LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
RE: Calculation based on chilled water meters
in Retail–CI-v2009: On-site renewable energy
10 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Success substituting the LEEDv4 approach for WEc1 in v2009?
in NC 2009 WEc1: Water Efficient Landscaping
427 deborah lucking
associate
fentress architects
Mon, Apr 25, 2016
RE: Preferred parking FE vehicles and VIP parking
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
448 Kim Lombard
Architect
AECOM
Mon, Apr 25, 2016
RE: Performance period and construction
in EBOM 2009 IEQc1.5: IAQ Best Management Practices—IAQ Management for Facility Alterations and Additions
46 Kasandra Martin
Designer
Mon, Apr 25, 2016
RE: EAc6 baseline and PP?
in EBOM 2009 EAc6: Emissions Reduction Reporting
40 Kasandra Martin
Designer
Mon, Apr 25, 2016
RE: EAp2
in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
104 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: EAc1.3
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
401 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Exemplary Performance?
in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
108 José Solis
Big and Bright Strategies
Mon, Apr 25, 2016
United States
RE: Room Input Report
in NC 2009 IEQc7.1: Thermal Comfort—Design
250 Cam Fitzgerald
Energy Engineer
7group
Mon, Apr 25, 2016
RE: EAc3 - Enhanced Commissioning, LEED v2009
in NC-2009 EAc3: Enhanced Commissioning
302 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: Implementing all improvements in one renovations phase at a time
in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation
36 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: CxA selection
in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
39 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: CREC purchase
in CI 2009 EAc4: Green Power
106 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Baseline HVAC System
in CS 2009 EAc1: Optimize Energy Performance
304 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Ashrae 90.1 2010 Appendix G
in NC-v4: Minimum energy performance
75 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: credit for renewables on site?
in NC 2009 EAc6: Green Power
189 Melissa Merryweather
Director
Green Consult-Asia
Mon, Apr 25, 2016
Vietnam
RE: REC Certificate - Renewable Energy
in NC 2009 EAc2: On-Site Renewable Energy
259 Marcus Sheffer
LEED Fellow
7group
Sun, Apr 24, 2016
RE: Cooling tower cycles
in NC-v4: Cooling tower water use
17 Trista Little
Sustainability Manager
YR&G
Sun, Apr 24, 2016
RE: LEED NC: MR or LEED EBOM
in LEED Rating System Selection Q&A
784 ABDUL MUTHALIB MOHAMED
INNOWELL ENGINEERING INTERNATIONAL PVT LTD
Sat, Apr 23, 2016
Change of Owner's Name
in Required Signatories in LEED Online Forms
72 John Zehren
Zehren and Associates
Fri, Apr 22, 2016
United States
Title Comments Most Recent Post Location
RE: Performance period and construction
in EBOM 2009 IEQc1.5: IAQ Best Management Practices—IAQ Management for Facility Alterations and Additions
46 Kasandra Martin
Designer
Mon, Apr 25, 2016
RE: EAc6 baseline and PP?
in EBOM 2009 EAc6: Emissions Reduction Reporting
40 Kasandra Martin
Designer
Mon, Apr 25, 2016
RE: EAp2
in CI 2009 EAc1.1: Optimize Energy Performance—Lighting Power
104 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: EAc1.3
in CI 2009 EAc1.3: Optimize Energy Performance—HVAC
401 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Exemplary Performance?
in CS 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
108 José Solis
Big and Bright Strategies
Mon, Apr 25, 2016
United States
RE: Room Input Report
in NC 2009 IEQc7.1: Thermal Comfort—Design
250 Cam Fitzgerald
Energy Engineer
7group
Mon, Apr 25, 2016
RE: EAc3 - Enhanced Commissioning, LEED v2009
in NC-2009 EAc3: Enhanced Commissioning
302 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: Implementing all improvements in one renovations phase at a time
in EBOM 2009 EAc2.2: Existing Building Commissioning—Implementation
36 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: CxA selection
in EBOM 2009 EAc2.3: Existing Building Commissioning—Ongoing Commissioning
39 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Mon, Apr 25, 2016
RE: CREC purchase
in CI 2009 EAc4: Green Power
106 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Baseline HVAC System
in CS 2009 EAc1: Optimize Energy Performance
304 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: Ashrae 90.1 2010 Appendix G
in NC-v4: Minimum energy performance
75 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 25, 2016
RE: credit for renewables on site?
in NC 2009 EAc6: Green Power
189 Melissa Merryweather
Director
Green Consult-Asia
Mon, Apr 25, 2016
Vietnam
RE: REC Certificate - Renewable Energy
in NC 2009 EAc2: On-Site Renewable Energy
259 Marcus Sheffer
LEED Fellow
7group
Sun, Apr 24, 2016
RE: Cooling tower cycles
in NC-v4: Cooling tower water use
17 Trista Little
Sustainability Manager
YR&G
Sun, Apr 24, 2016
RE: correction for online reference guide
in NC-v4: Rainwater management
73 Theresa Backhus
Sites Technical Specialist, LEED
USGBC
Fri, Apr 22, 2016
v4
in Schools-NC-v4: Light pollution reduction
1 Peter Doo
President
Doo Consulting, LLC
Fri, Apr 22, 2016
United States
PIf4 Uploads - Site Plan Required
in PIf4: Schedule and Overview Documents
5 Dee Spiro
Sustainability Director
Bergmeyer Associates, Inc.
Fri, Apr 22, 2016
PV Panels
in CS 2009 SSc5.1: Site Development—Protect or Restore Habitat
106 Ciaran McCabe
Fri, Apr 22, 2016
MRP3- minimum square meter for group certification
in Hospitality-NC-v4: Must comply with project size requirements
1 Giusy Amorusi
INTERTECNO S.p.A.
Fri, Apr 22, 2016
Title Comments Most Recent Post Location
RE: Congrats Paula!
in Why I’m About to Fail the New, Harder LEED v4 AP Exam
10 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Mon, Sep 21, 2015
RE: Do parking garages need to be included in the LEED project?
in LEED Certifications for Parking Garages No Longer Allowed
16 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Wed, Sep 16, 2015
RE: LEED credit achievement
in Credit Achievement Tally
2 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional
JLL
Fri, Sep 4, 2015
RE: elevator question
in Attaining credits through advanced elevator technology?
7 Dustin Campbell
Sustainability Analyst
ETC Group
Thu, Aug 27, 2015
RE: LEED AP BD+C V4 EXAM in one month!
in 10 Tips for Passing the LEED Green Associate Exam
68 Paula Melton
Senior Editor
BuildingGreen, Inc.
Mon, Aug 10, 2015
RE: Legacy LEED AP's
in Experience Requirement Loosened for LEED v4 AP Exam
18 Bill Swanson
PE, LEED AP
Integrated Architecture
Thu, Jul 2, 2015
RE: LEED Volume Program - Submittal Guidance
in Forum for LEED Volume Program Certification
11 Michelle Cottrell
President
Design Management Services
Thu, Jun 18, 2015
EBie Awards 2015 Finalists Announced by Urban Green - by Tristan Roberts
Tue, May 19, 2015
RE: International Projects
in LEED 2009 Registration Extended to October 2016
138 Andrew Carman
Sustainability Consultant
Sebesta
Thu, May 14, 2015
MR - Ongoing Purchasing and Waste Policy - Food waste (compost)
in LEED for Existing Multifamily Unveiled for Comment
1 Julien Lafond
Altanova, LLC
Thu, Aug 27, 2015
RE: Feedback on the LEED 2009 ACPs for Projects Outside the U.S.
in International Projects - alternative compliance path
169 Eric Johnson
Principal Sustainability Project and Cost Manager
Green Future Now
Fri, Apr 10, 2015
RE: OPR for LEED ND
in LEED for Neighborhood Development (LEED-ND) Forum
186 Casey Studhalter
Project Manager, LEED
USGBC
Wed, Apr 1, 2015
RE: Energy And Water Data Release Form
in MPR 6 - Energy Star Portfolio Manager
48 Karen Joslin
principal
Joslin Consulting
Thu, Mar 19, 2015
RE: LEED v4 CIR
in Got Technical Questions on LEED v4?
58 Neshat Sakeena
Sustainability Consultant
Ramboll
Thu, Feb 26, 2015
RE: LEED 2.2 Registered Projects
in LEED 2.2 Registered Projects (with the eventual adoption of LEED v4)
4 emily reese
Sustainability Consultant / Facility Planner
Jacobs Engineering
Wed, Jan 28, 2015
How to Build Your Team on LEEDuser - by Tristan Roberts
Mon, Dec 22, 2014
Stability and predictablility is needed...
in USGBC: Restore Confidence in v4 in Four Simple Steps
19 Robert Andrews
Partner - Sustainability Department Manager
AHA Consulting Engineers, Inc.
Mon, Oct 19, 2015
RE: selecting the correct rating system in v.2009
in What LEED rating system to use?
9 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 16, 2014
Special Reports and Webcasts for LEEDuser Members - by Tristan Roberts
Mon, Dec 15, 2014
Store
in Most Downloaded LEEDuser Documentation Templates, Calculators, and Samples
1 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Dec 10, 2014
Title Comments Most Recent Post Location
RE: Success substituting the LEEDv4 approach for WEc1 in v2009?
in NC 2009 WEc1: Water Efficient Landscaping
427 deborah lucking
associate
fentress architects
Tue, Apr 19, 2016
Open Space: Fence
in NC-v4: Open space
7 Sophie Brauer
Architect MAA
Gottlieb Paludan Architects
Tue, Apr 19, 2016
Denmark
preventive maintenance program
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
54 Kimberly Hosken
green building consultant
subcontractor
Mon, Apr 18, 2016
United States
Metered urinals...
in NC 2009 WEc3: Water Use Reduction
123 Ward Miller
Chief Environmental Officer
Alpenglow Advisory
Mon, Apr 18, 2016
Romania
Automatic metered urinals
in CS 2009 WEp1: Water Use Reduction—20% Reduction
217 Ward Miller
Chief Environmental Officer
Alpenglow Advisory
Mon, Apr 18, 2016
Bulgaria
Turf-grass area
in NC-v4: Site development - protect or restore habitat
11 Jody Lee Potvin-Jones
Mon, Apr 18, 2016
Clarification on EVSE demand response requirements
in NC-v4: Green vehicles
14 Francis McNulty
OCSC
Mon, Apr 18, 2016
Ireland
RE: State of Illinois Smoking Law
in NC-2009 IEQp1: Minimum IAQ Performance
1,030 Heather Holdridge
Sustainability Coordinator
Lake/Flato Architects
Fri, Apr 15, 2016
Bamboo Flooring to be considered in certified wood calculations
in NC 2009 MRc7: Certified Wood
481 ABDUL MUTHALIB MOHAMED
INNOWELL ENGINEERING INTERNATIONAL PVT LTD
Fri, Apr 15, 2016
Bangladesh
Changes to Campus Boundary?
in MPR3: Must use a reasonable site boundary
232 David Gibney
Technical Director for Sustainable Design
M+W Group
Fri, Apr 15, 2016
United States
LEED Project Baundary
in MPR3: Must use a reasonable site boundary
9 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Fri, Apr 15, 2016
Argentina
Modeling DCV Savings for Proposed Building
in CS-2009 IEQp1: Minimum IAQ Performance
151 Bernard Sagaiyaraj
Director
Blue Snow Consulting and Engineering Sdn. Bhd.
Fri, Apr 15, 2016
Malaysia
Ventilated Interior Door
in Homes-v4: Advanced utility tracking
1 Mitchell Toews
Lynden Door | VanAir Design
Thu, Apr 14, 2016
United States
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - lamps
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
Purchasing Calculator updated 4/8/2016
in EBOM-v4: Purchasing - ongoing
5 Trista Little
Sustainability Manager
YR&G
Thu, Apr 14, 2016
MPR3 - Hotel in Mixed Use Building
in MPR3: Must use a reasonable site boundary
3 Sara Zoumbaris
Sustainable Design Consulting
Thu, Apr 14, 2016
United States
Precertification credits online
in CS 2009 WEc3: Water Use Reduction
20 Jakub Netolicky
Mr.
PM Group CZ
Thu, Apr 14, 2016
Czech Republic
RE: Campus project - joint ESC plan and measures
in NC 2009 SSp1: Construction Activity Pollution Prevention
284 Kristina Bach
Sustainability Specialist
Wed, Apr 13, 2016
SSc1 Path 12: EV Charging Stations
in CI 2009 SSc1: Site Selection
222 Alaina Ladner
Designer
Huntsman Architectural Group
Wed, Apr 13, 2016
United States
Credit 7.1 and 7.2
in NC 2009 SSc7.1: Heat Island Effect—Nonroof
285 Alejandro Macias
Wed, Apr 13, 2016
Mexico
Title Comments Post date Most Recent Post Location
Data Center Modeling - LEED CS version 2009
in CS 2009 EAp2: Minimum Energy Performance
1,047 Anurag Joshi
Wed, Apr 20, 2016
2016-04-20 11:01 United States
Option 4 - Transit Services Referenced
in ND-v2009: Transportation demand management
7 Sara Zoumbaris
Sustainable Design Consulting
Wed, Apr 20, 2016
2016-04-20 10:51 United States
SSc4.3 Sign Text
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
448 Steve Valev
Tue, Apr 19, 2016
2016-04-19 16:41 United States
SLLc6 in v2009 vs v4 - no slopes do/don't qualify?
in ND-v4: Steep slope protection
2 Hannah Silver
Tue, Apr 19, 2016
2016-04-19 12:32 United States
Non potable water reservoir - WEc1 -NC 2009
in NC 2009 WEc1: Water Efficient Landscaping
427 Muriel Alvarez
Samconsult S.A.
Tue, Apr 19, 2016
2016-04-19 12:31 Uruguay
Multi-Family Buildings with Non-Residential Entrances
in ND-v2009: Access to civic and public space
5 Sara Zoumbaris
Sustainable Design Consulting
Tue, Apr 19, 2016
2016-04-19 11:23 United States
DDA Boundary
in NC-v4: High priority site
8 Trevor Anderson
Sustainability Consultant
Steven Winter Associates
Tue, Apr 19, 2016
2016-04-19 10:49 United States
Open Space: Fence
in NC-v4: Open space
7 Sophie Brauer
Architect MAA
Gottlieb Paludan Architects
Tue, Apr 19, 2016
2016-04-19 08:42 Denmark
Basic Doubts
in Data Centers-NC-v4: Minimum energy performance
53 Rathnashree Bharadwaj
Tue, Apr 19, 2016
2016-04-19 06:29 India
credit for renewables on site?
in NC 2009 EAc6: Green Power
189 Melissa Merryweather
Director
Green Consult-Asia
Tue, Apr 19, 2016
2016-04-19 05:30 Vietnam
Ashrae 90.1 2010 Appendix G
in NC-v4: Minimum energy performance
75 junaid naseer
Tue, Apr 19, 2016
2016-04-19 01:28 Saudi Arabia
Option 1 Path 2 Temperature and Humidty Requirements
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
322 Amy Harmon
Scheeser Buckley Mayfield
Mon, Apr 18, 2016
2016-04-18 17:20 United States
Calculation based on chilled water meters
in Retail–CI-v2009: On-site renewable energy
10 Maria Isabel Conde
Owner
Aqua Terra (Panama) S.A.
Mon, Apr 18, 2016
2016-04-18 16:56 Panama
preventive maintenance program
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
54 Kimberly Hosken
green building consultant
subcontractor
Mon, Apr 18, 2016
2016-04-18 15:10 United States
Multi Scene Control for Lighting
in NC-v4: Minimum energy performance
75 Gabriela Crespo
CxA, LEED AP BD+C, O+M
Revitaliza Consultores
Mon, Apr 18, 2016
2016-04-18 14:29 Mexico
Metered urinals...
in NC 2009 WEc3: Water Use Reduction
123 Ward Miller
Chief Environmental Officer
Alpenglow Advisory
Mon, Apr 18, 2016
2016-04-18 12:06 Romania
Automatic metered urinals
in CS 2009 WEp1: Water Use Reduction—20% Reduction
217 Ward Miller
Chief Environmental Officer
Alpenglow Advisory
Mon, Apr 18, 2016
2016-04-18 11:54 Bulgaria
Hose bibs - permanent irrigation
in CS 2009 WEc1: Water Efficient Landscaping
72 Petr Lhoták
Sustainability Consultant
Skanska Czech Republic
Mon, Apr 18, 2016
2016-04-18 08:31 Czech Republic
Clarification on EVSE demand response requirements
in NC-v4: Green vehicles
14 Francis McNulty
OCSC
Mon, Apr 18, 2016
2016-04-18 06:26 Ireland
Defintion of the term "Legal Wood"
in NC-2009: Legal Wood
9 Andres Schwarz
Principal
NRG-AR
Sun, Apr 17, 2016
2016-04-17 10:40 Argentina

Copyright 2016 – BuildingGreen, Inc.