LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post
RE: v4 Demand Response - No on-site Elec Generation
in NC-v4: Demand response
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 6, 2014
RE: CA 01350-compliant bambo flooring isn't NAUF
in Schools IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
23 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Mar 6, 2014
RE: Integrative Process
in Pilot Credit 60: Integrative Process
4 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Thu, Mar 6, 2014
Data Center Energy Calculator Tool
in Data Centers-NC-v4: Optimize energy performance
3 Jack Jenkins
Consultant
rda|hurleypalmerflatt
Thu, Mar 6, 2014
RE: Plumbing Commissioning Scope Of Work
in NC-v4: Fundamental commissioning and verification
2 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Wed, Mar 5, 2014
No documents to prove compiance
in CS 2009 SSc1: Site Selection
11 Saud Abdul Rasheed
LEED Engineer
Al Yamama Company
Wed, Mar 5, 2014
The RPCs have been updated
in Non-U.S. Regional Priority Credits Added to LEED
26 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Mon, Mar 3, 2014
RE: Are filing cabinets included
in NC-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
25 Farah A.
Sat, Mar 1, 2014
RE: Historical Buildings with Protected Facades
in ND-v2009: Minimum building energy efficiency
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Feb 28, 2014
RE: Option 3 - Air-cooled chillers
in Healthcare-v2009: Minimum energy performance
5 jorge torres coto
Building Systems Commissioning Engineer
Empirical Engineering, LLC
Fri, Feb 28, 2014
Anyone in the UK has achieved this credit?
in CS 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
11 Carine Guenand
Assistant Design Manager
Skanska Construction UK
Thu, Feb 27, 2014
RE: Looking forward to your feedback
in Pilot Credit 12: Reduced Automobile Dependence
47 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Pilot Credits and LEED v4
in Pilot Credit 18: Appliance & Process Water Use Reduction
36 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Feb 25, 2014
RE: Carpet Waste Conversion Factor and long-term volume diversion tr
in EBOM 2009 MRc9: Solid Waste Management—Facility Alterations and Additions
29 Jubilee Daniels, MLA, LEED AP O+M
Consultant, Sustainable Buildings and Operations
Jubilee Environmental Consulting
Tue, Feb 25, 2014
RE: Building with different uses
in MPR5: Must comply with minimum occupancy rates
16 Trista Little
Sustainability Manager
YR&G
Tue, Feb 25, 2014
RE: Exclude existing parking with certification of building addition
in Schools 2009 SSc7.1: Heat Island Effect—Nonroof
20 Crissy Tsai
Sustainability Coordinator
Webcor Builders
Mon, Feb 24, 2014
RE: Existing constructions and non infiltration water tanks
in ND-v2009: Rainwater management
4 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Fri, Feb 21, 2014
RE: IDp1 Health Mission Statement
in Healthcare-v2009: Integrated project planning and design
2 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, Feb 21, 2014
RE: Calculating Walking Distances
in ND-v2009: Locations with reduced automobile dependence
18 Vita Shklovsky
Wed, Feb 19, 2014
RE: Number of cycles
in EBOM-v4: Cooling tower water use
4 Batya Metalitz
Manager, LEED Technical Development
USGBC
Wed, Feb 19, 2014
Title Comments Most Recent Post
RE: Terrazzo and on-site assembly
in NC v2.2 MRc5: Regional Materials
117 Jon Clifford
LEED-AP BD+C
GREENSQUARE ∙ Sustainability ∙ Construction ∙ Specifications
Thu, Jan 9, 2014
RE: Existing bicycle network
in ND-v2009: Bicycle network and storage
9 Regina Ng
Thu, Jan 9, 2014
RE: CO2 sensors in duct work
in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring
11 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional, Guiding Principles Compliance Professional
Energy Ace
Wed, Jan 8, 2014
RE: storage without reusing
in NC v2.2 SSc6.1: Stormwater Design—Quantity Control
41 Michael DeVuono
Senior Staff Designer
T&M Associates
Tue, Jan 7, 2014
RE: LEED CS - credit 4.1
in CS 2009 SSc4.1: Alternative Transportation—Public Transportation Access
21 K KRAFT
Thu, Jan 2, 2014
RE: Timing of the post occupancy commissioning
in CS-2009 EAc3: Enhanced Commissioning
32 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Thu, Jan 2, 2014
RE: Shuttle distance to light rail station
in NC v2.2 SSc4.1: Alternative Transportation—Public Transportation Access
25 Sheryl Swartzle
LEED administration
TLC Engineering for Architecture
Tue, Dec 24, 2013
RE: Possible Points
in Retail–CI-v2009: Green power
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Dec 23, 2013
RE: Stone counter adhesive/filler - problem with VOCs
in Homes-v2008: Environmentally preferable products
2 Ann Edminster
founder/principal
Design AVEnues LLC
Mon, Dec 23, 2013
RE: Recycling in Malaysia
in CI 2009 MRp1: Storage and Collection of Recyclables
57 Susan Walter
Sr Project Architect
Wilmot/Sanz
Mon, Dec 23, 2013
RE: Calculation for recycling storage area
in Healthcare-v2009: Storage and collection of recyclables
10 YP Pierce
Mon, Dec 23, 2013
RE: Change of credits for Regional Priority
in CS 2009 RPc1: Regional Priority
16 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: synergy with SSc5.1
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
81 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: VOC Budget Process - If you make a mistake, you can still get it
in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings
78 Walter Currin
Project Architect
SHW Group
Fri, Dec 20, 2013
RE: Documentation for DES systems?
in NC v2.2 EAc3: Enhanced Commissioning
51 Scott Bowman
Owner
Integrated Design + Energy Advisors, LLC
Fri, Dec 20, 2013
RE: Does this credit apply for dorms?
in NC v2.2 EQc7.1: Thermal Comfort—Design
26 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Dec 20, 2013
RE: Background Noise Measurements
in Schools 2009 IEQp3: Minimum Acoustical Performance
136 Daniel Hicks
Daniel Hicks, E.I., INCE
Geiler & Associates
Thu, Dec 19, 2013
RE: Building reuse for parking deck?
in Healthcare-v2009: Building reuse - maintain existing walls, floors and roof
3 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Dec 19, 2013
RE: Previously developed?
in ND-v2009: Preferred locations
11 Michael DeVuono
Senior Staff Designer
T&M Associates
Thu, Dec 19, 2013
RE: Can A project Team Perform that credit
in Schools SSp2: Environmental Site Assessment
52 Larry Sims
Principal
Studio4, LLC
Tue, Dec 17, 2013
Title Comments Most Recent Post
LEED certification for zoo
in New Exhibit Problem
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 20, 2011
phased construction and LEED certification
in Impact of project construction phasing on LEED submittal?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, May 19, 2011
keeping LEED records
in Keeping and MAintaining records after LEED Certification
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, May 19, 2011
RE: Bed Formatting
in Incongruous DES District Steam Policy
2 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Sat, Jul 30, 2011
LEED EBOM
in LEED EB Presentation
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Thu, May 12, 2011
Underground parking under adjacent building
in Underground parking under adjacent building
1 Michelle Halle Stern
Principal
The Green Facilitator
Fri, Apr 29, 2011
RE: Re: Project Summary
in Project Summary - mandatory or just suggested
4 Breana Detzler
Project Designer
Risinger + Associates
Thu, Apr 28, 2011
RE: LEED Online form improvements
in Beta Credit Versions
7 Breana Detzler
Project Designer
Risinger + Associates
Tue, Apr 26, 2011
campus forum
in Phased Construction and Early Release Packages
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
performance period forum
in Increased occupancy during performance period
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
performance period forum
in Question about performance period and submitting the documentation
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
fuel cells and LEED
in Fuel Cell question LEED points
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
Indoor Environment courses - by Scott Kriner
Thu, Apr 21, 2011
RE: Any one, please comment on
in Can we submit a new credit at Clarification stage of Construction Review?
5 bala srini
Senior Project Manager
Sustainability by Design
Thu, Apr 21, 2011
upgrading to LEED-EBOM 2009
in Change the version of LEED - EB - O & M (V.2008 to v.2009)
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
LEED documentation samples
in LEED Calculation examples
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
RE: LEED for Healthcare in Second Public Comment Period
in LEED for Healthcare in Second Public Comment Period
3 Susan Walter
Sr Project Architect
Wilmot/Sanz
Fri, Apr 15, 2011
LEED ND AND EBOM - by Gurpreet Misra
Mon, Apr 4, 2011
Review of Advanced Energy Modeling for LEED Technical Manual - by Shillpa Singh
Tue, Apr 26, 2011
performance period start date
in Credits where Performance Period must include a specific day of the year?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 28, 2011
Title Votes Comments Most Recent Post
RE: Collected StromWater for irrigation
in EBOM 2009 SSc6: Stormwater Quantity Control
86 61 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, Sep 16, 2010
Do these requirements apply to tenanted areas too ?
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
86 55 Omar Katanani
Tue, Sep 14, 2010
All ACP for international projects allow Metric Unit submittals
in International Projects - alternative compliance path
86 154 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Fri, Oct 28, 2011
RE: All ACP for international projects allow Metric Unit submittals
in International Projects - alternative compliance path
86 154 Eric Johnson
Principal Sustainability Project and Cost Manager
Green Future Now
Tue, Nov 29, 2011
RE: Outdoor Air Contamination
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
86 247 Dylan Connelly
Mechanical Engineer
Integral Group
Thu, Jan 10, 2013
RE: pest management control
in EBOM 2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
86 72 Pablo Fortunato Suarez
Principal ESD Consultant/Architect
GreenArc Sustainable Building & Architecture
Fri, Jul 16, 2010
Reused furniture from old office
in CI 2009 MRc5: Regional Materials
86 92 Lauren Sparandara
Sustainability Manager
Google
Tue, Aug 24, 2010
IEQc5 requirements eased up
in A Guide to the Key LEED BD&C v2009 Addenda - NC, CS, Schools
86 51 Hernando Miranda
Owner
Soltierra LLC
Wed, Jul 25, 2012
RE: Batteries - annual actual diversion performance verification
in EBOM 2009 MRc7: Solid Waste Management—Ongoing Consumables
86 61 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Mon, Feb 21, 2011
EQc6.1 for enclosed offices
in CI 2009 IEQc6.1: Controllability of Systems—Lighting
86 54 Paladino &Company
Paladino and Company
Mon, Sep 27, 2010
Exemplary Performance in Stage 1
in LEED for Neighborhood Development (LEED-ND) Forum
86 179 Daniel Costantino
Urban Planner, LEED AP ND
Ecology & Environment, Inc.
Wed, Feb 1, 2012
Status of corridors/hallways for IEQp1
in LEED IEQ Space Matrix - Frequently Asked Questions
86 31 Wolfgang Werner
Thu, Apr 18, 2013
RE: Off-site sorting and land clearing debris
in CS 2009 MRc2: Construction Waste Management
86 62 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 28, 2010
RE: EP Documentation
in NC v2.2 MRc4: Recycled Content
86 148 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Aug 31, 2012
RE: fire dampers
in NC v2.2 MRc4: Recycled Content
86 148 Susan Walter
Sr Project Architect
Wilmot/Sanz
Tue, Jul 17, 2012
Big SOD grass area with no irrigation, can we get 2 points WE1.2
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
86 81 yongmei gao
Mon, Feb 14, 2011
RE: Demolition of topping slab & SF of interior structural walls
in NC v2.2 MRc1.1–1.2: Building Reuse
86 24 Michael Miller
Project Architect
Wed, Nov 24, 2010
RE: EU GUT certification be valid instead of Green Label Plus?
in NC v2.2 EQc4.3: Low-Emitting Materials—Carpet Systems
86 29 Reinhard Oppl
Director VOC Testing
Eurofins Product Testing A/S
Wed, Dec 29, 2010
RE: 100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER
in EBOM 2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
86 51 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jul 27, 2010
RE: Project information forms
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
85 577 Kristina Bach
Sustainability Specialist
Tue, Jan 15, 2013
Title Comments Most Recent Post
Removal of Office/Open Office Trash Cans
in EBOM 2009 MRp2: Solid Waste Management Policy
23 Heather Riley
LEED Project Manager
SAS Institute Inc.
Fri, Oct 11, 2013
Universal Design
in Pilot Credit 34: Design for Adaptability
10 USGBC IP Account
U.S. Green Building Council
Fri, Oct 4, 2013
Challenges logging into forum
in Pilot Credit 24: Acoustics
28 deborah lucking
associate
fentress architects
Wed, Sep 25, 2013
Industry Scare Tactics
in Does LEED v4 Ban PVC?
11 Andrew Ellsworth
Ellsworth Building Portfolio Services
Mon, Sep 23, 2013
Modeling a Commercial Kitchen
in NC 2009 EAp2: Minimum Energy Performance
2,378 September Silvers
Senior Mechanical Engineer
Mussett, Nicholas & Associates
Mon, Sep 23, 2013
Well Said - Not All PVCs are Equal - Good Decisions are Required
in Does LEED v4 Ban PVC?
11 Louise Schlatter
Architect
SSOE Group
Mon, Sep 23, 2013
LEEDuser template updated
in EBOM 2009 SSc2: Building Exterior and Hardscape Management Plan
102 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Sep 17, 2013
Remediating to "residential (unrestricted) use"
in Healthcare-v2009: Environmental site assessment
6 Kathy Wislocky
Project Manager
Isgenuity LLC
Thu, Sep 12, 2013
Core performance path
in NC 2009 EAc1: Optimize Energy Performance
1,086 Jatuwat Varodompun
Dr
Green Building Soultion
Sat, Sep 7, 2013
LEED Scorecard Forms
in Scorecard
6 Clara Simon
Sustainability Manager
University of Washington - Capital Projects Office
Fri, Sep 6, 2013
BREEAM and LEED
in BREEAM Equivalency for LEED Projects
1 Emily Rhee
Fri, Sep 6, 2013
Australian equivalent of fuel-efficient vehicles
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
348 Mary Haw
Senior ESD Consultant
Cundall
Wed, Sep 4, 2013
Minimum IAQ Requirement: Ashrae 62.1 vs. Ashrae 170
in CS-2009 IEQp1: Minimum IAQ Performance
129 Daniel Joseph
GLHOMES
Thu, Aug 29, 2013
Pressure and flow rates
in NC 2009 WEp1: Water Use Reduction—20% Reduction
598 MM K
Thu, Aug 29, 2013
Flush out in tropical climate region (Climate Zone 1)
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
247 Adi Negara, LEED AP BD+C
Green Building Facilitator
PT. Indonesia Environment Consultant
Thu, Aug 29, 2013
EAp2 Sample L4 Narrative
in CS 2009 EAp2: Minimum Energy Performance
835 Thomas Newbold
Wed, Aug 21, 2013
Plenum Zones
in NC 2009 EAc1: Optimize Energy Performance
1,086 Rosana Correa
Director
Casa do Futuro
Mon, Aug 19, 2013
What requirements apply?
in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases
9 Patrick Salmon
EIT, LEED AP BD+C
Highland Associates
Thu, Aug 15, 2013
What was your LEED deliverable after the site assessment?
in Healthcare-v2009: Environmental site assessment
6 Jill DeMarotta
Interior Designer
Gresham Smith and Partners
Tue, Aug 13, 2013
Streamlined Signatures
in Required Signatories in LEED Online Forms
66 Kathryn West
LEED AP BD+C, O+M, Green Globes Professional, Guiding Principles Compliance Professional
Energy Ace
Mon, Aug 12, 2013

Copyright 2014 – BuildingGreen, Inc.