LEEDuser Forum
There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: LEED Online with Internet Explorer 10 in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more |
333 |
Megan Koehler KMD Architects Mon, May 20, 2013 |
|
RE: SSc2 Site Area vs LEED Project Boundry in CS 2009 SSc2: Development Density and Community Connectivity |
31 |
Ellen Mitchell Sustainable Design Coordinator HKS, Inc. Mon, May 20, 2013 |
|
RE: Percantage Make-Up in Healthcare-v2009: Sustainably sourced materials and products |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Mon, May 20, 2013 |
|
Vertical addition to a hotel - site boundary in MPR3: Must use a reasonable site boundary |
97 |
Adam Targowski Owner ATsec Mon, May 20, 2013 |
|
Daylight controls in ALL daylit areas within 15 ft? in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls |
48 |
Maria Porter Environmental Certification Engineer Skanska Sweden Mon, May 20, 2013 |
|
water treatment outside LEED project boundary in NC 2009 WEc2: Innovative Wastewater Technologies |
76 |
Yasir Nurrahman Mr. Yasir PT. Indonesia Environment Consultant Mon, May 20, 2013 |
|
SS1 Option 2 Path 11 With Tenant installing PV in CI 2009 SSc1: Site Selection |
159 |
Susan Di Giulio Project Manager Zinner Consultants Sat, May 18, 2013 |
|
changing prerequisite completed forms in Pilot Credit 67: Pilot Alternative Compliance Path—EA Prerequisite 2 |
8 |
Linda Francis President Francis Consulting Sat, May 18, 2013 |
|
RE: Building Envelope Commissioning LEED required test methodology in NC 2009 EAc3: Enhanced Commissioning |
169 |
Brett Farbstein Commissioning Engineer AKF Group Fri, May 17, 2013 |
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
Canada-NC 1.0 -- EAc1 in LEED Canada Forum |
14 |
Laura Long Project Manager NORR Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
|
RE: Educational Program in CS 2009 IDc1: Innovation in Design |
42 |
Morteza Kasmaei Principal Climatic Design Inc. Fri, May 17, 2013 |
|
Vertical addition to a hotel project in MPR2: Must be a complete, permanent building or space |
45 |
Adam Targowski Owner ATsec Fri, May 17, 2013 |
|
RE: Determining FTE, PTE in PIf3: Occupant and Usage Data |
94 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, May 17, 2013 |
|
green roof cover - ivy in CS 2009 SSc7.2: Heat Island Effect—Roof |
83 |
Mario Pinoli Fri, May 17, 2013 |
|
RE: Performance Period starts after construction in Performance Period |
40 |
Karin Wohlert Northwest Sustainability Consulting, LLC Thu, May 16, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
RE: Form Questions in Healthcare-v2009: Acoustic environment |
7 |
BABAR MEHMOOD SAUD CONSULT Fri, May 17, 2013 |
|
RE: Entry mat in vestibule w/ tile surround in Schools 2009 IEQc5: Indoor Chemical and Pollutant Source Control |
28 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, May 17, 2013 |
|
RE: Meaning of "Ready to Use Products" in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings |
333 |
Alicia Silva CEO Revitaliza consultores Fri, May 17, 2013 |
|
CS - Residential Building in MPR6: Must commit to sharing whole-building energy and water usage data |
10 |
CRolim Engenharia Fri, May 17, 2013 |
|
RE: Ventilated attic roofs - Baseline Vs Proposed in CS 2009 EAc1: Optimize Energy Performance |
207 |
Marcus Sheffer LEED Fellow 7group Fri, May 17, 2013 |
|
RE: Educational Program in CS 2009 IDc1: Innovation in Design |
42 |
Morteza Kasmaei Principal Climatic Design Inc. Fri, May 17, 2013 |
|
Vertical addition to a hotel project in MPR2: Must be a complete, permanent building or space |
45 |
Adam Targowski Owner ATsec Fri, May 17, 2013 |
|
RE: Determining FTE, PTE in PIf3: Occupant and Usage Data |
94 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, May 17, 2013 |
|
green roof cover - ivy in CS 2009 SSc7.2: Heat Island Effect—Roof |
83 |
Mario Pinoli Fri, May 17, 2013 |
|
Room by Room flush-out Calculations in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy |
124 |
Lauren Glasscock Sr. Sustainability Professional DNV KEMA Energy & Sustainability Thu, May 16, 2013 |
|
Who develops the plan for corrective action? in NC 2009 IEQc7.2: Thermal Comfort—Verification |
61 |
Nicole Kimoto Thu, May 16, 2013 |
|
RE: Bicycle Storage for a Daycare in NC 2009 SSc4.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
157 |
Lauren Fakhoury Research Assistant Sustainable Design Consulting, LLC Thu, May 16, 2013 |
|
RE: Sand Filter in Pilot Credit 17: Cooling Tower Water Use |
24 |
USGBC IP Account Thu, May 16, 2013 |
|
Comprehensive waste management program in CS 2009 MRp1: Storage and Collection of Recyclables |
31 |
Michael E. Edmonds-Bauer Edmonds International Thu, May 16, 2013 |
|
RE: Dorm - shared FCU and Controls in NC 2009 IEQc6.2: Controllability of Systems—Thermal Comfort |
112 |
Larissa Oaks Specialist, LEED USGBC Thu, May 16, 2013 |
|
RE: Stormwater Inspection Checklist - Clarity/Support Needed in EBOM 2009 SSc6: Stormwater Quantity Control |
50 |
Michael DeVuono T&M Associates Thu, May 16, 2013 |
|
RE: ASHRAE 90.1 2007 in NC v2.2 EAc1: Optimize Energy Performance |
257 |
Marcus Sheffer LEED Fellow 7group Thu, May 16, 2013 |
|
Material reuse based on cost or volume in NC 2009 MRc3: Materials Reuse |
45 |
Mahbuba Khan President MnKhan Architects PLLC Thu, May 16, 2013 |
|
Non-US Projects in CI 2009 IEQc2: Increased Ventilation |
5 |
Phillip Cook WGE Wed, May 15, 2013 |
|
Property Boundry. in Pilot Credit 57: Enhanced Acoustical Performance—Exterior Noise Control |
1 |
Phillip Cook WGE Wed, May 15, 2013 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
EAp2 forum in Appendix G and anair conditioned distribution center |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
EAp2 forum in Reference building for a dewatering facility |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Thu, Mar 21, 2013 |
|
RE: Silver or higher membership required for member discounts in New USGBC Membership Fee Structure |
55 |
Hernando Miranda Owner Soltierra LLC Wed, Mar 20, 2013 |
|
RE: LEED AP v4 in LEED NC 2009 (v3) Professional Credentials |
3 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 18, 2013 |
|
RE: Why not GA? in 10 Tips for Passing the LEED Green Associate Exam |
8 |
Paula Melton Managing Editor BuildingGreen, Inc. Fri, Mar 15, 2013 |
|
RE: LEED-CS sunset date in Sunset Dates for CI/CSv2.0 |
2 |
Kristina Bach CORE Steward Cooper Carry Wed, Mar 13, 2013 |
|
asbestos roof in Asbestos Roof |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Mon, Mar 11, 2013 |
| Advice for writing a LEED EB:O+M consulting contract | - |
by Lyle Axelarris Thu, Mar 7, 2013 |
|
RE: Is it really the windows? in Poor Cell Phone Service in LEED buildings |
4 |
Bill Swanson PE, LEED AP Integrated Architecture Wed, Mar 6, 2013 |
|
RE: Recertification EAc4 in Recertification |
44 |
Alicia Chu Sustainability Advisor Healthy Buildings Thu, Feb 28, 2013 |
|
RE: Non-U.S. Regional Priority Credits for LEED ND in Non-U.S. Regional Priority Credits Added to LEED |
25 |
Melissa Merryweather Director Green Consult-Asia Fri, Feb 22, 2013 |
|
RE: LEED for Retail - MRp1 Waste Stream Study in upcoming LEED for Retail |
11 |
Caroline Hedin Fri, Feb 22, 2013 |
|
RE: use of LEED logo in LEED Logo usage on a video |
4 |
Antonio Rodriguez LEED AP BD+C SYASA - México Thu, Feb 21, 2013 |
|
RE: advanced buildings doc in Where can I find a copy of "Advanced Buildings: Energy Benchmark for High Performance Buildings (E-Benchmark)”? |
5 |
Victor Avedano Principal JALRW Eng. Group Inc. Thu, Feb 21, 2013 |
|
RE: Major Tenant Build-out During Certification Period in Major Tenant Build-out During Certification Period |
4 |
Jennifer Knocha Assistant Mack-Cali Realty Corporation Thu, Feb 14, 2013 |
|
IEQc3.1 in Requirment of Equipment storage yard |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Feb 5, 2013 |
|
LEED-EBOM stress test in Where Do I Start? |
1 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Fri, Feb 1, 2013 |
|
RE: Elevators - Energy Consumption - Sources in Attaining credits through advanced elevator technology? |
6 |
Susan Walter Sr Project Architect Wilmot/Sanz Fri, Feb 1, 2013 |
|
RE: Precertification and site/building area change in LEED-CS v3 Precertification |
37 |
Sandro Tubertini BDSP Thu, Jan 31, 2013 |
|
RE: Best energy modeling software in What is the best strategy/software to model District Cooling for LEED |
5 |
Susan Walter Sr Project Architect Wilmot/Sanz Tue, Jan 29, 2013 |
| Title | Votes | Comments | Most Recent Post |
|---|---|---|---|
|
RE: RECs providers... in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
287 | 67 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, Jan 27, 2010 |
|
Process water for EP point in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
287 | 55 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Tue, Dec 22, 2009 |
|
RE: Recycling in CI 2009 MRp1: Storage and Collection of Recyclables |
286 | 48 |
Peter Doo Doo Consulting LLC Tue, Jan 26, 2010 |
|
Depth of data collection required in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables |
285 | 49 |
Chris Munn Director, National Operations Chelsea Group, Ltd. Tue, Dec 1, 2009 |
|
What you are saying is indeed in Schools 2009 SSc9: Site Master Plan |
285 | 19 |
Erik Bergstrom Green Building Associate Wed, Dec 9, 2009 |
|
Energy Star for a Manufacturing - Assembly Company in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment |
283 | 73 |
Robert McNeice Thu, Dec 3, 2009 |
|
Automatic Credits for tenant improvement in new LEED Silver bldg in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
282 | 53 |
Judy Peterson Sr. Associate - NW Interior Design Heery International Wed, Sep 2, 2009 |
|
"Building Completed 1993 or Later" Tab on Graph in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency |
282 | 55 |
April Ambrose Sustainability Consultant: Senior Project Manager Viridian Fri, Jan 22, 2010 |
|
Designated Smoking Areas in parking garages in EBOM 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
281 | 71 |
Jason Franken Sustainability Professional Tue, Jun 2, 2009 |
|
How many showers & racks are needed? in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
281 | 73 |
Adolfo Silva Principal Ecovert Corporation Thu, Dec 17, 2009 |
|
RE: Which Spaces Should Be Included? in NC 2009 IEQc2: Increased Ventilation |
281 | 54 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 19, 2010 |
|
Regionally manufactured materials in NC 2009 MRc5: Regional Materials |
279 | 143 |
Carrie Gunzel Mon, Dec 7, 2009 |
|
RE: Pin-based CFL's in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps |
278 | 102 |
Drew Johnson LEED AP O+M Tue, Dec 29, 2009 |
|
Off Site Renewable Energy in EBOM 2009 EAc4: On-Site and Off-Site Renewable Energy |
278 | 67 |
Reynaldo Castro Sat, Jan 9, 2010 |
|
ISSUE Part 2 in CI-2009 IEQp1: Minimum IAQ Performance |
278 | 96 |
Green Living LLC Elizabeth Gharib Tue, Jan 26, 2010 |
|
RE: Off gasing furniture in CI 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
278 | 55 |
Seema Pandya Senior Sustainability Manager YR&G sustainability Tue, Jan 5, 2010 |
|
RE: What constitutes a "Master Plan"? in Schools 2009 SSc9: Site Master Plan |
278 | 19 |
Shannon Gray Consultant YRG sustainability Mon, Jan 4, 2010 |
|
Recycling in CI 2009 MRp1: Storage and Collection of Recyclables |
278 | 48 |
Peter Doo Doo Consulting LLC Thu, Jan 21, 2010 |
|
Question Regarding Requirements in Schools 2009 IEQc8.2: Daylight and Views—Views |
277 | 55 |
John Drigot Design/LEED Specialist The Neenan Company Mon, Sep 28, 2009 |
|
Existing bike storage and showers in CI 2009 SSc3.2: Alternative Transportation—Bicycle Storage and Changing Rooms |
277 | 73 |
Peter Doo Doo Consulting LLC Tue, Nov 17, 2009 |
| Title | Comments | Most Recent Post |
|---|---|---|
|
Unusual FTE in EBOM 2009 SSc4: Alternative Commuting Transportation |
232 |
Erin Nuckols Sustainable Building Associate Institute for the Built Environment Tue, May 14, 2013 |
|
Design Build Contractual Question- EAc3 in NC v2.2 EAp1: Fundamental Commissioning of Building Energy Systems |
42 |
Bob Crowell Vice President / Principal 2rw Consultants, Inc. Tue, May 14, 2013 |
|
Water Efficient Landscaping in NC 2009 WEc1: Water Efficient Landscaping |
236 |
Sundararaj Subburaman Director Ecopro Design Consultancy Private Limited Tue, May 14, 2013 |
|
Submitted drawings in PIf4: Schedule and Overview Documents |
39 |
Ashley Sadowski DRAW Architecture + Urban Design Mon, May 13, 2013 |
|
Free map tools Google maps in How to Document SSc2 with Map Data |
30 |
Terence Heron Mon, May 13, 2013 |
|
PI Form 3 occupancy question, transient student vs retail in PIf3: Occupant and Usage Data |
94 |
Mike Stopka Director of Sustainability Solomon Cordwell Buenz Mon, May 13, 2013 |
|
Appropriate use of Core and Shell? in PIf5: Building System Control |
6 |
Kath Williams LEED Fellow, Principal Kath Williams + Associates Mon, May 13, 2013 |
|
LEED EB for a Hospital in LEED-EBOM: Eight Steps to Success |
30 |
Brendan Molony Mon, May 13, 2013 |
|
How to define ‘Roof Area’ in CS 2009 SSc7.2: Heat Island Effect—Roof |
83 |
Christina Nybergh LEED AP BC+D Skanska Talonrakennus Oy Mon, May 13, 2013 |
|
ET0 for Beijing in CS 2009 WEc1: Water Efficient Landscaping |
37 |
JIN PARK SAMOO Architects Sun, May 12, 2013 |
|
WEc1 Water Efficient Landscaping in NC 2009 WEc1: Water Efficient Landscaping |
236 |
Brian Kelly Project Designer UED Fri, May 10, 2013 |
|
Private Bus Service in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access |
97 |
Daniel R Gutierrez Project Architect INGETEC Thu, May 9, 2013 |
|
Commissioning Services Contracted Through Design Firm? in CI 2009 EAp1: Fundamental Commissioning of Building Energy Systems |
53 |
Jaclyn Whitaker AIA LEED AP BD+C Assistant Director of Sustainability HLW International Thu, May 9, 2013 |
|
Calculating "Projection Factor" for curtainwall shading devices in CS 2009 EAp2: Minimum Energy Performance |
518 |
Amit Ahiel Thu, May 9, 2013 |
|
added FAQ in NC 2009 IEQp2: Environmental Tobacco Smoke (ETS) Control |
189 |
Tristan Roberts LEED AP BD+C, Editorial Director – LEEDuser BuildingGreen, Inc. Wed, May 8, 2013 |
|
Eliminating Multiple Responses From One Person - Survey Changes in EBOM 2009 SSc4: Alternative Commuting Transportation |
232 |
Kevin Kelly Wed, May 8, 2013 |
|
2 options, Flush out and Air testing in Schools 2009 IEQc3.2: Construction IAQ Management Plan—Before Occupancy |
23 |
Yazmin Trueba Project Engineer Sundt Construction Tue, May 7, 2013 |
|
MPR 2 - Separate Ownership in MPR2: Must be a complete, permanent building or space |
45 |
Jonathan Weiss Tue, May 7, 2013 |
|
Mixed Ventilation in NC 2009 IEQc2: Increased Ventilation |
54 |
PAULA HERNANDEZ MRS. INGENIERO MARIO PEDRO HERNANDEZ Tue, May 7, 2013 |
|
LEEDUser vs. USGBC in Pilot Credit 34: Design for Adaptability |
7 |
Nicholas Swinehart Mon, May 6, 2013 |



