LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
IO Credit _ Option B (Additional Strategies)
in EBOM 2009 RPc1: Regional Priority
46 Pal Ahuja
President
Millennium Engineering Inc.
Fri, Apr 11, 2014
RE: Ergonomic Strategy - 75% ergonomic workstations
in Pilot Credit 44: Ergonomics Strategy
32 Lisa Marshall
Ecological Building Strategies
Fri, Apr 11, 2014
RE: Bike Racks and project boundary
in Retail–NC-v2009: Alternative transportation
7 Webly Bowles
Associate Principal
Green Building Services
Fri, Apr 11, 2014
RE: Permanently Installed Furniture?
in CI-v4: Building product disclosure and optimization - environmental product declarations
2 Robert Dean
Project Coordinator, LEED AP, GHG IQ
Teknion Limited
Fri, Apr 11, 2014
LEEDuser's audit IAQ form
in EBOM 2009 IEQc1.1: IAQ Best Management Practices—IAQ Management Program
28 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Apr 10, 2014
RE: CAMPUS Approach For Rainwater Management
in EBOM-v4: Rainwater management
6 Trista Little
Sustainability Manager
YR&G
Thu, Apr 10, 2014
Change the LEED AP person during the project
in CS 2009 IDc2: LEED Accredited Professional
13 Nándor Kovács
Thu, Apr 10, 2014
RE: Link to the v4 Water Calculator
in NC-v4: Indoor water use reduction
2 Jen Crawford
Wed, Apr 9, 2014
RE: DIRTT Millwork on a LEED project
in CI 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
45 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, Apr 9, 2014
RE: Pilot Credit 43... How many projects have attemped this credit?
in Pilot Credit 43: Certified Products
22 Ashley Nedza
Project Designer, LEED AP BD+C
Baskervill
Wed, Apr 9, 2014
RE: Rater and Provider requirements?
in Mid-Rise v4: Integrative process
2 Ann Edminster
founder/principal
Design AVEnues LLC
Tue, Apr 8, 2014
RE: Regional Priority Point
in NC-2009: Site development - protect or restore habitat - alternative compliance path
3 Kai Starn
Sustainability Consultant
Steven Winter Associates
Tue, Apr 8, 2014
RE: District Energy Application?
in EBOM 2009 WEc4: Cooling Tower Water Management
61 Trista Little
Sustainability Manager
YR&G
Tue, Apr 8, 2014
RE: Air compressors
in Healthcare-v2009: Water use reduction - building equipment
2 Kim Shinn
Principal
TLC Engineering for Architecture
Mon, Apr 7, 2014
RE: Building signage
in EBOM 2009 SSc8: Light Pollution Reduction
103 Bill Swanson
PE, LEED AP
Integrated Architecture
Mon, Apr 7, 2014
RE: Project Type and Rating Type for Block Project
in LEED for Multiple Buildings and On-Campus Building Application Guide
18 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Apr 5, 2014
RE: Option 3 Under LEED ND V4
in ND-v2009: Brownfields redevelopment
4 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Apr 4, 2014
Airflow measuring devices on MUA
in EBOM 2009 IEQc1.2: IAQ Best Management Practices—Outdoor Air Delivery Monitoring
24 Trevor Gilbert
Energy Profiles
Fri, Apr 4, 2014
RE: Continuous sidewalks for industrial use street
in ND-v2009: Walkable streets
27 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Thu, Apr 3, 2014
RE: IES vs other software
in Has anyone done LEED energy modelling using Integrated Environmental Solutions (IES) software
5 Sylvain laporte
GASD-Co
Thu, Apr 3, 2014
Title Comments Most Recent Post
Insulating Concrete Forms
in Pilot Credit 20: Recycled Content for Non-Structural Materials
11 Amy Van Dam
Sustainable Design Coordinator
Boulder Associates Architects
Thu, Mar 13, 2014
Vegetated area requirement
in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat
92 John Burnett
FAC-LEEDership
Thu, Mar 13, 2014
RE: Appropriate use of Core and Shell?
in PIf5: Building System Control
10 John Beeson
Chief Mystic in Resident
Catalyst Partners
Wed, Mar 12, 2014
RE: Manual Override
in NC-v4: Light pollution reduction
4 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Mar 12, 2014
RE: CFL compliance
in Healthcare-v2009: PBT source reduction - mercury in lamps
11 Mark Gelfo
DIrector of Sustainability
TLC Engineering for Archiecture
Tue, Mar 11, 2014
RE: EAc4 calculator vs online template
in NC v2.2 EAc4: Enhanced Refrigerant Management
22 Amy Harmon
Tue, Mar 11, 2014
RE: Senior living facility
in ND-v2009: Connected and open community
34 Susan Di Giulio
Project Manager
Zinner Consultants
Tue, Mar 11, 2014
RE: Credit For Demolished Concrete for use as backfill
in NC-v4: Construction and demolition waste management
2 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Mon, Mar 10, 2014
RE: Performance period for leakage rate
in EBOM 2009 EAc5: Enhanced Refrigerant Management
38 Ben Stanley
Sustainability Manager
YRG sustainability
Mon, Mar 10, 2014
Residential Villa 4500 sqm (Does it meet MPR for LEED NC)
in MPR4: Must comply with minimum floor area requirements
9 Mohd Imran Shaikh
Sun, Mar 9, 2014
RE: 0% Achievement
in NC v2.2 EQc2: Increased Ventilation
18 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: IEQcr6.1 for hotel
in NC v2.2 EQc6.1: Controllability of Systems—Lighting
55 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: salvaged floor - value question
in NC v2.2 MRc3: Materials Reuse
37 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: Space designation
in Schools 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
8 Lauren Sparandara
Sustainability Manager
Google
Fri, Mar 7, 2014
RE: Eucalyptus - Rapidly Renewable
in CI 2009 MRc6: Rapidly Renewable Materials
15 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: No cooling tower
in NC-v4: Cooling tower water use
8 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: Water feature
in CS 2009 WEc1: Water Efficient Landscaping
51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: CAPP Plan
in NC-v4: Construction activity pollution prevention
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: EAC1.5
in Retail–CI-v2009: Optimize energy performance - building envelope
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: Light Power Density Calculated Method
in Retail–CI-v2009: Minimum energy performance
8 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
Title Comments Most Recent Post
Re: Project Summary Information
in Project Summary Information
1 David Posada
Sustainability Manager
GBD Architects
Mon, Dec 20, 2010
RE: LEED for hotels
in Hotels - Must We Use New Retail Program?
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Dec 17, 2010
post under IEQc4.2
in Paint VOC limits
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 14, 2010
RE: BUilding area to site area ratio
in EB-OM PIf2- Project Summary Details
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
Proposed changes to the LEED AP credit
in What's behind the proposed changes to the LEED AP credit for LEED 2012?
1 James Green
VP Engineering
HInes
Wed, Dec 8, 2010
MEP components
in Include plumbing components to recycled content
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 8, 2010
RE: Does anyone have any thoughts
in BREEAM as an alternative green building system?
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 7, 2010
RE: Same here. Its been about 15
in Pilot Credit Survey completion e-mail
3 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Dec 1, 2010
Treatment of District or Campus Thermal Energy
in DOes any one know if the USGBC produced the Addenda for LEED 2009 Districit Energy guidance?
1 Scott DeGaro
Sustainability Administrator
Barge Waggoner Sumner & Cannon, Inc.
Tue, Nov 30, 2010
Thank you
in Want to share LEED documentation tools or documents?
1 Terry Squyres
Principal
GWWO Inc./Architects
Wed, Nov 24, 2010
Ergonomic Design
in Ergonomic Design for an Innovation Point
1 Simon S.
SL+A International, Taipei
Thu, Nov 18, 2010
RE: 2009 CI IEQ Credit 5 Entryway System
in CI 2009 IEQ Credit 5 Entryway Systems
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Nov 17, 2010
RE: change in scope
in Extension of Mechanical Duct work
2 Kendrick Richardson
LSY Architects
Tue, Nov 16, 2010
LEED boundary
in Remote Parking lot, pre-existing LEED project
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 16, 2010
MPR#6
in Sharing energy/water useage data
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Nov 15, 2010
RE: LEED documentation in English
in Documentation
3 Katsiaryna Mazur
ISG OLSON, CJSC
Mon, Nov 15, 2010
certifying the process
in LEED for Water/Wastewater Treatment Facilities?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sat, Nov 13, 2010
runs the gamut
in Taking Advantage of Utility Incentives?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Nov 12, 2010
RE: out buildings and LEED
in Question about multiple buildings & LEED
2 Cara Mae Cirignano
Specialist, LEED Resource Development
US Green Building Council
Fri, Nov 12, 2010
New LEED 2009 Addenda Released - November 2010 - by Tristan Roberts
Mon, Nov 8, 2010
Title Votes Comments Most Recent Post
Uploading Phase II ESA report - where?
in Schools SSp2: Environmental Site Assessment
90 52 Renee Shirey
Fri, Sep 17, 2010
Recertification Fees
in LEED for Existing Buildings Recertification Is Here
90 9 Lauren Fakhoury
Research Assistant
Sustainable Design Consulting, LLC
Thu, Jan 3, 2013
RE: Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
89 88 Allison Beer McKenzie
Architect, Director of Sustainability
SHP Leading Design
Wed, Sep 8, 2010
no desigated/assigned/reserved parking for tenant
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
89 111 Kathy Buck
Senior Project Manager
Neumann/Smith Architecture
Wed, Aug 25, 2010
RE: VOC Budget - General Question
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
89 368 Mara Baum
Healthcare Sustainable Design Leader
HOK
Thu, Aug 12, 2010
right to access checklist
in EBOM 2009 SSc1: LEED Certified Design and Construction
89 37 Joanna Yaghooti
Director of Sustainable Design
PageSoutherlandPage
Thu, Aug 12, 2010
RE: WEc3 & WEc2 linked?
in NC 2009 WEc3: Water Use Reduction
89 95 E H
Sustainability Architect
Mon, Apr 15, 2013
Extensive Green Cleaning Policy
in Schools 2009 IDc1: Innovation in Design
89 18 Russell Philstrom
Fri, Sep 24, 2010
RE: Conductivity Meter and Auto Controls/No chemical management
in EBOM 2009 WEc4: Cooling Tower Water Management
89 61 Andrea Traber
Director, Sustainable Buildings and Operations
KEMA
Mon, Aug 23, 2010
RE: Guestrooms Excluded?
in LEED IEQ Space Matrix - Frequently Asked Questions
89 31 Lauren Sparandara
Sustainability Manager
Google
Thu, Apr 18, 2013
RE: "Building Completed 1993 or Later" Tab on Graph
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
89 51 Paul C
Mon, Sep 20, 2010
Does hotel type building can achieve this credit?
in NC 2009 IEQc7.2: Thermal Comfort—Verification
88 88 Mike Liu
ATKINS
Sun, Aug 15, 2010
RE: Local zoning requires no parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
88 111 Larry Jones
Associate
Atelier Ten
Tue, Sep 21, 2010
RE: No Green Products available
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
88 71 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Aug 20, 2010
RE: Tenant Finish-Out Insulation
in CS 2009 EAc1: Optimize Energy Performance
88 252 Heather Holdridge
Sustainability Coordinator
Lake/Flato Architects
Fri, Sep 7, 2012
Smoking area in retail area
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
88 245 GABRIEL MORALES
Architect
Grupo Syasa
Fri, Sep 10, 2010
RE: Reclaimed Restaurant Tables
in CI 2009 IEQc4.5: Low-Emitting Materials—Systems Furniture and Seating
88 126 Josh Jacobs
Technical Information & Public Affairs Manager
UL Environment
Wed, Dec 29, 2010
EP Credit
in EBOM 2009 MRc8: Solid Waste Management—Durable Goods
88 41 Walker Burttschell
APM
Hines
Mon, Sep 27, 2010
RE: existing green cleaning policy
in EBOM 2009 IEQp3: Green Cleaning Policy
88 71 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Aug 20, 2010
RE: MPR 2 Incomplete spaces
in LEED Minimum Program Requirements
88 440 Catherine Blakemore
Architect, LEED AP BC+D
HOLT Architects
Wed, Apr 10, 2013
Title Comments Most Recent Post
Are the units wrong in ”Indoor Air Quality Assessment” (EQc4)?
in Got Technical Questions on LEED v4?
54 Maria Porter
Environmental Certification Engineer
Skanska Sweden
Thu, Feb 20, 2014
How strictly is the "accessible location" interpreted?
in NC 2009 MRp1: Storage and Collection of Recyclables
54 Christina Nguyen
Wed, Feb 19, 2014
Included Furniture
in Schools IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
13 Johannes Gellrich
Wed, Feb 19, 2014
Surrounding Density and Diverse Uses
in Got Technical Questions on LEED v4?
54 Melissa Wrolstad
Senior Project Manager
CodeGreen Solutions
Tue, Feb 18, 2014
Events Venue
in EBOM 2009 MRc5: Sustainable Purchasing—Food
80 LEED member
Mon, Feb 17, 2014
Mech. exhaust fan required for a naturally ventilated project?
in CI-2009 IEQp1: Minimum IAQ Performance
129 Ronald Dean
Sumac Inc.
Mon, Feb 17, 2014
Tough to do with natural ventilation
in NC 2009 IEQc2: Increased Ventilation
79 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Mon, Feb 17, 2014
MPR for LEED 2009 ND
in PIf1: Development Program and Site Type
22 Jin Yang
LEED GA
ECADI
Sat, Feb 15, 2014
Submittals - requirements
in Pilot Credit 78: Design for active occupants
22 Lily Li
Fri, Feb 14, 2014
Use Ceiling Fans to Increase Ez
in NC v2.2 EQp1: Minimum IAQ Performance
56 Ken Pilcher
Fri, Feb 14, 2014
controllability of system
in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
28 Yaser Al Sharif
Thu, Feb 13, 2014
Renovate an old school
in Schools-EBOM-v4: Must comply with project size requirements
1 Davide Filippi
Wed, Feb 12, 2014
Exterior covered spaces
in Schools 2009 SSc7.1: Heat Island Effect—Nonroof
20 Esmeralda Ward
osborn architects
Tue, Feb 11, 2014
SS7.2 Heat Island Effect Roof - Material with no SRI
in CS 2009 SSc7.2: Heat Island Effect—Roof
94 Carine Guenand
Assistant Design Manager
Skanska Construction UK
Mon, Feb 10, 2014
How does the RP credit works?
in NC 2009 RPc1: Regional Priority
39 Saud Abdul Rasheed
LEED Engineer
Al Yamama Company
Mon, Feb 10, 2014
What certifications are accepted by USGBC for v4 low-emissions?
in CI-v4: Low emitting materials
1 Randy Carter
Manager, Global Codes & Approvals
Steelcase Inc.
Thu, Feb 6, 2014
Which parking spaces should be counted?
in CI-v4: Reduced parking footprint
1 MM K
Thu, Feb 6, 2014
SSp1 fo contiguous sites
in New LEED Guidance for Campuses and Multiple Buildings
490 Donald Green
Project Manager
Sustainable Design Consulting, LLC
Mon, Feb 3, 2014
LEEDuser waste audit template updated
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
78 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Feb 3, 2014
Option 3
in NC 2009 EAp2: Minimum Energy Performance
2,251 Alicia Silva
CEO
Revitaliza consultores
Sat, Feb 1, 2014

Copyright 2014 – BuildingGreen, Inc.