RE: Building reuse for parking deck?
in Healthcare-v2009: Building reuse - maintain existing walls, floors and roof
3 Susan Walter
Sr Project Architect
Wilmot/Sanz
Thu, Dec 19, 2013
RE: Previously developed?
in ND-v2009: Preferred locations
11 Michael DeVuono
Senior Staff Designer
T&M Associates
Thu, Dec 19, 2013
RE: Can A project Team Perform that credit
in Schools SSp2: Environmental Site Assessment
52 Larry Sims
Principal
Studio4, LLC
Tue, Dec 17, 2013
RE: LTc1. possible 18 points
in CI-v4: LEED for neighborhood development location
3 FRAGISKOS LEVANTIS
LEED AP BD+C
SUSTAIN O.E.
Fri, Dec 13, 2013
I agree Tristan!
in Dear USGBC, Give Us Transparency on LEED Energy Data
4 Scott Bowman
Owner - Building Sage
Integrated Design + Energy Advisors, LLC
Fri, Dec 13, 2013
RE: Utility tariff - an accepted DR strategy?
in Data Centers-NC-v4: Demand response
2 Marcus Sheffer
LEED Fellow
7group
Fri, Dec 13, 2013
RE: Do Requirements Apply?
in Retail–NC-v2009: Low-emitting materials
3 Carly Ruggieri
Senior Sustainability Consultant
Steven Winter Associates, Inc.
Fri, Dec 6, 2013
RE: LEED Data Set - Energy Use Way Too High!
in Energy Star Score of 85 for 450 LEED Buildings in Biggest Data Release Yet
2 Michele Helou
Principal
Sage Design & Consulting
Thu, Dec 5, 2013
RE: Qualifying Third party certification examples?
in Pilot Credit 52: Environmentally Preferable Non-Structural Products and Materials—Prescriptive Attributes
8 Christine Robbins-Elrod
Studio Director
5G Studio Collaborative,llc.
Tue, Dec 3, 2013
RE: my experience
in LEED core + shell vs. new construction
8 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Tue, Dec 3, 2013
RE: The role of concensus in green rating systems
in Chemical Industry Touts Anti-LEED Language in Appropriations Bill
19 Paula Melton
Managing Editor
BuildingGreen, Inc.
Tue, Dec 3, 2013
RE: Development Density and Community Connectivity
in NC v2.2 SSc2: Development Density and Community Connectivity
28 Gulcin Tanil
Tue, Dec 3, 2013
RE: LEED for Schools 2007
in NC v2.2 EAc6: Green Power
62 Hernando Miranda
Owner
Soltierra LLC
Mon, Dec 2, 2013
RE: V4 implementation and '09 phase out
in Sixth Comment Period for LEED v4 Won't Delay Member Ballot
35 Michelle Reott
LEED AP BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC
Sun, Dec 1, 2013
RE: ASHRAE 90.1-2010 VRF Requirements
in NC-v4: Minimum energy performance
2 Marcus Sheffer
LEED Fellow
7group
Wed, Nov 27, 2013
RE: Registration for Subsequent Stages
in PIf2: Project Timeline
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Nov 26, 2013
RE: GHG Emissions in Pilot Credit EAC27
in Pilot Credit 27: Reconcile Projected and Actual Energy Performance
17 Marcus Sheffer
LEED Fellow
7group
Tue, Nov 26, 2013
RE: Bicycle network
in Pilot Credit 13: Bicycle Network, Storage, and Changing Rooms
35 Ann Lubbers
Tue, Nov 26, 2013
RE: Cant find 2.1(b) and c()
in Homes-v2008: Durability management process
4 Batya Metalitz
Manager, LEED Technical Development
USGBC
Mon, Nov 25, 2013
RE: Exterior Lighting
in NC v2.2 EAc5: Measurement and Verification
25 Marcus Sheffer
LEED Fellow
7group
Mon, Nov 25, 2013
Title Comments Most Recent Post
RE: Construction EQ Management Plan
in Healthcare-v2009: Construction IAQ management plan - during construction
7 Bruce Maine
Sustainable Design Specifier
Retired
Tue, Sep 10, 2013
SSc6 - Site Improvement Plan
in EBOM-v4: Site improvement plan
1 Levi Jimenez
Project Manager
BuildingWise
Fri, Sep 6, 2013
RE: Simpson Diversity Index score
in ND-v2009: Mixed-income diverse communities
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Sep 4, 2013
RE: Project Threshholds
in Pilot Credit 15: Parking Reduction
8 Devani PERERA
Green Building Consultant
ELAN
Mon, Sep 2, 2013
RE: outpatient exam rooms and consult rooms
in Healthcare-v2009: Controllability of systems - lighting
7 Kathy Wislocky
Project Manager
Isgenuity LLC
Thu, Aug 29, 2013
RE: Compliance documents upload
in ND-v2009: Recycled content in infrastructure
13 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Thu, Aug 29, 2013
RE: SEED evaluator tool
in ND-v2009: Community outreach and involvement
2 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Aug 26, 2013
RE: All Interior finishes qualify based on IEQ 4.1-4.4, still pursue
in Pilot Credit 21: Low-Emitting Interiors
45 Michael Lingerfelt
Fri, Aug 23, 2013
RE: Housing Densities and FAR
in ND-v2009: Compact development
3 Colin Day
Sustainable Building Associate, LEED GA
The Institute for the Built Environment
Wed, Aug 21, 2013
RE: Counting Entrances for Transit Served Locations
in ND-v2009: Smart location
7 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Wed, Aug 21, 2013
RE: Homers energy efficiency in Central America
in ND-v2009: Building energy efficiency
6 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Aug 19, 2013
RE: Metering faucet for Ktchen sink
in Retail–NC-v2009: Water use reduction
5 Richard Manning
Principal
Green Building Services
Tue, Aug 13, 2013
RE: Asbestos abatement for existing building renovation
in CS 2009 SSc3: Brownfield Redevelopment
8 Larry Sims
Principal
Studio4, LLC
Wed, Aug 7, 2013
RE: Proximity to farmers' market
in ND-v2009: Local food production
8 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Tue, Sep 17, 2013
RE: Do bio-based inhibited glycols contribute to LEED certification?
in NC v2.2 MRc6: Rapidly Renewable Materials
25 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Aug 5, 2013
RE: Peak Discharge Rate
in Schools 2009 SSc6.1: Stormwater Design—Quantity Control
6 Nicole Ferrini
via T&M Associates
Fri, Aug 2, 2013
RE: Credit Requirements
in Pilot Credit 61: Material Disclosure and Assessment
8 Melissa Vernon
Director of Sustainable Strategy
Interface
Wed, Jul 31, 2013
RE: LEED ND - outside the US
in ND-v2009: Building water efficiency
5 Eliot Allen
AICP, LEED AP-ND, CNU-A
Principal, Criterion Planners LEED Faculty, LP TAG
Mon, Jul 29, 2013
HVAC baseline model
in Retail–CI-v2009: Optimize energy performance - HVAC
1 Francesco Passerini
engineer
leedme.it
Wed, Jul 24, 2013
RE: Indoor AHUs and MERV 13 filters
in EBOM 2009 IEQc1.4: IAQ Best Management Practices—Reduce Particulates in Air Distribution
33 Mech Engineer
LEED AP BD+C
Mon, Jul 22, 2013
Title Comments Most Recent Post
Standard 189 Integrated into New Green Construction Code - by Tristan Roberts
Tue, Mar 16, 2010
RE: You answered your own question
in CI 2009 ID C2.0-LEED Accredited Professional
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 15, 2010
Landscape Water irrigation Calculation - by Surenthira Stephe...
Sun, Mar 14, 2010
RE: LEED Online project registration number
in project registration number
2 Rachael McClain
Fri, Mar 12, 2010
RE: Need 1 FTE to meet Minimum Program Requirements (MPRs)
in FTE for Parking Garage project
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Mar 12, 2010
RE: Temporary wood structures and MRc7: Certified Wood
in Wood products that are only used temporarily!
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 10, 2010
RE: CI in a certified CS building
in CI in a certified CS building
2 Leticia SooHoo
Green Building Consultant
soohoocity
Wed, Mar 10, 2010
LEED-NC v2.2 requirements compared to LEED v2009 - by Tristan Roberts
Wed, Mar 10, 2010
Mister Tristan Talks LEED – Episode #1 - by Tristan Roberts
Mon, Mar 8, 2010
RE: EBOM Templates
in EBOM-2009 Sample Template
3 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 8, 2010
Norwegian Standard
in Use of Standard ASHRAE vs NS - Norwegian Standard
1 Christopher Schaffner
Principal & Founder
The Green Engineer, LLP
Fri, Mar 5, 2010
The Best UNLOCKED LEED 2009 credit checklists - by Tristan Roberts
Fri, Feb 28, 2014
RE: No hard rules
in Transient and Peak
2 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Wed, Mar 3, 2010
CSI section?
in Playground equipment
1 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Tue, Mar 2, 2010
RE: Divisions 31 and 32 should be included
in CSI specification sections 3–10 only?
6 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Mon, Mar 1, 2010
Low emtting materials - measurement - by André Knutsson
Thu, Feb 18, 2010
RE: The term "Registered" in the US
in Registered Civil Engineer
4 Jean Marais
b.i.g. Bechtold DesignBuilder Expert
Wed, Feb 17, 2010
Multiple Buildings in LEED-EB: O&M
in Multiple Buildings in LEED-EB: O&M
3 Chris Nixon
Manager, Sustainable Solutions
BRSC
Tue, Feb 16, 2010
You Choose the LEED Project Boundary
in One site, Multiple Buildings
2 Sherry Bonelli
LEED Project Manager/Consultant
BudSprout LLC -- SucceedAtLEED.com
Mon, Feb 15, 2010
treat terraces like roof
in How are roof terraces defined under LEED SSc7.2 for SRI calculations?
2 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Wed, Mar 24, 2010
Title Votes Comments Most Recent Post
RE: CxA from owner
in CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
78 64 Omer Moltay
Mon, Sep 20, 2010
RE: Reused furniture from old office
in CI 2009 MRc5: Regional Materials
78 91 Lauren Sparandara
Sustainability Manager
Google
Tue, Aug 24, 2010
RE: Metering
in EBOM 2009 WEc1: Water Performance Measurement
78 76 Paul C
Tue, Sep 14, 2010
Sourcing Roof Shingles with SRI 70 or more
in NC v2.2 SSc7.2: Heat Island Effect—Roof
78 72 Pal Ahuja
President
Millennium Engineering Inc.
Sun, Sep 4, 2011
Domestically Manufactured Rapidly Renewables
in NC 2009 MRc6: Rapidly Renewable Materials
78 48 Elliot Powers
LEED AP BD+C
Fri, May 7, 2010
RE: E1 E0 wood
in CI 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
78 45 Tristan Roberts
LEED AP BD+C, Editorial Director – LEEDuser
BuildingGreen, Inc.
Fri, Jul 23, 2010
RE: Monthly Commingled Diversion Rate Regulatory Requirements
in NC v2.2 MRc2: Construction Waste Management
78 110 Michelle Rosenberger
Partner
ArchEcology, LLC
Wed, May 11, 2011
RE: summary for mechanically ventilated spaces
in CS 2009 IEQc1: Outdoor Air Delivery Monitoring
78 50 Michael E. Edmonds-Bauer
Edmonds International
Tue, Dec 11, 2012
Changing project name
in LEED IEQ Space Matrix - Frequently Asked Questions
78 31 Shivani Langer
Architect
SHW Group
Thu, Apr 18, 2013
RE: GFA Defination
in LEED Minimum Program Requirements
78 440 Donald R. Able
Director of Sustainability
BSA LifeStructures
Wed, Feb 15, 2012
RE: Including Gyms in Regularly Occupied Spaces
in Schools 2009 IEQc8.2: Daylight and Views—Views
78 63 Bill Swanson
PE, LEED AP
Integrated Architecture
Wed, Aug 18, 2010
RE: EQ Pre. 2 in mixed use building
in NC v2.2 EQp2: Environmental Tobacco Smoke (ETS) Control
78 54 Ben Stanley
Sustainability Manager
YRG sustainability
Wed, Aug 4, 2010
RE: Precast concrete for LEED
in NC v2.2 MRc4: Recycled Content
78 148 Frances Yang
Mon, Dec 5, 2011
Baseline using existing landscape?
in NC v2.2 WEc1.1–1.2: Water Efficient Landscaping
78 81 Kath Williams
LEED Fellow 2011, Principal
Kath Williams + Associates
Tue, Mar 8, 2011
RE: Commissioning Authority was hired in 65% of Construction Docs.
in NC v2.2 EAc3: Enhanced Commissioning
78 51 Mara Baum
Healthcare Sustainable Design Leader
HOK
Mon, May 10, 2010
RE: Separate design and construction commissioning agents?
in NC v2.2 EAc3: Enhanced Commissioning
78 51 Chris Ladner
Partner
Viridian
Wed, Apr 6, 2011
LEED Interpretations
in USGBC's New LEED Interpretations Similar to Old Precedent-Setting CIRs
78 27 Barry Giles
Founder & CEO, USGBC LEED Faculty, LEED AP O+M
BuildingWise LLC
Mon, Feb 28, 2011
RE: Code required site lighting
in LEED 2012 - 4th Public Comment and Ballot Forum
78 191 Bill Swanson
PE, LEED AP
Integrated Architecture
Tue, Jun 12, 2012
RE: PFc Occupant Experience Survey
in Comment on the New LEED Rating System Draft to be Released in 2012
78 97 David Smith
Fri, Jan 14, 2011
RE: PFc Occupant Experience Survey
in Comment on the New LEED Rating System Draft to be Released in 2012
78 97 Aaron Desatnik
Mon, Jan 31, 2011
Title Comments Most Recent Post
Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
54 Alicia Silva
CEO
Revitaliza consultores
Tue, Apr 30, 2013
Cistern doesn't fulfull need, but there is no-potable backup
in NC 2009 WEc1: Water Efficient Landscaping
339 Sarah Picking
Tue, Apr 30, 2013
Questions
in Pilot Credit 10: Sustainable Wastewater Management
54 Lolita Wu
Sun, Apr 28, 2013
Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
54 Alicia Silva
CEO
Revitaliza consultores
Fri, Apr 26, 2013
Average Pressure Differential Calculation - Underground Parking
in CS 2009 IEQc5: Indoor Chemical and Pollutant Source Control
85 Nathan Lee
Project Engineer
SGS Korea
Fri, Apr 26, 2013
Greywater recirculated
in NC 2009 WEp1: Water Use Reduction—20% Reduction
579 MM K
Thu, Apr 25, 2013
invidually buildings ceritifcation vs multiple buildings/ campus
in New LEED Guidance for Campuses and Multiple Buildings
490 Muhammad Faisal Azizullah Jaffar
Sustainability Consultant
Ramboll
Wed, Apr 24, 2013
WEc2 vs. Pilot Credit 10
in Pilot Credit 10: Sustainable Wastewater Management
54 Jiri Dobias
Tue, Apr 23, 2013
EAp2/EAc1 - Case 2 Option 2b
in EBOM 2009 EAp2: Minimum Energy Efficiency Performance
451 Peter Locke
Sustainability Consulting Director
McKinstry
Fri, Apr 19, 2013
Interior vegetation
in NC 2009 WEc1: Water Efficient Landscaping
339 Albert Sagrera
Architect
Societat Organica
Fri, Apr 19, 2013
suspiciously high savings in auxillary power
in CS 2009 EAc1: Optimize Energy Performance
252 shashank jain
Environmental Analyst
BDSP Partnership
Fri, Apr 19, 2013
Cafeteria/Training Room: Regurlarly Occupied Area?
in PIf3: Occupant and Usage Data
180 Alejandro Rivera Rivera
Sustainability Coordinator
Studio Domus
Thu, Apr 18, 2013
Spaces smaller than 3000ft2
in Vestibules in 90.1-2007 and LEED 3.0 Projects
12 Emmanuel Pauwels
Owner
Green Living Projects s.l.
Tue, Apr 16, 2013
Providing verification that there will be side stream filtration
in Pilot Credit 17: Cooling Tower Water Use
26 Sara Greenwood
Green Building Consultant
Cadmus Group
Mon, Apr 15, 2013
Current Regs?
in Pilot Credit 66: Community Contaminant Prevention—Airborne Releases
9 Robert Millspaugh
Fri, Apr 12, 2013
New USGBC searchable database..
in Key LEED Interpretations
4 Lewis Hewton
Cundall
Thu, Apr 11, 2013
Test
in NC v2.2 EQc6.2: Controllability of Systems—Thermal Comfort
67 Catalina Caballero
Sustainability Coordinator
JALRW Eng. Group Inc.
Thu, Apr 11, 2013
Evapotranspiration rate units?
in NC 2009 WEc1: Water Efficient Landscaping
339 E H
Sustainability Architect
Thu, Apr 11, 2013
Flush-out Spreadsheet?
in NC v2.2 EQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
141 James Houston
Thu, Apr 11, 2013
"Keep Calm and Do Your Homework"
in GBCI Invites Direct Inquiries—But Do Your Homework First
17 deborah lucking
associate
fentress architects
Wed, Apr 10, 2013