path 1 - Vegetable Garden
in Filling out the LEED Online credit form for WEc1 – Option 1
15 Kelsi Hurlbut
Wed, May 21, 2014
Anticipated Tenant Fit Out
in CS-2009 IEQp1: Minimum IAQ Performance
129 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Tue, May 20, 2014
RE: Credit 3.2 option 2
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
251 David Biggs
David R Biggs Construction
Tue, May 20, 2014
Automatic Receptacle Control
in CI-v4: Minimum energy performance
1 Erik Camacho
Mechanical EIT, LEED AP BD+C
TLC Engineering for Architecture
Tue, May 20, 2014
Equipment which uses NO water
in Healthcare-v2009: Water use reduction - food waste systems
3 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M
Revitaliza Consultores
Tue, May 20, 2014
Roof Area Clarification
in CS 2009 SSc7.2: Heat Island Effect—Roof
96 Maggie Hogan Skaug
Mon, May 19, 2014
United States
Prime farmland if drained
in NC v2.2 SSc1: Site Selection
25 Tina Gillman
CRSA
Mon, May 19, 2014
RE: VOC Compliant Chemicals - IEQ3.3
in EBOM 2009 IEQc3.3: Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
133 Garrett Gerst
Sr Marketing Manager
Unisource Worldwide
Mon, May 19, 2014
Waste stream audit
in EBOM-v4: Ongoing purchasing and waste policy
1 Michael Smithing
Director - Green Building Advisory
Colliers International
Sun, May 18, 2014
10% Exemption
in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
54 Elizabeth Felder
Thu, May 15, 2014
Brand New - Raw space
in CI-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
60 Ruben Garza
Thu, May 15, 2014
Molok Containers for MRp1
in CS 2009 MRp1: Storage and Collection of Recyclables
46 Kristopher Lashley
Wed, May 14, 2014
Canada
Door Distributor CoC
in Schools 2009 MRc7: Certified Wood
21 Nicole Ferrini
Uncommon LLC
Tue, May 13, 2014
Pilot credit # 45
in Pilot Credit 45: Site Assessment
16 Devani PERERA
Green Building Consultant
ELAN
Tue, May 13, 2014
France
RE: Active controls and thermal control
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
324 Terry Schroeder
Senior Project Engineer
Whitman, Requardt & Associates, LLP
Mon, May 12, 2014
RE: Active controls and thermal control
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
324 Terry Schroeder
Senior Project Engineer
Whitman, Requardt & Associates, LLP
Mon, May 12, 2014
Title Comments Post date Most Recent Postsort icon Location
Commercial Kitchens
in NC-2009 IEQp1: Minimum IAQ Performance
802 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Sat, Oct 25, 2014
2014-10-25 13:53 United States
Do I qualify? Lots of details, hopefully helpful How and whom...
in LEED for Homes (LEED-H) Forum
135 Bruce Johnson
Sat, Oct 25, 2014
2014-10-25 03:03 United States
Ice-cream factory with sub-zero working conditions
in NC 2009 IEQc7.1: Thermal Comfort—Design
195 André Harms
Ecolution Consulting
Fri, Oct 24, 2014
2014-10-24 10:18 South Africa
Separate CxA's for Fundamental and Enhanced Cx?
in NC-2009 EAc3: Enhanced Commissioning
258 Timothy Casper
Voith & Mactavish Architects
Fri, Oct 24, 2014
2014-10-24 09:17 United States
Is there a occupancy % under 100% that is still considered 100%?
in PIf3: Occupant and Usage Data
3 Blair Seibert
Principal, Architect
Verde Concepts, Inc.
Thu, Oct 23, 2014
2014-10-23 19:36 United States
IDF curves
in NC 2009 SSc6.1: Stormwater Design—Quantity Control
218 MKK LEED
Thu, Oct 23, 2014
2014-10-23 12:19 Colombia
Medical Center MRI, CT Scan Rooms
in NC 2009 IEQc8.1: Daylight and Views—Daylight
636 Sara Zoumbaris
Sustainable Design Consulting
Thu, Oct 23, 2014
2014-10-23 09:35 United States
Selection of HVAC Baseline System
in NC 2009 EAp2: Minimum Energy Performance
2,440 Praveenbabu R
Energy Analyst
Conserve consultants pvt ltd
Thu, Oct 23, 2014
2014-10-23 06:26 India
Heating only system; Baseline modeling of DHW
in NC 2009 EAp2: Minimum Energy Performance
2,440 Vassil Vassilev
Manager
Termoservice OOD
Thu, Oct 23, 2014
2014-10-23 02:28 Russian Federation
Modeling Laboratory Systems
in NC 2009 EAc1: Optimize Energy Performance
1,096 Victoria Watson
Wed, Oct 22, 2014
2014-10-22 19:15 United States
LEED Online Not Displaying Multiple Credit Assignees
in Start a New LEED Discussion Topic
141 Peter Warren
Principal
Warren Architecture
Wed, Oct 22, 2014
2014-10-22 17:30 United States
Project without exterior lighting
in NC 2009 SSc8: Light Pollution Reduction
555 María Fernanda Aguirre
Architect LEED AP BD + C - LEED AP ID + C
Renato Miranda and Associates
Wed, Oct 22, 2014
2014-10-22 16:26 Chile
The missing point
in NC 2009 IEQc7.2: Thermal Comfort—Verification
99 Angelica Ospina Alvarado
Wed, Oct 22, 2014
2014-10-22 15:40 Colombia
Commissioning of renewable energy systems
in NC-2009 EAc3: Enhanced Commissioning
258 Margaret Manuel
Tetra Tech
Wed, Oct 22, 2014
2014-10-22 12:50 United States
BAS - whole building
in EBOM 2009 EAc3.1: Performance Measurement—Building Automation System
34 Melissa Schifman
Principal
Sustology
Wed, Oct 22, 2014
2014-10-22 12:47 United States
Exception b. of G3.1.1 and setpoint temperature
in NC 2009 EAp2: Minimum Energy Performance
2,440 Francesco Passerini
engineer
leedme.it
Wed, Oct 22, 2014
2014-10-22 11:27 Italy
LEED: Homes eligibility?
in LEED for Homes (LEED-H) Forum
135 Erica Downs
Sustainability & LEED Consultant
Wed, Oct 22, 2014
2014-10-22 00:01 United States
Making the Shipping Company Take the Packaging?
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
83 Kimberlee Dobbins
Tue, Oct 21, 2014
2014-10-21 15:21 United States
LEED lease agreement for CS
in CS 2009 IEQc2: Increased Ventlilation
8 Alfonzo Collins
Tue, Oct 21, 2014
2014-10-21 11:43 United States
WEc3 denial
in NC 2009 WEc3: Water Use Reduction
109 Therese Thompson
Project Manager
Cordogan, Clark & Associates
Tue, Oct 21, 2014
2014-10-21 11:17 United States

Copyright 2014 – BuildingGreen, Inc.