Increased ventilation with a constant volume system?
in NC v2.2 EQc2: Increased Ventilation
18 mike diess
Engineer
LNI, inc.
Fri, Mar 7, 2014
MRc3 Materials Reuse
in NC v2.2 MRc3: Materials Reuse
37 Stephen Rao
Fri, Mar 7, 2014
leather - rapidly renewable?!
in CI 2009 MRc6: Rapidly Renewable Materials
15 Victoria Lockhart
Arup Associates
Fri, Mar 7, 2014
RE: CAPP Plan
in NC-v4: Construction activity pollution prevention
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
RE: LEED 2009 for Retail: Commercial Interiors EAc1.5
in Retail–CI-v2009: Optimize energy performance - building envelope
4 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 7, 2014
Additional Interior Lighting power
in Retail–CI-v2009: Minimum energy performance
8 Luana Bertoletti
Sustentech
Fri, Mar 7, 2014
lighting controls
in Retail–CI-v2009: Optimize energy performance - lighting controls
4 ARGIA ARROYO BUGANZA
architect
Fri, Mar 7, 2014
RE: What you are saying is indeed
in Schools 2009 SSc9: Site Master Plan
21 Shannon Gray
Consultant
YRG sustainability
Fri, Mar 7, 2014
FTE calculations for Water Use Reduction and Bikes /Showers
in Schools 2009 WEc3: Water Use Reduction
32 Joanna Yaghooti
Director of Sustainable Design
PageSoutherlandPage
Fri, Mar 7, 2014
Vestibules in 90.1
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Fri, Mar 7, 2014
Addition Project Boundary remote from existing parking
in Schools-NC-v4: Must use reasonable LEED boundaries
2 Larry Turbes
Architect
TKDA
Thu, Mar 6, 2014
v4 Demand Response - No on-site Elec Generation
in NC-v4: Demand response
2 Mark Gelfo
DIrector of Sustainability
TLC Engineering for Archiecture
Thu, Mar 6, 2014
RE: Define "Weatherproofing System"
in Schools IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
23 Josh Jacobs
Technical Information & Public Affairs Manager
UL Environment
Thu, Mar 6, 2014
Whole System Integration Process Guide not referenced
in Pilot Credit 60: Integrative Process
4 Heather DeGrella
Sustainability Coordinator
Opsis Architecture
Thu, Mar 6, 2014
Lighting Power Density at Data Halls
in Data Centers-NC-v4: Optimize energy performance
3 Anthea Ng
Thu, Mar 6, 2014
Plumbing Commissioning Scope Of Work
in NC-v4: Fundamental commissioning and verification
2 Daniel Forino
Sustainability Engineering
Horizon Engineering Associates
Wed, Mar 5, 2014
RE: farmland
in CS 2009 SSc1: Site Selection
11 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 5, 2014
No consistency yet
in Non-U.S. Regional Priority Credits Added to LEED
26 Steve Khouw
Principal
DNA GreenDesign
Mon, Mar 3, 2014
Historic Preservation
in NC-2009 MRc1.2: Building Reuse—Maintain Existing Interior Nonstructural Elements
25 Richard Reed
Sat, Mar 1, 2014
Core Performance Guide
in ND-v2009: Minimum building energy efficiency
6 Susan Di Giulio
Project Manager
Zinner Consultants
Fri, Feb 28, 2014
Title Comments Most Recent Post Location
RE: EQc6.2 - VAV not allowed for air ctrl multi-occupant space
in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
67 Lauren Sparandara
Sustainability Manager
Google
Tue, Jan 14, 2014
RE: SS-5 / Basic services
in Schools 2009 SSc2: Development Density and Community Connectivity
14 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Jan 14, 2014
RE: Floodplain Documentation
in ND-v2009: Floodplain avoidance
13 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Jan 13, 2014
Private versus public lavs
in Healthcare-v2009: Water use reduction
11 Kim Shinn
Principal
TLC Engineering for Architecture
Thu, Jan 9, 2014
Percantage Make-Up
in Healthcare-v2009: Sustainably sourced materials and products
60 Bryan Waters
Architectural Intern
WHR Architects
Thu, Jan 9, 2014
SS5.1 and SS5.2 are the same under some circumstances
in NC v2.2 SSc5.2: Site Development—Maximize Open Space
33 Valentin Grimaud
Thermal Engineer
TERAO Green Building Engineering
Thu, Jan 9, 2014
RE: Aluminum
in NC v2.2 MRc5: Regional Materials
117 Nadav Malin
USGBC LEED Faculty, President
BuildingGreen, Inc.
Thu, Jan 9, 2014
SLL c4
in ND-v2009: Bicycle network and storage
9 Nader NAKIB
Thu, Jan 9, 2014
CO2 Monitors in Non-Densly Occupied Spaces
in Schools 2009 IEQc1: Outdoor Air Delivery Monitoring
11 Erik Bergstrom
Green Building Associate
Wed, Jan 8, 2014
how to compute the runoff rate?
in NC v2.2 SSc6.1: Stormwater Design—Quantity Control
41 Mary Ann Santos
Tue, Jan 7, 2014
Use of LEED Retail Draft credit SS 4
in CS 2009 SSc4.1: Alternative Transportation—Public Transportation Access
21 V Miller
WSP
Thu, Jan 2, 2014
Enhanced Commissioning
in CS-2009 EAc3: Enhanced Commissioning
32 James Thornton
Project Manager, Commissioning Group
ccrd
Thu, Jan 2, 2014
RE: Private Shuttle Service
in NC v2.2 SSc4.1: Alternative Transportation—Public Transportation Access
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Dec 24, 2013
Possible Points
in Retail–CI-v2009: Green power
2 Felipe Duran
Mon, Dec 23, 2013
Stone counter adhesive/filler - problem with VOCs
in Homes-v2008: Environmentally preferable products
2 Melanie Loftus
Green Building Consultant
Healthy Building Science
Mon, Dec 23, 2013
Recycling
in CI 2009 MRp1: Storage and Collection of Recyclables
57 Peter Doo
President
Doo Consulting, LLC
Mon, Dec 23, 2013
Does blue wrap recycling qualify for innovation credit?
in Healthcare-v2009: Storage and collection of recyclables
10 Thomas C. Levi
Levi + Wong Design Associates
Mon, Dec 23, 2013
IEQ 2.3
in CS 2009 RPc1: Regional Priority
16 Robyn Williams Heeks
Tise-Kiester Architects
Fri, Dec 20, 2013
controller factor
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
81 ROBIN KINERK
Owner
Kinerk Strategic Marketing
Fri, Dec 20, 2013
where is the Low-Emitting Material Limits document?
in Schools IEQc4.2: Low-Emitting Materials—Paints and Coatings
78 Alison Y Rivenburgh
Fri, Dec 20, 2013
Title Comments Most Recent Post Location
USGBC customer service
in project owner's name changed
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 20, 2011
LEED certification for zoo
in New Exhibit Problem
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, May 20, 2011
phased construction and LEED certification
in Impact of project construction phasing on LEED submittal?
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, May 19, 2011
keeping LEED records
in Keeping and MAintaining records after LEED Certification
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Thu, May 19, 2011
Bed Formatting
in Incongruous DES District Steam Policy
2 Jason Chenard, PE
Sr. Mechanical Engineer
Oak Point Associates
Sat, Jul 30, 2011
LEED EBOM
in LEED EB Presentation
1 Emily Catacchio
Sustainability Specialist
Wight and Company
Thu, May 12, 2011
Underground parking under adjacent building
in Underground parking under adjacent building
1 Michelle Halle Stern
Principal
The Green Facilitator
Fri, Apr 29, 2011
Re: Project Summary
in Project Summary - mandatory or just suggested
4 David Posada
Sustainability Manager, SS TAG member
GBD Architects
Thu, Apr 28, 2011
LEED Online form improvements
in Beta Credit Versions
7 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Apr 26, 2011
campus forum
in Phased Construction and Early Release Packages
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
performance period forum
in Increased occupancy during performance period
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
performance period forum
in Question about performance period and submitting the documentation
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
fuel cells and LEED
in Fuel Cell question LEED points
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Apr 22, 2011
Indoor Environment courses - by Scott Kriner
Thu, Apr 21, 2011
Any one, please comment on
in Can we submit a new credit at Clarification stage of Construction Review?
5 bala srini
Senior Project Manager
Sustainability by Design
Thu, Apr 21, 2011
upgrading to LEED-EBOM 2009
in Change the version of LEED - EB - O & M (V.2008 to v.2009)
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
LEED documentation samples
in LEED Calculation examples
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
LEED for Healthcare in Second Public Comment Period
in LEED for Healthcare in Second Public Comment Period
3 Mike Barker
Principal : Energy / Electrical Engineer
BuildingPhysics South Africa
Fri, Apr 15, 2011
LEED ND AND EBOM - by Gurpreet Misra
Mon, Apr 4, 2011
Review of Advanced Energy Modeling for LEED Technical Manual - by Shillpa Singh
Tue, Apr 26, 2011
Title Comments Most Recent Post Location
LEED Interpretation #10102 Letter of Commitment from Owner
in LEED Minimum Program Requirements
442 K KRAFT
Wed, Nov 20, 2013
Construction Waste Management Signs
in NC 2009 MRc2: Construction Waste Management
334 Todd Hager
THe Consulting Grooup
Sun, Nov 17, 2013
Eligibility for bicycle network
in Pilot Credit 30: Alternative Transportation
9 Chris Wittig
Fri, Nov 15, 2013
mercury in specialty lamps (animal care)
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
143 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Wed, Nov 13, 2013
Building Envelope Commissioning
in Healthcare-v2009: Enhanced commissioning
4 Kerrie Racicot
Wed, Nov 13, 2013
SS PC45 - French feedback
in Pilot Credit 45: Site Assessment
15 Loïc ANGOT
ALTO Ingéniérie
Tue, Nov 12, 2013
How to claim savings for Equipment Power Density in LEED project
in Pilot Credit 3: Medical and Process Equipment Efficiency
24 J I
Thu, Nov 7, 2013
PIf3 forum
in PI Form 3 - Occupant and Usage Data
78 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
PIf3 forum
in Occupant and Usage Data
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
rating system selection forum
in Military Barracks considered LEED for Homes or LEED NC?
5 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
rating system selection forum
in Minor Renovation of an Existing LEED Certified Building
5 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
multiple buildings forum
in Multiple Buildings - One Registration
5 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Nov 5, 2013
Check my math
in EBOM 2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
261 American University
Sustainability
American University
Mon, Nov 4, 2013
fitness shower
in NC 2009 WEp1: Water Use Reduction—20% Reduction
598 Noriko Yasuhara
CSR Design & Landscape Co., Ltd.
Mon, Nov 4, 2013
see MPR-specific forums
in LEED Minimum Program Requirements
442 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Sun, Nov 3, 2013
MRc69 easily achieved with a comprehensive comingled service
in NC-2009: Construction and demolition waste management
9 Vince Briones
Sustainable Design Manager
Atkins
Sat, Nov 2, 2013
Pilot credit 10 vs. WEc2:Innovative Wastewater Technologies
in Pilot Credit 10: Sustainable Wastewater Management
54 Jiri Dobias
Fri, Nov 1, 2013
VRP Compliance Calculator Error
in Healthcare-v2009: Minimum indoor air quality performance
9 Kevin Chow
Mechanical Engineer
Thu, Oct 24, 2013
"Trying is no longer enough" - When did this change occur?
in Using the LEED Pilot Credit Library
28 Adam West
Project Manager
Southface Energy Institute
Mon, Oct 14, 2013
Removal of Office/Open Office Trash Cans
in EBOM 2009 MRp2: Solid Waste Management Policy
23 Heather Riley
LEED Project Manager
SAS Institute Inc.
Fri, Oct 11, 2013
Title Comments Post date Most Recent Postsort icon Location
Potential ID Credit
in NC 2009 IDc1: Innovation in Design
530 Ashley Bertling
Wed, Oct 1, 2014
2014-10-01 11:06 United States
LEED Design Review and Final Certification Proceedures
in Start a New LEED Discussion Topic
131 Susannah Goddard
Wed, Oct 1, 2014
2014-10-01 08:31 United Kingdom
Credit 3.2 option 2
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
251 Michael Schrantz
Environmental Analytics
Tue, Sep 30, 2014
2014-09-30 13:57 United States
Glazing specifications for existing building
in CS 2009 EAp2: Minimum Energy Performance
842 João Costa
Engineer
ETRIA
Tue, Sep 30, 2014
2014-09-30 11:01 Brazil
LED lamps
in EBOM-v4: Purchasing - lamps
2 Karim Farah
Sustainability Manager / USGBC Faculty
Dar Al-Handasah
Tue, Sep 30, 2014
2014-09-30 09:18 Saudi Arabia
Modeling Heat Reclaim in EAp2 v2009
in NC 2009 EAp2: Minimum Energy Performance
2,390 Mario S.
Tue, Sep 30, 2014
2014-09-30 02:17 Lebanon
Fire Department Practice Burn
in NC 2009 MRc2: Construction Waste Management
334 Brian Leet
Freeman French Freeman
Mon, Sep 29, 2014
2014-09-29 16:43 United States
Site lighting calculations
in CS 2009 EAp2: Minimum Energy Performance
842 charles bell
principal
theGreenTeam, Inc.
Mon, Sep 29, 2014
2014-09-29 09:33 United States
FTEs and Total Daily Uses for Showers
in CI 2009 WEp1: Water Use Reduction—20% Reduction
214 Rodrigo Gomez Junco
LEED AP BD+C
SINERGI Integrated Building Sciences, LLC
Fri, Sep 26, 2014
2014-09-26 13:07 Mexico
Help, my process energy is greater than 25%
in Completing the LEED Online EAp2 Form – Option 1: Whole Building Energy Simulation
47 Amy Harmon
Fri, Sep 26, 2014
2014-09-26 09:23 United States
Typical TSS measures from Sedum roofing
in NC 2009 SSc6.2: Stormwater Design—Quality Control
164 Andreas Soederberg
Fri, Sep 26, 2014
2014-09-26 04:03 Sweden
WEp1 and c1: Indoor Water Use Reduction
in CI-v4: Indoor water use reduction
2 BEE Bisagni Environmental Enterprise
Thu, Sep 25, 2014
2014-09-25 23:45 China
SSc4.3 Option 2: How long must charge stations be installed ?
in NC 2009 SSc4.3: Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
351 Kimberlyn Caoagas
Thu, Sep 25, 2014
2014-09-25 15:16 United States
FTE Consistency Pertaining to IEQp1
in NC-2009 IEQp1: Minimum IAQ Performance
782 Spencer Eldredge
Associate Engineer
Weston Solutions, Inc.
Thu, Sep 25, 2014
2014-09-25 14:49 United States
Mixed feelings about numbering
in Poll – Should LEED v4 Credits Have Numbers?
3 Andres Schwarz
Principal
NRG-AR
Thu, Sep 25, 2014
2014-09-25 14:36 Argentina
Need for consistent numbering system across all rating systems
in Poll – Should LEED v4 Credits Have Numbers?
3 Lyle Axelarris
Civil/Structural Engineer, LEED AP BD+C, O+M
Design Alaska
Thu, Sep 25, 2014
2014-09-25 14:21 United States
Line of Site into Multi-Story Dorm & Ceiling Mounted Glazing
in NC 2009 SSc8: Light Pollution Reduction
547 Sara Zoumbaris
Thu, Sep 25, 2014
2014-09-25 13:40 United States
Required Manufacturer Documentation for Option 3
in NC-v4: Building product disclosure and optimization - material ingredients
7 Randy Van Straaten
Thu, Sep 25, 2014
2014-09-25 12:41 United States
LPD in future spaces for Energy Model
in LEED Minimum Program Requirements
442 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Thu, Sep 25, 2014
2014-09-25 11:41 United States
Short-term bicycle
in NC-v4: Bicycle facilities
6 Flavia Marques
Ramboll
Thu, Sep 25, 2014
2014-09-25 10:39 Qatar