LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: Details on letter stating recycling content
in CS 2009 MRc4: Recycled Content
18 Michelle Reott
LEED AP BD+C, ID+C, Managing Principal
Earthly Ideas LLC
Wed, May 15, 2013
RE: Low emitting materials for Schools 2009
in Schools IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
22 J W
Wed, May 15, 2013
RE: Manufacturer bulb information availability is lacking!
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
102 Susan Walter
Sr Project Architect
Wilmot/Sanz
Wed, May 15, 2013
Carbon Offsets (Green-e Equivalent)
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
67 Green Domus
Green Domus
Wed, May 15, 2013
Credit SSc4.3 and LTpc70
in NC-2009: Green vehicles
4 Kenner Kingston
Director of Sustainability
Architectural Nexus
Wed, May 15, 2013
RE: Change of tenant
in PIf2: Project Summary Details
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, May 15, 2013
SSc2 Site Area vs LEED Project Boundry
in CS 2009 SSc2: Development Density and Community Connectivity
30 James Wieben
Wed, May 15, 2013
Baseline Building Rotation
in NC 2009 EAc1: Optimize Energy Performance
812 Mark Zoeteman
Sr. Mech Engr
FTC&H, Inc.
Wed, May 15, 2013
RE: regularly occupied space
in Schools 2009 IEQc8.2: Daylight and Views—Views
55 Todd Reed
Daylight Designer
7group
Wed, May 15, 2013
RE: Food sustainable purchase - Compliance demonstration
in EBOM 2009 MRc5: Sustainable Purchasing—Food
58 H.K.C.B. Heendeniya
Co-Energi (Pvt) Ltd.
Wed, May 15, 2013
smoking is allowed in hotel guest rooms
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
186 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Tue, May 14, 2013
RE: Option 4 ITE Parking Generation - federal property
in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
193 Michele Riberdy
Senior Project Manager
Viridian Energy & Environmental
Tue, May 14, 2013
RE: (Jacob) Calculating for Future Growth
in Calculating FTEs
135 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, May 14, 2013
RE: About carpool parking facilities.
in ND-v2009: Reduced parking footprint
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, May 14, 2013
Unusual FTE
in EBOM 2009 SSc4: Alternative Commuting Transportation
232 Erin Nuckols
Sustainable Building Associate
Institute for the Built Environment
Tue, May 14, 2013
RE: District Cooling System
in NC 2009 EAc4: Enhanced Refrigerant Management
67 Ante Vulin
Sustainability Manager
YR&G
Tue, May 14, 2013
Design Build Contractual Question- EAc3
in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems
42 Bob Crowell
Vice President / Principal
2rw Consultants, Inc.
Tue, May 14, 2013
RE: how do i take a "screenshot" of a map??
in How to Document SSc2 with Map Data
30 Kathryn West
LEED AP O+M, Guiding Principles Compliance Professional
Energy Ace
Tue, May 14, 2013
Remediation prior to project start date
in NC 2009 SSc3: Brownfield Redevelopment
62 Lauren Fakhoury
Research Assistant
Sustainable Design Consulting, LLC
Tue, May 14, 2013
RE: U-Value Units Conversion
in International Projects - alternative compliance path
116 Daniela Castro Salgado
LEED AP BD+C / Sustainability Coordinator
Edmonds International Ltd
Tue, May 14, 2013
Title Comments Most Recent Post
RE: Change of tenant
in PIf2: Project Summary Details
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, May 15, 2013
SSc2 Site Area vs LEED Project Boundry
in CS 2009 SSc2: Development Density and Community Connectivity
30 James Wieben
Wed, May 15, 2013
Baseline Building Rotation
in NC 2009 EAc1: Optimize Energy Performance
812 Mark Zoeteman
Sr. Mech Engr
FTC&H, Inc.
Wed, May 15, 2013
RE: regularly occupied space
in Schools 2009 IEQc8.2: Daylight and Views—Views
55 Todd Reed
Daylight Designer
7group
Wed, May 15, 2013
RE: Food sustainable purchase - Compliance demonstration
in EBOM 2009 MRc5: Sustainable Purchasing—Food
58 H.K.C.B. Heendeniya
Co-Energi (Pvt) Ltd.
Wed, May 15, 2013
smoking is allowed in hotel guest rooms
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
186 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Tue, May 14, 2013
RE: Option 4 ITE Parking Generation - federal property
in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
193 Michele Riberdy
Senior Project Manager
Viridian Energy & Environmental
Tue, May 14, 2013
RE: About carpool parking facilities.
in ND-v2009: Reduced parking footprint
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, May 14, 2013
Unusual FTE
in EBOM 2009 SSc4: Alternative Commuting Transportation
232 Erin Nuckols
Sustainable Building Associate
Institute for the Built Environment
Tue, May 14, 2013
RE: District Cooling System
in NC 2009 EAc4: Enhanced Refrigerant Management
67 Ante Vulin
Sustainability Manager
YR&G
Tue, May 14, 2013
Design Build Contractual Question- EAc3
in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems
42 Bob Crowell
Vice President / Principal
2rw Consultants, Inc.
Tue, May 14, 2013
Remediation prior to project start date
in NC 2009 SSc3: Brownfield Redevelopment
62 Lauren Fakhoury
Research Assistant
Sustainable Design Consulting, LLC
Tue, May 14, 2013
Submitted drawings
in PIf4: Schedule and Overview Documents
39 Ashley Sadowski
DRAW Architecture + Urban Design
Mon, May 13, 2013
RE: EAp2 Proposed Design
in CS 2009 EAp2: Minimum Energy Performance
516 Marcus Sheffer
LEED Fellow
7group
Mon, May 13, 2013
RE: PF1#6
in PIf1: Minimum Program Requirements
65 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, May 13, 2013
Appropriate use of Core and Shell?
in PIf5: Building System Control
6 Kath Williams
LEED Fellow, Principal
Kath Williams + Associates
Mon, May 13, 2013
RE: Facilities for Rent
in Schools SSc10: Joint Use of Facilities
30 Gabriela Sabadini
LEED Consultant
Edificioverde S.A.
Mon, May 13, 2013
ET0 for Beijing
in CS 2009 WEc1: Water Efficient Landscaping
37 JIN PARK
SAMOO Architects
Sun, May 12, 2013
RE: Composite Wood for exterior deck and melamine-urea-formaldehyde
in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
119 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, May 12, 2013
RE: Vocational Shops
in Schools 2009 IEQp3: Minimum Acoustical Performance
124 DuWayne Baird
Construction Administration/LEED Project Administration
SHP Leading Design
Sat, May 11, 2013
Title Comments Most Recent Post
EAp2 forum
in Reference building for a dewatering facility
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 21, 2013
RE: Silver or higher membership required for member discounts
in New USGBC Membership Fee Structure
55 Hernando Miranda
Owner
Soltierra LLC
Wed, Mar 20, 2013
RE: LEED AP v4
in LEED NC 2009 (v3) Professional Credentials
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 18, 2013
RE: Why not GA?
in 10 Tips for Passing the LEED Green Associate Exam
8 Paula Melton
Managing Editor
BuildingGreen, Inc.
Fri, Mar 15, 2013
RE: LEED-CS sunset date
in Sunset Dates for CI/CSv2.0
2 Kristina Bach
CORE Steward
Cooper Carry
Wed, Mar 13, 2013
asbestos roof
in Asbestos Roof
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 11, 2013
Advice for writing a LEED EB:O+M consulting contract - by Lyle Axelarris
Thu, Mar 7, 2013
RE: Is it really the windows?
in Poor Cell Phone Service in LEED buildings
4 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Mar 6, 2013
RE: Recertification EAc4
in Recertification
44 Alicia Chu
Sustainability Advisor
Healthy Buildings
Thu, Feb 28, 2013
RE: Non-U.S. Regional Priority Credits for LEED ND
in Non-U.S. Regional Priority Credits Added to LEED
25 Melissa Merryweather
Director
Green Consult-Asia
Fri, Feb 22, 2013
RE: LEED for Retail - MRp1 Waste Stream Study
in upcoming LEED for Retail
11 Caroline Hedin
Fri, Feb 22, 2013
RE: use of LEED logo
in LEED Logo usage on a video
4 Antonio Rodriguez
LEED AP BD+C
SYASA - México
Thu, Feb 21, 2013
RE: advanced buildings doc
in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”?
5 Victor Avedano
Principal
JALRW Eng. Group Inc.
Thu, Feb 21, 2013
RE: Major Tenant Build-out During Certification Period
in Major Tenant Build-out During Certification Period
4 Jennifer Knocha
Assistant
Mack-Cali Realty Corporation
Thu, Feb 14, 2013
IEQc3.1
in Requirment of Equipment storage yard
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 5, 2013
LEED-EBOM stress test
in Where Do I Start?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Feb 1, 2013
RE: Elevators - Energy Consumption - Sources
in Attaining credits through advanced elevator technology?
6 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, Feb 1, 2013
RE: Precertification and site/building area change
in LEED-CS v3 Precertification
37 Andrea Vosgueritchian
Project Manager
BDSP
Thu, Jan 31, 2013
RE: Best energy modeling software
in What is the best strategy/software to model District Cooling for LEED
5 Susan Walter
Sr Project Architect
Wilmot/Sanz
Tue, Jan 29, 2013
RE: Submitting Credits at Very End?
in Design Submital - 1batch only ?
15 Lauren Glasscock
Sr. Sustainability Professional
DNV KEMA Energy & Sustainability
Mon, Jan 28, 2013
Title Votes Comments Most Recent Post
Dormitory that is No Smoking
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
287 186 April Ambrose
Sustainability Consultant: Senior Project Manager
Viridian
Tue, Jan 26, 2010
Process water for EP point
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
287 55 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 22, 2009
RE: Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
286 48 Peter Doo
Doo Consulting LLC
Tue, Jan 26, 2010
What you are saying is indeed
in Schools 2009 SSc9: Site Master Plan
285 19 Erik Bergstrom
Green Building Associate
Wed, Dec 9, 2009
Automatic Credits for tenant improvement in new LEED Silver bldg
in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems
282 53 Judy Peterson
Sr. Associate - NW Interior Design
Heery International
Wed, Sep 2, 2009
"Building Completed 1993 or Later" Tab on Graph
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
282 55 April Ambrose
Sustainability Consultant: Senior Project Manager
Viridian
Fri, Jan 22, 2010
Designated Smoking Areas in parking garages
in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
281 71 Jason Franken
Sustainability Professional
Tue, Jun 2, 2009
How many showers & racks are needed?
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
281 73 Adolfo Silva
Principal
Ecovert Corporation
Thu, Dec 17, 2009
RE: Which Spaces Should Be Included?
in NC 2009 IEQc2: Increased Ventilation
281 54 Seema Pandya
Senior Sustainability Manager
YR&G sustainability
Tue, Jan 19, 2010
Depth of data collection required
in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
280 49 Chris Munn
Director, National Operations
Chelsea Group, Ltd.
Tue, Dec 1, 2009
Regionally manufactured materials
in NC 2009 MRc5: Regional Materials
279 143 Carrie Gunzel
Mon, Dec 7, 2009
Energy Star for a Manufacturing - Assembly Company
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
279 73 Robert McNeice
Thu, Dec 3, 2009
RE: Pin-based CFL's
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
278 102 Drew Johnson
LEED AP O+M
Tue, Dec 29, 2009
Off Site Renewable Energy
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
278 67 Reynaldo Castro
Sat, Jan 9, 2010
ISSUE Part 2
in CI-2009 IEQp1: Minimum IAQ Performance
278 96 Green Living LLC Elizabeth Gharib
Tue, Jan 26, 2010
RE: Off gasing furniture
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
278 55 Seema Pandya
Senior Sustainability Manager
YR&G sustainability
Tue, Jan 5, 2010
RE: What constitutes a "Master Plan"?
in Schools 2009 SSc9: Site Master Plan
278 19 Shannon Gray
Consultant
YRG sustainability
Mon, Jan 4, 2010
Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
278 48 Peter Doo
Doo Consulting LLC
Thu, Jan 21, 2010
Question Regarding Requirements
in Schools 2009 IEQc8.2: Daylight and Views—Views
277 55 John Drigot
Design/LEED Specialist
The Neenan Company
Mon, Sep 28, 2009
Existing bike storage and showers
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
277 73 Peter Doo
Doo Consulting LLC
Tue, Nov 17, 2009
Title Comments Most Recent Post
ET0 for Beijing
in CS 2009 WEc1: Water Efficient Landscaping
37 JIN PARK
SAMOO Architects
Sun, May 12, 2013
WEc1 Water Efficient Landscaping
in NC 2009 WEc1: Water Efficient Landscaping
234 Brian Kelly
Project Designer
UED
Fri, May 10, 2013
Private Bus Service
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
97 Daniel R Gutierrez
Project Architect
INGETEC
Thu, May 9, 2013
Commissioning Services Contracted Through Design Firm?
in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems
53 Jaclyn Whitaker AIA LEED AP BD+C
Assistant Director of Sustainability
HLW International
Thu, May 9, 2013
Calculating "Projection Factor" for curtainwall shading devices
in CS 2009 EAp2: Minimum Energy Performance
516 Amit Ahiel
Thu, May 9, 2013
added FAQ
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
186 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, May 8, 2013
Eliminating Multiple Responses From One Person - Survey Changes
in EBOM 2009 SSc4: Alternative Commuting Transportation
232 Kevin Kelly
Wed, May 8, 2013
2 options, Flush out and Air testing
in Schools 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
23 Yazmin Trueba
Project Engineer
Sundt Construction
Tue, May 7, 2013
MPR 2 - Separate Ownership
in MPR2: Must be a complete, permanent building or space
45 Jonathan Weiss
Tue, May 7, 2013
Mixed Ventilation
in NC 2009 IEQc2: Increased Ventilation
54 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Tue, May 7, 2013
LEEDUser vs. USGBC
in Pilot Credit 34: Design for Adaptability
7 Nicholas Swinehart
Mon, May 6, 2013
Ongoing Cx Requirements
in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
26 Colleen Collins
Mon, May 6, 2013
LEED Project Boundary in case of uderground parking
in MPR3: Must use a reasonable site boundary
96 Mario Pinoli
Mon, May 6, 2013
Shuttle bus
in NC v2.2 SSc4.1: Alternative Transportation—Public Transportation Access
19 Valentin Grimaud
Thermal Engineer
TERAO Green Building Engineering
Sun, May 5, 2013
LEED Signage for display inside Gold certified office building
in Start a New LEED Discussion Topic
9 Jeff Zunt
THORSON BAKER & Associates, Inc
Sun, May 5, 2013
Tenant Sales or Lease Agreement
in CS v3 - Appendix 4 - Tenant Lease or Sales Agreement
19 Julie Hendricks
Director of EcoServices
Kirksey
Sun, May 5, 2013
Separate Buildings, Same Cellar
in NC 2009 MRp1: Storage and Collection of Recyclables
45 Jesus Deras
Energy Analyst
The Wall Consulting Group
Sun, May 5, 2013
Reasonable Boundary - other support builidngs beyond project
in MPR3: Must use a reasonable site boundary
96 Nicole Kimoto
Fri, May 3, 2013
Building Configurations
in NC v2.2 EAp2: Minimum Energy Performance
174 Andrew Dasso
Architect
Heart of America Group
Fri, May 3, 2013
LEED Canada 2009 option 1
in NC 2009 SSc4.4: Alternative Transportation—Parking Capacity
193 nancy picard
Fri, May 3, 2013

Copyright 2013 – BuildingGreen, Inc.