LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: LEED ND Green Buildings
in ND-v2009: Certified green building
16 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Jun 4, 2014
RE: Check MPR and rating system selection policy
in Add addition to a LEED certified building.
6 LEED Consultant
Green Building and Alternative Energy
Wed, Jun 4, 2014
RE: SSc8 and EAc1 Disconnect?
in Schools 2009 EAc1: Optimize Energy Performance
41 Marcus Sheffer
LEED Fellow
7group
Tue, Jun 3, 2014
RE: Green e certified equivalence
in CS 2009 EAc6: Green Power
68 Marcus Sheffer
LEED Fellow
7group
Tue, Jun 3, 2014
LEED V3 GA exam Vs LEED V4 GA Exam
in NC-v4: Must be in a permanent location on existing land
8 Manzoor Ilahi
Tue, Jun 3, 2014
Commissioning with Volume Build Projects
in Retail-CI-v4: Fundamental commissioning and verification
1 Robin Dukelow, LEED AP BD+C
Sustainability Consultant; Project Manager
Henderson Engineers, Inc.; Sustainable Design Consulting, LLC
Mon, Jun 2, 2014
Initial Questions about LEED O+M
in PIf3: Occupant and Usage Data
1 Suticha M.
Mon, Jun 2, 2014
RE: Project Incomplete Before End of Performance Period
in EBOM 2009 MRc3: Sustainable Purchasing—Facility Alterations and Additions
76 Terry Gorski
via GBD Architects
Fri, May 30, 2014
RE: LEED CI V2012
in CI 2009 IDc2: LEED Accredited Professional
18 Jaewan Lee
Consultant
SGS Korea
Thu, May 29, 2014
Utility Trenches OK Beyond Boundary?
in MPR3: Must use a reasonable site boundary
1 Larry Turbes
Architect
TKDA
Thu, May 29, 2014
RE: Parking split for different tenants
in CS 2009 SSc4.4: Alternative Transportation—Parking Capacity
32 Renaud Gay
Shanghai Pacific Energy Center
Wed, May 28, 2014
RE: LEED Boundary
in CS 2009 SSc5.2: Site Development—Maximize Open Space
39 Ellen Mitchell
Sustainable Design Manager
HKS, Inc.
Wed, May 28, 2014
LEED Boaundary and Utility Connections
in PIf4: Schedule and Overview Documents
1 Larry Turbes
Architect
TKDA
Wed, May 28, 2014
RE: Low Emitting Materials - French Legislation Class A+
in Retail-NC-v4: Low emitting materials
7 Ian McCall
Environmental Engineer
Le Sommer Environnement
Mon, May 26, 2014
RE: Do school buses contribute to the Option 2 rate
in Schools-EBOM-v4: Alternative transportation
3 R. Ted Krasnesky
Manager of Sustainable Construction
Pepper Construction Company
Fri, May 23, 2014
RE: Certified LEED CI project going for EBOM
in EBOM 2009 SSc1: LEED Certified Design and Construction
37 Michelle Cottrell
President
Design Management Services
Thu, May 22, 2014
Whole building LCA - embodied and operational impacts
in Pilot Credit 63: Whole Building Life Cycle Assessment
12 Henrique Mendonca
Life Cycle Engineer
eTool
Thu, May 22, 2014
RE: site area
in PIf2: Project Summary Details
2 Adi Negara, LEED AP BD+C
Green Building Facilitator
PT. Indonesia Environment Consultant
Wed, May 21, 2014
WE Credit 1, Option 2/Path 1 - Vegetable Garden
in Filling out the LEED Online credit form for WEc1 – Option 1
15 Kelsi Hurlbut
Wed, May 21, 2014
RE: 3rd Edition not available on ITE website
in More Money, Less Guesswork: ITE Parking Generation Study and SSc4.4
23 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Tue, May 20, 2014
Title Comments Most Recent Post
RE: Time period
in Pilot Credit 16: Rainwater Management
15 John Nichols
Senior Sustainability Coordinator
Moseley Architects
Wed, May 7, 2014
RE: Property Boundry.
in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control
4 Phillip Cook
WGE
Tue, May 6, 2014
RE: LEED For Schools 2007 discrepancy
in Schools SSc10: Joint Use of Facilities
36 Esmeralda Ward
osborn architects
Mon, May 5, 2014
RE: rigole system/french drain
in CS-2009 SSc6.2: Stormwater Design—Quality Control
25 Michael DeVuono
Senior Staff Designer
T&M Associates
Mon, May 5, 2014
RE: net area vs gross area (simulation)
in CI 2009 IEQc8.1: Daylight and Views—Daylight
124 Yasuhito Koike
LEED AP, Green Building Consultant
Izumi System Planning
Thu, May 1, 2014
PC 9 - Open & Connected Community
in Pilot Credit 9: Street Network
67 michael kollman
Thu, May 1, 2014
LEED Boundary
in PIf4: Schedule and Overview Documents
1 CT G
Wed, Apr 30, 2014
RE: purchasing merchandise for resale
in EBOM 2009 IOc1: Innovation in Operations
43 Trista Little
Sustainability Manager
YR&G
Wed, Apr 30, 2014
Pest Control During Construction?
in NC-2009: Clean construction
1 Marian Keeler
Senior Associate
Thornton Tomasetti / Sustainability
Tue, Apr 29, 2014
Pest Control During Construction
in NC-2009: Green training for contractors, trades, operators and service workers
7 Marian Keeler
Senior Associate
Thornton Tomasetti / Sustainability
Tue, Apr 29, 2014
RE: first commissioning cycle
in EBOM 2009 EAc2.1: Existing Building Commissioning—Investigation and Analysis
55 David Hubka
Director - Operations
Transwestern Sustainability Services
Tue, Apr 29, 2014
RE: LEED v4 Regional Priority Credits?
in NC-v4: Regional priority
3 Michelle Diller
Sustainable Design Services Project Manager
HDR Architecture
Tue, Apr 29, 2014
RE: MR Project boundary in multi story building
in MPR2: Must be a complete, permanent building or space
3 Charles Nepps
Tue, Apr 29, 2014
RE: LEED for Retail
in PIf1: Minimum Program Requirements
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 29, 2014
RE: IN Credit 2: LEED Accredited Professional
in CI-v4: LEED Accredited Professional
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 29, 2014
RE: Feed-in Tariff Program Allowed?
in CS 2009 EAc2: On-Site Renewable Energy
47 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 28, 2014
LEED v3 CS Warehouse - MPR Minimum Occupancy Compliance
in MPR5: Must comply with minimum occupancy rates
1 Asa Posner
Senior Sustainability Consultant
Sustainable Investment Group (SIG)
Fri, Apr 25, 2014
RE: Previously developed
in CS v4: Surrounding density and diverse uses
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 24, 2014
Greenhouse Program
in Schools 2009 IDc1: Innovation in Design
18 Larry Turbes
Architect
TKDA
Fri, Apr 18, 2014
Illustrating Compliance using representative sampling?
in EBOM 2009 IEQc2.2: Controllability of Systems—Lighting
48 Ryan Hoffman
Heapy Engineering
Thu, Apr 17, 2014
Title Comments Most Recent Post
Recycled Definition
in MR CR4 Recycled Content
1 Michael Wolfe
Mon, Dec 27, 2010
LEED for Healthcare Open for Registration - by Tristan Roberts
Mon, Dec 20, 2010
Re: Project Summary Information
in Project Summary Information
1 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Mon, Dec 20, 2010
RE: LEED for hotels
in Hotels - Must We Use New Retail Program?
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Dec 17, 2010
post under IEQc4.2
in Paint VOC limits
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 14, 2010
RE: BUilding area to site area ratio
in EB-OM PIf2- Project Summary Details
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
Proposed changes to the LEED AP credit
in What's behind the proposed changes to the LEED AP credit for LEED 2012?
1 James Green
VP Engineering
HInes
Wed, Dec 8, 2010
MEP components
in Include plumbing components to recycled content
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
RE: Does anyone have any thoughts
in BREEAM as an alternative green building system?
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 7, 2010
RE: Same here. Its been about 15
in Pilot Credit Survey completion e-mail
3 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Dec 1, 2010
Treatment of District or Campus Thermal Energy
in DOes any one know if the USGBC produced the Addenda for LEED 2009 Districit Energy guidance?
1 Scott DeGaro
Sustainability Administrator
Barge Waggoner Sumner & Cannon, Inc.
Tue, Nov 30, 2010
Thank you
in Want to share LEED documentation tools or documents?
1 Terry Squyres
Principal
GWWO Inc./Architects
Wed, Nov 24, 2010
Ergonomic Design
in Ergonomic Design for an Innovation Point
1 Simon S.
SL+A International, Taipei
Thu, Nov 18, 2010
RE: 2009 CI IEQ Credit 5 Entryway System
in CI 2009 IEQ Credit 5 Entryway Systems
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Nov 17, 2010
RE: change in scope
in Extension of Mechanical Duct work
2 Kendrick Richardson
LSY Architects
Tue, Nov 16, 2010
LEED boundary
in Remote Parking lot, pre-existing LEED project
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 16, 2010
MPR#6
in Sharing energy/water useage data
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Nov 15, 2010
RE: LEED documentation in English
in Documentation
3 Katsiaryna Mazur
ISG OLSON, CJSC
Mon, Nov 15, 2010
certifying the process
in LEED for Water/Wastewater Treatment Facilities?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Nov 13, 2010
runs the gamut
in Taking Advantage of Utility Incentives?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 12, 2010
Title Votes Comments Most Recent Post
Electrical Door Hardware
in NC v2.2 MRc4: Recycled Content
95 148 Laura Waterman
Manager of Administrative Support
LaForce, Inc.
Tue, Dec 13, 2011
RE: Water in Concrete
in NC v2.2 MRc4: Recycled Content
95 148 Brian Lutey
VP of Green Building
Ozinga RMC Inc
Mon, May 21, 2012
CSI Division 2.0
in NC v2.2 MRc4: Recycled Content
95 148 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Fri, May 25, 2012
RE: Including "Dry Gardens" in Design Case
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
95 81 Lauren Sparandara
Sustainability Manager
Google
Wed, Aug 11, 2010
RE: MINIMUM IAQ AND FTE
in NC-2009 IEQp1: Minimum IAQ Performance
94 765 Hernando Miranda
Owner
Soltierra LLC
Tue, Mar 12, 2013
RE: VOC content for thermalplastic insulation
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
94 386 Dieter Ploeger
Fri, Mar 8, 2013
LEED EBOM performance period for EA credits.
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
94 98 Adam Meltzer
LEED AP_Designer
Shlemmer+Algaze+Associates
Tue, Aug 3, 2010
LEED EB O&M
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
94 98 Pal Ahuja
President
Millennium Engineering Inc.
Sun, Aug 29, 2010
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
94 95 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Thu, Sep 9, 2010
CxA contract
in CI 2009 EAc2: Enhanced Commissioning
94 46 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Tue, Jan 8, 2013
Stamped dwgs vs req'd LEED documentation signatures
in Required Signatories in LEED Online Forms
94 66 Renee Shirey
Thu, Jan 20, 2011
RE: non-project specific RECs
in CI 2009 EAc4: Green Power
94 95 Jacob Arlein
Director of Energy Services
Environmental Building Strategies
Fri, Sep 10, 2010
RE: Changing project name
in LEED IEQ Space Matrix - Frequently Asked Questions
94 31 Shivani Langer
Architect
SHW Group
Thu, Apr 18, 2013
Material Cost
in NC v2.2 MRc4: Recycled Content
94 148 Joe Gootee
Tue, Jul 31, 2012
RE: Ongoing Commissioning Overlap with New Building Commissioning
in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
94 29 Doug Pierce, AIA
Architect / Sustainability Strategist
Perkins+Will
Thu, Aug 12, 2010
RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
94 51 Anshul Chawla
Green Building Analyst
Environmental Design Solutions
Fri, Sep 17, 2010
RE: Can I change the project name?
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
93 572 Marcus Sheffer
LEED Fellow
7group
Wed, Feb 27, 2013
Tree canopy
in NC 2009 SSc7.1: Heat Island Effect—Nonroof
93 227 Carolina Vergnano
LEED AP
Concremat
Fri, Dec 21, 2012
Energy modeling Gross Surface / Net surface.
in CS 2009 EAp2: Minimum Energy Performance
93 835 Alessio Zampaglione
Architects
StudioAZA
Mon, Apr 15, 2013
RE: Fruits & Vegetables?
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
93 215 Nena Elise
Fri, Sep 10, 2010
Title Comments Most Recent Post
how long can be interval time between 2 parts of projects
in MPR2: Must be a complete, permanent building or space
3 Catharina B-K
LEED AP BD+C
Sun, Mar 30, 2014
LEED BD&C V4 Homes Registration Fees and Certification Fees
in Understanding the Cost of LEED-NC Project Certification
72 Benj Herrera
LEED AP BD+C
Sat, Mar 29, 2014
Option 3 for Catholic and Public Joint Use School
in LEED Canada Forum
37 Kelly Searle
LEED Green Associate, Sustainable Innovation Specialist
Clark Builders
Fri, Mar 28, 2014
Naturally ventilated and heated warehouse
in NC 2009 IEQc7.1: Thermal Comfort—Design
194 Scott McMillan
Thu, Mar 27, 2014
Performance Period Question for PV, SREC and credis added at end
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
91 Bahareh van Boekhold
Energy and Sustainability Planner
Delaware Division of Energy and Climate
Thu, Mar 27, 2014
Question about the Performance Period & newley added credits
in PIf4: Schedule and Overview Documents
1 Bahareh van Boekhold
Energy and Sustainability Planner
Delaware Division of Energy and Climate
Thu, Mar 27, 2014
Car park in basement
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
85 MM K
Wed, Mar 26, 2014
Convenience printers/copiers
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
85 MM K
Wed, Mar 26, 2014
LEED Project Boundary for Site Prepped by Previous Project
in MPR3: Must use a reasonable site boundary
198 Cassandra Coffin
Tue, Mar 25, 2014
CO2 in tenant spaces with visual alarm system
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
55 Jatuwat Varodompun
Dr
Green Building Soultion
Mon, Mar 24, 2014
LEED NC - Project Boundary
in MPR3: Must use a reasonable site boundary
198 sompoche sirichote
Mon, Mar 24, 2014
2 separate CI spaces, 1 project?
in MPR2: Must be a complete, permanent building or space
3 Charles Nepps
Sat, Mar 22, 2014
Green Cleaning products for norovirus?
in EBOM 2009 IEQc3.1: Green Cleaning—High Performance Cleaning Program
25 Lauren Sparandara
Sustainability Manager
Google
Thu, Mar 20, 2014
Calculating Hazardous Glass Area
in Pilot Credit 55: Bird Collision Deterrence
35 ray keane
Principal
Engineering 350 LLC
Thu, Mar 20, 2014
Purchased Energy Rate
in New District Energy Guidance for LEED Released by USGBC
56 May Xu
Wed, Mar 19, 2014
Precertification in LEED-CS v4
in Start a New LEED Discussion Topic
127 Nándor Kovács
Project Manager
Obuda-Ujlak Zrt.
Wed, Mar 19, 2014
AGMBC: Multiple Building and On-Campus Projects
in MPR2: Must be a complete, permanent building or space
3 Tam Kin Hung
Wed, Mar 19, 2014
Community Connectivity travel distance
in NC 2009 SSc2: Development Density and Community Connectivity
218 Jennifer Rennick
Principal
In Balance Green Consulting
Mon, Mar 17, 2014
Achieving this credit in a Shopping mall?
in CS 2009 IEQc6: Controllability of Systems—Thermal Comfort
34 Omar Katanani
Mon, Mar 17, 2014
previous documents
in EBOM 2009 SSc6: Stormwater Quantity Control
61 Brian Dougherty
Sat, Mar 15, 2014

Copyright 2014 – BuildingGreen, Inc.