LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
SSc 3.3 Parking Availbility
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
111 Jaclyn Noga
Environmental Intern
EHRA, LLC
Tue, Jul 22, 2014
RE: IAQ Testing
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
63 Akos Brandecker
Sustainability Manager
ISG
Tue, Jul 22, 2014
RE: Donated Furniture
in CI 2009 MRc3.2: Materials Reuse—Furniture and Furnishings
57 Simon S.
SL+A International, Taipei
Mon, Jul 21, 2014
Proprietary Ingredients
in EBOM 2009 IEQc3.6: Green Cleaning—Indoor Integrated Pest Management
67 Elizabeth Felder
Mon, Jul 21, 2014
Beach Cleanup of Trash - credit?
in EBOM 2009 MRp2: Solid Waste Management Policy
21 Nate Gillette
Director
Natura Architectural Consulting LLC
Mon, Jul 21, 2014
CLO level adjustments
in NC-v4: Thermal comfort
2 Adam Kingsbury
Mon, Jul 21, 2014
RE: Sensory Stimulation
in Pilot Credit 78: Design for active occupants
22 Brenda Stanfield
Librarian
CBT Architects
Mon, Jul 21, 2014
RE: Cost of LEED report - Internationl projects
in Understanding the Cost of LEED-NC Project Certification
71 Andrew Gil
Architect, Associate, LEED AP BD+C. USGBC NY Upstate Board of Directors
HOLT Architects, P.C.
Mon, Jul 21, 2014
CASE 2 and EAP2 Cumpliance
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
451 João Gaio
Mon, Jul 21, 2014
RE: EBOM Compliance Path
in NC 2009 SSc8: Light Pollution Reduction
529 Bill Swanson
PE, LEED AP
Integrated Architecture
Mon, Jul 21, 2014
IEQc7.1, MET and CLO, and Acceptable Alterations
in NC 2009 IEQc7.1: Thermal Comfort—Design
189 Adam Kingsbury
Mon, Jul 21, 2014
Case 2, Option 2 clarification - years
in EBOM-v4: Minimum energy performance
2 Alexa Stone
ecoPreserve - Building Sustainbility
Mon, Jul 21, 2014
SSc 3.3 Parking Availbility
in Retail–CI-v2009: Alternative transportation
3 Jaclyn Noga
Environmental Intern
EHRA, LLC
Mon, Jul 21, 2014
RE: Accessories Included in Baseline.
in Healthcare-v2009: Water use reduction
12 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Jul 21, 2014
RE: Conducting Survey: Mid-Week OK?
in EBOM 2009 SSc4: Alternative Commuting Transportation
269 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Mon, Jul 21, 2014
System CRI certified
in EBOM 2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipment
43 Gabriel Frasson
Project Manager
OTEC
Mon, Jul 21, 2014
Can reusing a parking garage count toward this credit?
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
79 Caleb Lesselles
INTERN ARCHITECT
COOPER CARRY
Mon, Jul 21, 2014
RE: No Smoking Campus Policy
in CI 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
26 Akos Brandecker
Sustainability Manager
ISG
Mon, Jul 21, 2014
RE: How to interpret "Huddle Rooms"?
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
316 Terry Schroeder
Senior Project Engineer
Whitman, Requardt & Associates, LLP
Mon, Jul 21, 2014
RE: Total Gross Area: does the roof area counts?
in PIf2: Project Summary Details
2 Jens Glöggler
Dipl.Ing
ATP sustain
Mon, Jul 21, 2014
Title Comments Most Recent Post
CLO level adjustments
in NC-v4: Thermal comfort
2 Adam Kingsbury
Mon, Jul 21, 2014
RE: Sensory Stimulation
in Pilot Credit 78: Design for active occupants
22 Brenda Stanfield
Librarian
CBT Architects
Mon, Jul 21, 2014
CASE 2 and EAP2 Cumpliance
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
451 João Gaio
Mon, Jul 21, 2014
RE: EBOM Compliance Path
in NC 2009 SSc8: Light Pollution Reduction
529 Bill Swanson
PE, LEED AP
Integrated Architecture
Mon, Jul 21, 2014
IEQc7.1, MET and CLO, and Acceptable Alterations
in NC 2009 IEQc7.1: Thermal Comfort—Design
189 Adam Kingsbury
Mon, Jul 21, 2014
Case 2, Option 2 clarification - years
in EBOM-v4: Minimum energy performance
2 Alexa Stone
ecoPreserve - Building Sustainbility
Mon, Jul 21, 2014
SSc 3.3 Parking Availbility
in Retail–CI-v2009: Alternative transportation
3 Jaclyn Noga
Environmental Intern
EHRA, LLC
Mon, Jul 21, 2014
RE: Accessories Included in Baseline.
in Healthcare-v2009: Water use reduction
12 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Jul 21, 2014
RE: Conducting Survey: Mid-Week OK?
in EBOM 2009 SSc4: Alternative Commuting Transportation
269 Dan Ackerstein
Principal
Ackerstein Sustainability, LLC
Mon, Jul 21, 2014
System CRI certified
in EBOM 2009 IEQc3.4: Green Cleaning—Sustainable Cleaning Equipment
43 Gabriel Frasson
Project Manager
OTEC
Mon, Jul 21, 2014
Can reusing a parking garage count toward this credit?
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
79 Caleb Lesselles
INTERN ARCHITECT
COOPER CARRY
Mon, Jul 21, 2014
RE: No Smoking Campus Policy
in CI 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
26 Akos Brandecker
Sustainability Manager
ISG
Mon, Jul 21, 2014
RE: How to interpret "Huddle Rooms"?
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
316 Terry Schroeder
Senior Project Engineer
Whitman, Requardt & Associates, LLP
Mon, Jul 21, 2014
RE: Total Gross Area: does the roof area counts?
in PIf2: Project Summary Details
2 Jens Glöggler
Dipl.Ing
ATP sustain
Mon, Jul 21, 2014
RE: Server Room
in NC 2009 IEQc8.2: Daylight and Views—Views
350 Todd Reed
Daylight Designer
7group
Mon, Jul 21, 2014
RE: Combining Option 2 and Option 3
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
189 Meghan Ward
Architectural Technologist, Sustainable Design Consultant
Aurecon South Africa
Mon, Jul 21, 2014
Re-certification of a LEED 2009 EBOM project in 2017
in PIf1: Minimum Program Requirements
1 Melissa Merryweather
Director
Green Consult-Asia
Sun, Jul 20, 2014
10% Exemption
in EBOM 2009 IEQc3.5: Green Cleaning—Indoor Chemical and Pollutant Source Control
54 Elizabeth Felder
Fri, Jul 18, 2014
RE: Combined Waste Stream Audits
in EBOM 2009 MRc6: Solid Waste Management—Waste Stream Audit
78 Elizabeth Felder
Fri, Jul 18, 2014
ASHRAE 62.1-2013 Version
in NC-v4: Minimum indoor air quality performance
4 Adam Stoker
Sustability Consultant
University of Calgary
Fri, Jul 18, 2014
Title Comments Most Recent Post
RE: Why the USA Today Article Misses the Point
in USA Today Story on LEED Misses the Mark
33 Bill Ford
Architect
WLFA Associates
Mon, Mar 10, 2014
note about this forum
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
The RPCs have been updated
in Non-U.S. Regional Priority Credits Added to LEED
26 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Mon, Mar 3, 2014
RE: *sensationalism alert*!
in Does LEED v4 Ban PVC?
11 Paula Melton
Managing Editor
BuildingGreen, Inc.
Wed, Feb 26, 2014
RE: LEED-CS sunset date
in Sunset Dates for CI/CSv2.0
3 Usama Eita
Wed, Feb 5, 2014
RE: advanced buildings doc
in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”?
8 J-E. Dufour-G.
Fri, Jan 24, 2014
RE: Split Submissions now and after 2015
in How long does it take for USGBC to do the LEED design & construction review?
11 John Neville
President
Sustainable Arizona
Thu, Jan 23, 2014
RE: Aren't Corrections only supposed to be published in Apr and Oct?
in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jul 2, 2014
RE: Is it really the windows?
in Poor Cell Phone Service in LEED buildings
5 Travis Reed
CellAntenna
Mon, Jan 6, 2014
17 critical—and misunderstood—LEED terms - by Tristan Roberts
Mon, Feb 24, 2014
GFA and other usage types on underground parking storey
in LEED Certifications for Parking Garages No Longer Allowed
13 Maciej Starewicz
MArch
visio architects and consultants
Fri, Jan 3, 2014
RE: Key CIR for Registered non-certified LEED-CS v2.0 projects
in Key CIR for Registered non-certified LEED-CS v2.0 projects
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Dec 23, 2013
I agree Tristan!
in Dear USGBC, Give Us Transparency on LEED Energy Data
4 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Fri, Dec 13, 2013
RE: LEED Data Set - Energy Use Way Too High!
in Energy Star Score of 85 for 450 LEED Buildings in Biggest Data Release Yet
2 Michele Helou
Principal
Sage Design & Consulting
Thu, Dec 5, 2013
RE: my experience
in LEED core + shell vs. new construction
8 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Tue, Dec 3, 2013
RE: The role of concensus in green rating systems
in Chemical Industry Touts Anti-LEED Language in Appropriations Bill
19 Paula Melton
Managing Editor
BuildingGreen, Inc.
Tue, Dec 3, 2013
RE: V4 implementation and '09 phase out
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Sun, Dec 1, 2013
RE: Excited to Meet Everyone!
in See You in Philly! Greenbuild 2013
5 Mara Baum
Healthcare Sustainable Design Leader
HOK
Tue, Nov 19, 2013
Feds: Green Globes as Good as LEED - by Tristan Roberts
Wed, Nov 13, 2013
Congratulations 2013 LEED Fellows - by Tristan Roberts
Wed, Nov 13, 2013
Title Votes Comments Most Recent Post
Off gasing furniture
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
298 63 Peter Doo
President
Doo Consulting, LLC
Mon, Jan 4, 2010
RE: M&V plan required for case 1, or not?
in CI 2009 EAc3: Measurement and Verification
298 120 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Wed, Dec 16, 2009
RE: RECs providers...
in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy
297 90 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jan 27, 2010
RE: Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
297 57 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Jan 27, 2010
What you are saying is indeed
in Schools 2009 SSc9: Site Master Plan
295 21 Erik Bergstrom
Green Building Associate
Wed, Dec 9, 2009
"Building Completed 1993 or Later" Tab on Graph
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
295 51 Chad Oppenhuizen
Sustainability Consultant: Senior Project Manager
Viridian
Fri, Jan 22, 2010
RE: Retail space parking
in CI 2009 SSc3.3: Alternative Transportation—Parking Availability
294 111 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Dec 2, 2009
M&V plan required for case 1, or not?
in CI 2009 EAc3: Measurement and Verification
294 120 Dave Intner
Firmitas Architecture & Planning
Tue, Dec 15, 2009
RE: 7th ed. Massachusetts Building Code and ASHRAE 62.1-2004
in NC 2009 IEQc2: Increased Ventilation
293 79 Seema Pandya
Senior Sustainability Manager
YR&G sustainability
Tue, Jan 19, 2010
Dormitory that is No Smoking
in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
292 246 Chad Oppenhuizen
Sustainability Consultant: Senior Project Manager
Viridian
Tue, Jan 26, 2010
Automatic Credits for tenant improvement in new LEED Silver bldg
in CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
292 64 Judy Peterson
Sr. Associate - NW Interior Design
Heery International
Wed, Sep 2, 2009
Which Spaces Should Be Included?
in NC 2009 IEQc2: Increased Ventilation
291 79 Omer Moltay
Mon, Jan 18, 2010
Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
291 57 Peter Doo
President
Doo Consulting, LLC
Thu, Jan 21, 2010
RE: Pin-based CFL's
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
290 142 Drew Johnson
LEED AP O+M
Tue, Dec 29, 2009
Question Regarding Requirements
in Schools 2009 IEQc8.2: Daylight and Views—Views
289 63 John Drigot
Design/LEED Specialist
The Neenan Company
Mon, Sep 28, 2009
Existing bike storage and showers
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
289 80 Peter Doo
President
Doo Consulting, LLC
Tue, Nov 17, 2009
How many showers & racks are needed?
in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms
289 80 Adolfo Silva
Principal
Ecovert Corporation
Thu, Dec 17, 2009
RE: Off gasing furniture
in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy
288 63 Seema Pandya
Senior Sustainability Manager
YR&G sustainability
Tue, Jan 5, 2010
Energy Star for a Manufacturing - Assembly Company
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
287 96 Robert McNeice
Thu, Dec 3, 2009
RE: "Building Completed 1993 or Later" Tab on Graph
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
287 51 Jason Franken
Sustainability Professional
Fri, Jan 29, 2010
Title Comments Most Recent Post
Temperature rise due to Urban Heat Island Effect
in NC 2009 SSc7.2: Heat Island Effect—Roof
251 S S
Mon, Jul 14, 2014
Extension past v2.2 Sunset date June 27, 2015?
in Upgrade to LEED 2009? How to Choose for Your Project
16 Rodger Kuo
Architect
Port of Los Angeles
Fri, Jul 11, 2014
Groundwater to achieve this credit
in CS 2009 WEc2: Innovative Wastewater Technologies
19 MKK LEED
Thu, Jul 10, 2014
Projects with Several Physically Distinct Structures
in NC-v4: Must comply with project size requirements
1 Inés Alomar
Thu, Jul 10, 2014
Sports Pitch Floodlighting
in Schools 2009 SSc8: Light Pollution Reduction
51 Susannah Goddard
Thu, Jul 10, 2014
selecting controller efficiency manufacturer company
in NC 2009 WEc1: Water Efficient Landscaping
339 prerana tuladhar
leed
Thu, Jul 10, 2014
Non Regularly Occupied Spaces
in CI 2009 IEQc1: Outdoor Air Delivery Monitoring
29 James Keohane, PE LEED BD+C CxA CPMP
Sustainability and Commissioning Consultant
Sustainable Engineering Concepts, LLC
Wed, Jul 9, 2014
Bus Stops for Exemplary Performance
in CI 2009 SSc3.1: Alternative Transportation—Public Transportation Access
41 Yuran Pan
Wed, Jul 9, 2014
IAQ Option #1
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
241 David Biggs
David R Biggs Construction
Wed, Jul 9, 2014
CS MPR2: reclaimed land without development previously
in MPR2: Must be a complete, permanent building or space
3 Vivien Wong
Parsons Brinckerhoff
Wed, Jul 9, 2014
Minimum Indoor Air Quality Performance Calculator with buggy
in NC-v4: Minimum indoor air quality performance
4 Vitor Tosetto
Environmental Engineer
NewFields
Tue, Jul 8, 2014
Option 1
in NC-v4: Surrounding density and diverse uses
1 Edgar Arevalo
Tue, Jul 8, 2014
Gross Square Footage
in PIf2: Project Summary Details
168 Hieu Huynh
Environmental Engineer
Mon, Jul 7, 2014
Quick Survey LEED O+M v4 for Existing Buildings.
in Understanding the Cost of LEED-NC Project Certification
71 Oscar Mendez
Project Manager
ASINTELIX
Mon, Jul 7, 2014
Chemical/Hazardous Gas Area Separation
in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control
294 Jason Warner
Project Manager
TCA Architecture Planning
Mon, Jul 7, 2014
Residential Type Sinks in Middle School Classroom
in Schools 2009 WEp1: Water Use Reduction—20% Reduction
35 Sara Zoumbaris
Mon, Jul 7, 2014
Downloading Review Report
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
545 Charles Nepps
Mon, Jul 7, 2014
Hi, We have a project where
in NC 2009 IEQc7.1: Thermal Comfort—Design
189 Mayank Bhatnagar
Mon, Jul 7, 2014
LEED HC 2009 ID P1 and c3
in Healthcare-v2009: Integrated project planning and design
1 Usama Eita
Sat, Jul 5, 2014
LEED v4 Green Associate Exam (for Non-US/International)
in Start a New LEED Discussion Topic
114 Mei Velas-Suarin
Environmental & Social Development Professional
Sat, Jul 5, 2014

Copyright 2014 – BuildingGreen, Inc.