LEEDuser Forum

The following discussions are happening right now all around our LEED credit forums. If you don't find what you're looking for below, check our LEED credit menu or the list of hot discussion topics to the right.

Title Comments Most Recent Post Location
RE: furniture heights
in CI-v4: Quality views
2 emily reese
Sustainability Consultant
Jacobs
Tue, Apr 18, 2017
United States
RE: asbestos contamination
in CI-v4: Innovation
8 emily reese
Sustainability Consultant
Jacobs
Tue, Apr 18, 2017
RE: brownfield confusion
in NC-v4: High priority site
19 emily reese
Sustainability Consultant
Jacobs
Tue, Apr 18, 2017
Off-site Off-set Documentation Requirements
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
295 Amber Richane
Performance Driven Design Lead
CallisonRTKL
Tue, Apr 18, 2017
RE: Vertically Attached Project
in CS v4: Optimize energy performance
6 Marcus Sheffer
LEED Fellow
7group
Tue, Apr 18, 2017
RE: Motorcycle parking spaces
in NC-v4: Reduced parking footprint
51 Dana Waters
Air Pollution Specialist
California Air Resources Board
Tue, Apr 18, 2017
Dynamic Glazing for IDC ?
in NC-v4: Innovation
20 Sriranjani Ramachandran
Tue, Apr 18, 2017
United States
RE: Which Standard to use?
in NC-2009 IEQp1: Minimum IAQ Performance
1,085 Andrew Mitchell, P.E.
Principal
Mitchell Gulledge Engineering, Inc.
Tue, Apr 18, 2017
Pressurization requirements in LEED v4
in NC-v4: Environmental tobacco smoke control
9 Judhajit Chakraborty
Building Performance Specialist
WSP Built Ecology
Tue, Apr 18, 2017
belated project registration / certification process feedback
in CS v4: Construction activity pollution prevention
3 Daniela Mendez
Civil Engineer
Tue, Apr 18, 2017
Mexico
Herbicides and Pesticides used during performance period
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
91 Joseph Snider, AIA, LEED Fellow
LEED Architect
SEQUIL Systems, Inc.
Tue, Apr 18, 2017
United States
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Tue, Apr 18, 2017
United States
RE: Partitioned office space clarification
in WELL Building Standard Discussion Forum
66 Carina Clark
Interior Designer
HKS
Tue, Apr 18, 2017
Resources Links not working
in NC 2009 SSp1: Construction Activity Pollution Prevention
307 RYAN BEN SABILALA
Tue, Apr 18, 2017
RE: Projects in Europe
in Pilot Credit 102: Legal Wood
22 Jason Grant
Principal
Jason Grant Consulting
Mon, Apr 17, 2017
RE: Confidential space
in CI-v4: Must use reasonable LEED boundaries
7 David Posada
Integrated Design & LEED Specialist
SERA Architects
Mon, Apr 17, 2017
RE: change owner's represnetative name
in Required Signatories in LEED Online Forms
79 mostafa mohamed
Mon, Apr 17, 2017
Calibration
in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
55 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Mon, Apr 17, 2017
Mexico
RE: Demolished and rebuilt envelope
in NC-v4: Minimum energy performance
183 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 17, 2017
RE: Definition of vegetated open space area
in NC 2009 SSc5.2: Site Development—Maximize Open Space
202 Allison Smith
Sustainable Design Coordinator
HKS Architects
Mon, Apr 17, 2017
Title Comments Most Recent Post Location
RE: Vertically Attached Project
in CS v4: Optimize energy performance
6 Marcus Sheffer
LEED Fellow
7group
Tue, Apr 18, 2017
RE: Motorcycle parking spaces
in NC-v4: Reduced parking footprint
51 Dana Waters
Air Pollution Specialist
California Air Resources Board
Tue, Apr 18, 2017
Dynamic Glazing for IDC ?
in NC-v4: Innovation
20 Sriranjani Ramachandran
Tue, Apr 18, 2017
United States
RE: Which Standard to use?
in NC-2009 IEQp1: Minimum IAQ Performance
1,085 Andrew Mitchell, P.E.
Principal
Mitchell Gulledge Engineering, Inc.
Tue, Apr 18, 2017
Pressurization requirements in LEED v4
in NC-v4: Environmental tobacco smoke control
9 Judhajit Chakraborty
Building Performance Specialist
WSP Built Ecology
Tue, Apr 18, 2017
belated project registration / certification process feedback
in CS v4: Construction activity pollution prevention
3 Daniela Mendez
Civil Engineer
Tue, Apr 18, 2017
Mexico
Herbicides and Pesticides used during performance period
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
91 Joseph Snider, AIA, LEED Fellow
LEED Architect
SEQUIL Systems, Inc.
Tue, Apr 18, 2017
United States
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Tue, Apr 18, 2017
United States
Resources Links not working
in NC 2009 SSp1: Construction Activity Pollution Prevention
307 RYAN BEN SABILALA
Tue, Apr 18, 2017
RE: Projects in Europe
in Pilot Credit 102: Legal Wood
22 Jason Grant
Principal
Jason Grant Consulting
Mon, Apr 17, 2017
RE: Confidential space
in CI-v4: Must use reasonable LEED boundaries
7 David Posada
Integrated Design & LEED Specialist
SERA Architects
Mon, Apr 17, 2017
Calibration
in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
55 Gustavo De las Heras Izquierdo
Arch. Eng. LEED AP BD+C; O+M; CxA: Green Rater in Training
Revitaliza Consultores
Mon, Apr 17, 2017
Mexico
RE: Demolished and rebuilt envelope
in NC-v4: Minimum energy performance
183 Marcus Sheffer
LEED Fellow
7group
Mon, Apr 17, 2017
RE: Definition of vegetated open space area
in NC 2009 SSc5.2: Site Development—Maximize Open Space
202 Allison Smith
Sustainable Design Coordinator
HKS Architects
Mon, Apr 17, 2017
RE: Catering Kitchen
in NC 2009 IEQc6.1: Controllability of Systems—Lighting
378 Heather Holdridge
Sustainability Coordinator
Lake/Flato Architects
Mon, Apr 17, 2017
Project size extended in the middle of construction
in MPR4: Must comply with minimum floor area requirements
15 wachira sosaeng
Sat, Apr 15, 2017
Thailand
RE: Points in Addition to Renewable Energy Production?
in NC-v4: Optimize energy performance
41 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
RE: CFR and O&M Plan vs Systems Manual and OMM
in CI-v4: Fundamental commissioning and verification
12 Scott Bowman
LEED Fellow
Integrated Design + Energy Advisors, LLC
Fri, Apr 14, 2017
Process Water
in Retail–NC-v2009: Water use reduction
6 Donald Green
Operations Manager
ai Design Group
Fri, Apr 14, 2017
RE: Residential applications
in NC-v4: Advanced energy metering
6 Marcus Sheffer
LEED Fellow
7group
Fri, Apr 14, 2017
Title Comments Most Recent Post Location
RE: Additional information
in LEED-EBOM Platinum Project Shares Documentation with LEEDuser
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Nov 27, 2015
RE: Free Certification
in First-in-Country Projects to Get Free LEED Certification
7 Saud Abdul Rasheed
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
Mon, Nov 9, 2015
RE: Correct spelling for Miranda
in Congratulations 2015 LEED Fellows
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, Oct 22, 2015
RE: Full support
in USGBC Plans to Make LEED 2009 Stricter on Energy
2 Suzanne Painter-Supplee, LEED AP+ID&C
Principal
SEESolutions LLC
Fri, Oct 23, 2015
RE: Innovation Award
in Announcing the LEEDuser Innovation Award
4 Neil Rosen
Director of Sustainability
Northwell Health
Mon, Oct 12, 2015
United States
RE: Congrats Paula!
in Why I’m About to Fail the New, Harder LEED v4 AP Exam
10 PAULA HERNANDEZ
MRS.
INGENIERO MARIO PEDRO HERNANDEZ
Mon, Sep 21, 2015
RE: Do parking garages need to be included in the LEED project?
in LEED Certifications for Parking Garages No Longer Allowed
16 Jon Clifford
LEED-AP BD+C
GREENSQUARE
Thu, Apr 20, 2017
EBie Awards 2015 Finalists Announced by Urban Green - by Tristan Roberts
Tue, May 19, 2015
MR - Ongoing Purchasing and Waste Policy - Food waste (compost)
in LEED for Existing Multifamily Unveiled for Comment
1 Julien Lafond
Altanova, LLC
Thu, Aug 27, 2015
RE: OPR for LEED ND
in LEED for Neighborhood Development (LEED-ND) Forum
186 Casey Studhalter
Project Manager, LEED
USGBC
Wed, Apr 1, 2015
How to Build Your Team on LEEDuser - by Tristan Roberts
Mon, Dec 22, 2014
Stability and predictablility is needed...
in USGBC: Restore Confidence in v4 in Four Simple Steps
19 Robert Andrews
Partner - Sustainability Department Manager
AHA Consulting Engineers, Inc.
Mon, Oct 19, 2015
Special Reports and Webcasts for LEEDuser Members - by Tristan Roberts
Mon, Dec 15, 2014
Store
in Most Downloaded LEEDuser Documentation Templates, Calculators, and Samples
1 Bill Swanson
PE, LEED AP
Integrated Architecture
Fri, Dec 9, 2016
The 10 Most Popular LEEDuser Forums - by Tristan Roberts
Thu, Dec 4, 2014
RE: LEED v4 rating systems being translated to Spanish
in Latin America and the Caribbean
17 Marge Barradas Machin
Wed, Oct 29, 2014
RE: Keeping them up to date
in China
5 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Oct 24, 2014
China
Congratulations 2014 LEED Fellows - by Tristan Roberts
Mon, Oct 20, 2014
LEED v4 rating systems being translated to Spanish
in South America
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Oct 20, 2014
LEED v4 rating systems being translated to Portuguese
in Brazil
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Oct 20, 2014
Brazil
Title Comments Most Recent Post Location
Power generator
in NC-v4: Acoustic performance
21 Alicja Bieszyńska
Skanska
Thu, Apr 6, 2017
Temporary potable connection to a permanent irrigation system
in Schools 2009 WEc1: Water Efficient Landscaping
31 Bradley Smith
Mithun
Wed, Apr 5, 2017
United States
About Existing Building for Retail
in EBOM-v4: Minimum indoor air quality performance
14 Esteban Martinez
LEED Consultant
Green Loop
Wed, Apr 5, 2017
Colombia
RE: How to use combination of Option 1 and Option 2?
in NC 2009 MRc5: Regional Materials
384 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Apr 5, 2017
RE: Bike Racks
in NC 2009 MRc4: Recycled Content
658 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Wed, Apr 5, 2017
United States
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
in NC-v4: Outdoor water use reduction
28 R2M Solution Srl
R2M Solution Srl
Wed, Apr 5, 2017
Italy
RE: Motorcycle parking spaces
in NC-v4: Reduced parking footprint
51 Dana Waters
Air Pollution Specialist
California Air Resources Board
Tue, Apr 4, 2017
Systems requiring metering
in CS v4: Advanced energy metering
5 Tim Nabholz
Sustainability Consultant
Mission Green Buildings
Tue, Apr 4, 2017
Canada
project with complete demolition of the old building.
in NC 2009 IEQc3.1: Construction IAQ Management Plan—During Construction
162 Qian Tang
Tue, Apr 4, 2017
Operable Windows
in CI-v4: Thermal comfort
3 Sondra Camis
Mon, Apr 3, 2017
United States
Combined Purchasing
in EBOM 2009 MRp1: Sustainable Purchasing Policy
40 Ryan Hoffman
Heapy Engineering
Mon, Apr 3, 2017
United States
Multi-use project
in Mid-Rise v4: Must use reasonable LEED boundaries
1 Vanessa Toralti
LEED consultant, architecture
AEdifica
Mon, Apr 3, 2017
Canada
RE: Innovation credit on cultural preservation
in NC 2009 IDc1: Innovation in Design
631 emily reese
Sustainability Consultant
Jacobs
Sun, Apr 2, 2017
municipality irrigation line
in CS v4: Outdoor water use reduction
1 Radwa Amin
LEED specialist
Hill International, Africa
Sat, Apr 1, 2017
Egypt
HIT-HY 200-R
in NC 2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
553 Celimar Fournier
Project Engineer
Turner Construction
Fri, Mar 31, 2017
Temporary Irrigation with v6 Form
in NC 2009 WEc1: Water Efficient Landscaping
471 Michelle Rosenberger
Partner
ArchEcology, LLC
Fri, Mar 31, 2017
RE: Blowout toilets in v4
in NC-v4: Indoor water use reduction
42 Ben Roush
Associate
FSi consulting engineers
Fri, Mar 31, 2017
United States
RE: v4 Demand Response - typical peak load reduction "systems".
in NC-v4: Demand response
17 David Hubka
Director - Operations
Transwestern Sustainability Services
Thu, Mar 30, 2017
RE: v4 Demand Response - typical peak load reduction "systems".
in NC-v4: Demand response
17 David Hubka
Director - Operations
Transwestern Sustainability Services
Thu, Mar 30, 2017
RE: Gross area v. net area in PI Form 3 and IEQ8.1
in PIf3: Occupant and Usage Data
303 Summer Minchew
LEED AP ID+C, O+M
Ecoimpact Consulting
Thu, Mar 30, 2017
Title Comments Post date Most Recent Postsort icon Location
Non-composite wood with off-site applied coatings
in NC-v4: Low emitting materials
319 Ashley Hu
Jr. Sustainable Building Advisor
Tue, Apr 11, 2017
2017-04-11 20:07 Canada
A partial ceiling area was affected by mold
in Schools 2009 IEQc10: Mold Prevention
30 Diaa El-Masry
General Manager
Qatar Green Leaders
Tue, Apr 11, 2017
2017-04-11 12:19 Qatar
Free Address vs. Full Flexibility
in WELL Building Standard Discussion Forum
66 Carina Clark
Interior Designer
HKS
Tue, Apr 11, 2017
2017-04-11 09:52 United States
Vegetation under solar panels
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
295 Angelica Ospina Alvarado
Tue, Apr 11, 2017
2017-04-11 09:10 Colombia
Arc Platform
in Performance Period
59 Sarfaraj Khan
Commissioning & Sustainability Consultant
Green Consulting
Tue, Apr 11, 2017
2017-04-11 08:45 United Arab Emirates
Option 1 - Individual occupant spaces 3 level lighting
in NC-v4: Interior lighting
46 Mario S.
Tue, Apr 11, 2017
2017-04-11 08:07 United Arab Emirates
General Emissions Evaluation
in NC-v4: Low emitting materials
319 Joshua Chia
IEN Consultants
Tue, Apr 11, 2017
2017-04-11 07:28 Malaysia
Energy Star Protfolio Manager
in EBOM-v4: Minimum energy performance
53 Sarfaraj Khan
Commissioning & Sustainability Consultant
Green Consulting
Tue, Apr 11, 2017
2017-04-11 07:13 United Arab Emirates
plywood "exempt from testing by CARB"
in NC 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
236 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Mon, Apr 10, 2017
2017-04-10 16:56 United States
colorants (for polished concrete floor) containing formaldehyde?
in NC 2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
452 debra lombard
sustainable design consulatnt & construction administrator
Bywater Woodworks, Inc.
Mon, Apr 10, 2017
2017-04-10 15:11 United States
Indoor plants planted in the ground
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
295 Albert Sagrera
Architect
Societat Organica
Mon, Apr 10, 2017
2017-04-10 12:10 Spain
Amtrak and Megabus
in NC-v4: Access to quality transit
42 Sara Zoumbaris
Sustainable Design Consulting
Mon, Apr 10, 2017
2017-04-10 11:59 United States
Company providing Shuttle to Train Station
in NC 2009 IDc1: Innovation in Design
631 Joyce Kelly
Consultant
Architectural Fusion
Mon, Apr 10, 2017
2017-04-10 11:31 United States
CO2 monitoring for Core and Shell projects
in CS v4: Enhanced indoor air quality strategies
6 Irene Chung
Sun, Apr 9, 2017
2017-04-09 17:56 Canada
Existing small HVAC&R units
in CI-v4: Fundamental refrigerant management
1 Mercedes Ferreira
Fri, Apr 7, 2017
2017-04-07 19:56 United States
Applicablility of Options for BD+C Rating System
in Warehouses-NC-v4: Minimum energy performance
4 Mercedes Ferreira
Fri, Apr 7, 2017
2017-04-07 19:29 United States
Project Experience for Cont. Ed.
in Q&A on LEED Credential Maintenance
49 Kasandra Martin
Designer
Fri, Apr 7, 2017
2017-04-07 09:33 United States
Qualifications for ID+C rating system
in CI-v4: Must use reasonable LEED boundaries
7 Mercedes Ferreira
Thu, Apr 6, 2017
2017-04-06 19:57 United States
Baseline system for hybrid service hot water system
in NC 2009 EAp2: Minimum Energy Performance
3,964 Vernon Smith
Principal Engineer
Smith Energy Engineers, LLC
Thu, Apr 6, 2017
2017-04-06 19:40 United States
Meeting room ID+C: CI certification
in CI-v4: Must comply with project size requirements
3 Carlos Echeverria
Architect
Studio Domus
Thu, Apr 6, 2017
2017-04-06 12:39 Guatemala

Copyright 2017 – BuildingGreen, Inc.