LEEDuser Forum

There are discussions happening on LEED credit and strategy pages across this site, right in the thick of our content. If you don't find your topic, you can start your own discussion. Start a new discussion!

Title Comments Most Recent Post Location
Process Water Reduction
in Schools 2009 WEc2: Innovative Wastewater Technologies
4 Charles Shinneman
Director of Optimization
Capital Engineering Consultants, Inc.
Tue, Jun 14, 2016
United States
RE: parking demand vs 1000sf or vs employees
in More Money, Less Guesswork: ITE Parking Generation Study and SSc4.4
37 Erin Holdenried
Sustainable Design Manager
AECOM
Mon, Jun 13, 2016
RE: Hospital beds
in Healthcare-v2009: Furniture and medical furnishings
39 Mara Baum
Healthcare Sustainable Design Leader, LEED Fellow
HOK
Mon, Jun 13, 2016
RE: LEED recertification process
in PIf5: Building System Control
7 VICTOR MORENO
TECHNICAL DIRECTOR
ISOLANA AHORRO ENERGÉTICO SL
Sat, Jun 11, 2016
Spain
Audio System
in Retail–CI-v2009: Optimize energy performance - equipment and appliances
1 Anna Cogo
Nativa S.r.l SB
Fri, Jun 10, 2016
RE: Credit Still Open?
in Pilot Credit 12: Reduced Automobile Dependence
50 Fred Dock
Director, Department of Transportation
City of Pasadena, CA
Thu, Jun 9, 2016
RE: Clarifying 20 different materials from 5 different manufacturers
in Schools-NC-v4: Building product disclosure and optimization - environmental product declarations
2 Paula Melton
Senior Editor
BuildingGreen, Inc.
Fri, Jan 27, 2017
RE: LEED V3 Vs V4
in EBOM 2009 EAc3.2: Performance Measurement—System Level Metering
54 David Hubka
Director - Operations
Transwestern Sustainability Services
Fri, Jun 3, 2016
RE: GBCI policy on deferring appeal
in Defer a Design Phase Appeal
2 Karen Elliott
LEED AP ID+C & BD+C
Ecoteric Ltd
Fri, Jun 3, 2016
RE: Heat pump water heater
in CS v4: Enhanced refrigerant management
4 Melissa Kelly
Sustainability Manager
YR&G
Tue, Feb 14, 2017
RE: Occupant's training manual
in Homes-v4: Education of homeowner, tenant, or building manager
3 Phil Vanderloo
President
Hiline Builders Inc.
Thu, Jun 2, 2016
Has Homes v2008 Midrise already been phased out?
in Homes-v2008: Integrated project planning
5 Brian Salazar
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
Wed, Jun 1, 2016
United States
RE: Initial fit-out vs alteration
in PIf2: Project Summary Details
8 Wolfgang Werner
Fri, May 27, 2016
RE: 2 buildings = 100% = 5 points?
in ND-v4: Certified green buildings
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, May 26, 2016
RE: SLLc6 in v2009 vs v4 - no slopes do/don't qualify?
in ND-v4: Steep slope protection
3 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, May 26, 2016
RE: Flat land
in ND Plan-v4: Steep slope protection
4 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, May 26, 2016
RE: Multistorey car park
in ND Plan-v4: Solar orientation
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Thu, May 26, 2016
testing by ISO 16000
in Retail–CI-v2009: Low-emitting materials - flooring systems
1 Anna Cogo
Nativa S.r.l SB
Thu, May 26, 2016
RE: Treated Waste Water Re-use for a Campus site
in NC 2009 WEc2: Innovative Wastewater Technologies
122 Ashwin Kumar
Sustainability Services Consultant
M+W Group
Wed, May 25, 2016
RE: Bus service in opposite directions
in Healthcare-v4: Access to quality transit
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Tue, May 24, 2016
Title Comments Most Recent Post Location
RE: Transportation Planning Handbook NCv4 LTc7
in Hospitality-NC-v4: Reduced parking footprint
2 Marilyn Specht
Sustainability Consultant
Integral Group
Mon, Apr 11, 2016
RE: How to earn AP with specialty?
in Healthcare-v4: LEED Accredited Professional
5 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Apr 10, 2016
RE: LEED Online Form
in Healthcare-v4: Indoor air quality assessment
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Apr 10, 2016
RE: ANY PRESENTATIONS DONE FOR NEW LEED FOR HOSPITALITY?
in Hospitality-NC-v4: Minimum energy performance
4 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Apr 10, 2016
RE: Data Center Energy Calculator Tool
in Data Centers-NC-v4: Optimize energy performance
6 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Apr 10, 2016
RE: Data Center location restrictions
in Data Centers-NC-v4: Surrounding density and diverse uses
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Sun, Apr 10, 2016
RE: Regional Priority credits worldwide
in NC-v4: Regional priority
8 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Apr 8, 2016
RE: Separating waste - reuse at household
in CI 2009 MRc2: Construction Waste Management
75 Michelle Reott
LEED AP® BD+C, ID+C, O+M, Managing Principal
Earthly Ideas LLC, a LEED® Proven Provider™
Thu, Apr 7, 2016
FTE - Healthcare buildings
in PIf3: Occupant and Usage Data
2 VICTOR MORENO
TECHNICAL DIRECTOR
ISOLANA AHORRO ENERGÉTICO SL
Wed, Apr 6, 2016
Spain
RE: Controls for Open Plan Work Stations
in CI 2009 IEQc6.2: Controllability of Systems—Thermal Comfort
35 Lauren Sparandara
Sustainability Manager
Google
Mon, Apr 4, 2016
RE: MOB - Recycling Calculations
in Healthcare-v2009: Storage and collection of recyclables
19 Susan Walter
Specifications Director
Populous
Thu, Mar 31, 2016
RE: Ice machines
in NC-v4: Water metering
4 Paul Swierc
Commissioning Engineer
YR&G
Tue, Mar 29, 2016
RE: View Preserving Automated Shades
in EBOM 2009 IEQc2.4: Daylight and Views
73 Melissa Kelly
Sustainability Manager
YR&G
Mon, Mar 28, 2016
Allocation of User Groups in Elementary Schools
in Schools-NC-v4: Indoor water use reduction
3 Steven Burke
Sustainability Manager
SMMA
Fri, Mar 25, 2016
RE: Exhaust for Hazardous Material storage
in Healthcare-v2009: Minimum indoor air quality performance
15 Gabriela Crespo
CxA, LEED AP BD+C, O+M
Revitaliza Consultores
Wed, Mar 23, 2016
Mexico
RE: Innovation Credit for Core and Shell v2009
in EBOM 2009 MRc4: Sustainable Purchasing—Reduced Mercury in Lamps
154 José Solis
Big and Bright Strategies
Wed, Mar 23, 2016
United States
RE: LEED "Owner" (vs. Leasing)
in PIf3: Occupant and Usage Data
2 Heraldo Muñoz
Wed, Mar 23, 2016
RE: Certificate timeline
in ND Plan-v4: Certified green buildings
2 Eliot Allen
LEED AP-ND, Principal
Criterion Planners
Tue, Mar 22, 2016
Rooftop Greenhouse
in Schools 2009 SSc5.2: Site Development—Maximize Open Space
22 Sarah Nugent
Sustainability Consultant
Steven Winter Associates, Inc
Thu, Mar 17, 2016
United States
RE: Credit Specific requirements and Additional Questions mis-match
in Retail–CI-v2009: Material multi-attribute assessment
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Mar 16, 2016
Title Comments Most Recent Post Location
upgrading to LEED-EBOM 2009
in Change the version of LEED - EB - O & M (V.2008 to v.2009)
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
LEED documentation samples
in LEED Calculation examples
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Apr 20, 2011
RE: LEED for Healthcare in Second Public Comment Period
in LEED for Healthcare in Second Public Comment Period
3 Susan Walter
Specifications Director
Populous
Fri, Apr 15, 2011
LEED ND AND EBOM - by Gurpreet Misra
Mon, Apr 4, 2011
Review of Advanced Energy Modeling for LEED Technical Manual - by Shillpa Singh
Tue, Apr 26, 2011
performance period start date
in Credits where Performance Period must include a specific day of the year?
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Mar 28, 2011
Hong Kong project is Seeking Platinum+ Green Office and Laboratory buildings for US or international study tour - by Julian Bott
Mon, Mar 28, 2011
RE: time delay in fit out
in project boundary and time delay during construction
3 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Mar 25, 2011
Supplemental Documents
in Supplemental Documents
1 David Eldridge
Project Manager
Grumman/Butkus Associates
Tue, Mar 22, 2011
RE: Commissioning process in a volume program
in LEED Volume Certification Program Launched
2 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Tue, Mar 22, 2011
registering after construction starts
in Registration after starting Construction
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Fri, Mar 18, 2011
Mechanical Schedules
in LEED EBOM - PI FORM 4
1 David Eldridge
Project Manager
Grumman/Butkus Associates
Tue, Mar 15, 2011
RE: which LEED system
in utility bills for multi tenanted buildings
3 David Eldridge
Project Manager
Grumman/Butkus Associates
Tue, Mar 15, 2011
RE: rating system selection forum
in LEED CI - Minimal TI for a Large Space: Will This be Accepted?
3 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Mar 9, 2011
RE: I'm tired of Henry Gifford
in LEED Story on NPR's All Things Considered
13 E Johnson
Tue, Mar 8, 2011
RE: maintaining LEED certification
in Certified Building - maintaining certification for LEED v2.2 buildings
2 Pinky Khatri
Designer/Sustainability Coordinator
VBN Architects
Tue, Mar 8, 2011
Appeal documentation
in Standard Template/Format for submitting Credit Appeal and Clarification
1 Susann Geithner
CEO
Geithner Consulting
Tue, Mar 8, 2011
DSIRE...
in Tax Credits and Incentives in California
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Mon, Mar 7, 2011
webcast
in Energy Benchmarking in LEED-EBOM Webinar
1 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, Mar 3, 2011
RE: i've been a usgbc employee for almost 9 years...
in New Plaintiffs Join Amended LEED Lawsuit
24 Bill Swanson
PE, LEED AP
Integrated Architecture
Fri, Feb 25, 2011
Title Comments Most Recent Post Location
RE: Freatics water
in NC 2009 WEp1: Water Use Reduction—20% Reduction
791 Charles Nepps
Charles Nepps Consulting
Wed, Jan 27, 2016
RE: Freatics water
in NC 2009 WEp1: Water Use Reduction—20% Reduction
791 Charles Nepps
Charles Nepps Consulting
Wed, Jan 27, 2016
RE: Performance Period Extension, Post-Reviewer's Comments
in Performance Period
57 Trista Little
Sustainability Manager
YR&G
Wed, Jan 27, 2016
RE: Performance Period Extension, Post-Reviewer's Comments
in Performance Period
57 Trista Little
Sustainability Manager
YR&G
Wed, Jan 27, 2016
RE: Total Site Area within LEED Project Boundary
in PIf2: Project Summary Details
256 deborah lucking
associate
fentress architects
Tue, Jan 26, 2016
MERV13 filter replacement to pre-filters / filters
in NC v2.2 EQc5: Indoor Chemical and Pollutant Source Control
102 Jane Long
Ms
Fri, Jan 22, 2016
RE: Interior Cross-Contamination Prevention, Industrial Curtain Wall
in CS v4: Enhanced indoor air quality strategies
5 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Thu, Jan 21, 2016
Looks like I’m first to post here so here goes!
in Pilot Credit 85: Learning Controls for Thermal Comfort
1 Dirk Kestner
Principal
Walter P Moore
Wed, Jan 20, 2016
United States
our discussion forums
in Start a New LEED Discussion Topic
217 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Tue, Jan 19, 2016
Major renovation with re-insulation of external walls and roofs
in NC-2009 MRc1.1: Building Reuse—Maintain Existing Walls, Floors and Roof
117 Qian Tang
Thu, Jan 14, 2016
RE: Health and Safety Specialist
in Pilot Credit 44: Ergonomics Strategy
48 Ian Merker AIA, LEED AP BD+C
Architect
Rainforth Grau
Wed, Jan 13, 2016
RE: Can roofed areas be considered open space?
in CS 2009 SSc5.2: Site Development—Maximize Open Space
61 Allison Smith
Sustainable Design Coordinator
HKS Architects
Tue, Jan 12, 2016
RE: IEQc8.1 Core and Shell credit with no tenant fit out
in CS 2009 IEQc8.1: Daylight and Views—Daylight
144 CT G
Tue, Jan 12, 2016
n/a
in NC-v4: Construction and demolition waste management
50 Ralph Bicknese
Principal
Hellmuth + Bicknese Architects
Fri, Jan 8, 2016
Alternative Compliance Path
in Schools SSp2: Environmental Site Assessment
56 timothy thomas
project architect
bshm architects
Fri, Jan 8, 2016
United States
Minimum IAQ Performance Calculator - Multiple Zone and 100% OA
in CI-2009 IEQp1: Minimum IAQ Performance
166 Ronald Dean
Sumac Inc.
Fri, Jan 8, 2016
LDP for EBOM Recertification - Pros and Cons?
in Discuss the LEED Dynamic Plaque
7 Kimberlee Dobbins
Sustainability Coordinator
City of Virginia Beach
Thu, Jan 7, 2016
United States
RE: LEED certification for part(s) of a hospital--op. rooms v. gar.?
in PIf1: Minimum Program Requirements
3 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Dec 30, 2015
please post to a SPECIFIC LEEDuser forum
in PIf1: Minimum Program Requirements
3 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Dec 30, 2015
RE: Third Party Data Source
in PIf1: Minimum Program Requirements
4 Tristan Roberts
LEED AP BD+C, Executive Editor – LEEDuser
BuildingGreen, Inc.
Wed, Dec 30, 2015
Title Comments Post date Most Recent Postsort icon Location
Exterior doors in meeting rooms
in NC 2009 IEQc5: Indoor Chemical and Pollutant Source Control
465 Jeannie Rueter
Green Building Analyst
Ausonio Incorporated
Tue, Oct 4, 2016
2016-10-04 13:37 United States
IEQp1-tenant spaces
in CS-2009 IEQp1: Minimum IAQ Performance
182 Agata Mozer
GO4IT SP Z OO SP K
Tue, Oct 4, 2016
2016-10-04 11:47 Poland
LEED v3 Campus Deadline
in MPR3: Must use a reasonable site boundary
253 Francis McNulty
OCSC
Tue, Oct 4, 2016
2016-10-04 09:36 Ireland
Green Power Contract through vendor
in Retail-NC-v4: Green power and carbon offsets
4 Joanna Ruiz
Project Manager, LEED AP
Wallin/Gomez Architects
Mon, Oct 3, 2016
2016-10-03 15:48 United States
Definition of "bus line"
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
296 Michael Kennedy
Architect
Clark Nexsen Architecture & Engineering
Mon, Oct 3, 2016
2016-10-03 10:23 United States
pressure drop adjustment System 1
in NC 2009 EAp2: Minimum Energy Performance
3,939 R2M Solution Srl
R2M Solution Srl
Mon, Oct 3, 2016
2016-10-03 04:11 Italy
Acoustic ceiling & gypsum board
in CS 2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Products
18 Anna Okviana
Total Bangun Persada
Mon, Oct 3, 2016
2016-10-03 03:18 Indonesia
(HERS) index score of at least 75
in ND-v2009: Building energy efficiency
14 mugahid khatib
TexEnergy Solutions
Fri, Sep 30, 2016
2016-09-30 11:49 Canada
NC-2009 SSc4.1 - Exemplary Performance
in NC 2009 SSc4.1: Alternative Transportation—Public Transportation Access
296 Robert O'Reilly
Architect
Kitchen & Associates
Fri, Sep 30, 2016
2016-09-30 08:36 United States
Sinks in doctor's consulting room
in CS 2009 WEp1: Water Use Reduction—20% Reduction
224 Agata Mozer
GO4IT SP Z OO SP K
Thu, Sep 29, 2016
2016-09-29 11:30 Poland
Homes / Low Rise Multifamily
in Homes-v4: Environmentally preferable products
1 Mark Murphy
Thu, Sep 29, 2016
2016-09-29 09:44 United States
Calculating MRc4 - Recycable Material Credits
in NC 2009 MRc4: Recycled Content
648 Richard Metts
CPC, LEED AP BD+C
Durotech, Inc.
Wed, Sep 28, 2016
2016-09-28 11:25 United States
Tri-gen
in NC-v4: Minimum energy performance
168 Victoria Watson
Wed, Sep 28, 2016
2016-09-28 11:16 United States
Inverted Marking Paint
in NC 2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
582 Lawrence Lile
Chief Engineer
Lile Engineering LLC
Tue, Sep 27, 2016
2016-09-27 17:41 United States
Lawn acceptance
in NC 2009 SSc5.1: Site Development—Protect or Restore Habitat
289 Francis McNulty
OCSC
Tue, Sep 27, 2016
2016-09-27 12:53 Ireland
LEED Basement Boundary
in MPR3: Must use a reasonable site boundary
253 Francis McNulty
OCSC
Tue, Sep 27, 2016
2016-09-27 11:46 Ireland
Daylight controls / sensors vs Occupancy Sensors or Both?
in CI 2009 EAc1.2: Optimize Energy Performance—Lighting Controls
102 Katie Peterschmidt
Associate Director, CORE Steward
Cooper Carry
Tue, Sep 27, 2016
2016-09-27 10:10 United States
Filtration Change Prior to Flush-out
in NC 2009 IEQc3.2: Construction Indoor Air Quality Management Plan—Before Occupancy
357 Marcia Weekes
LEED Coordinator
Ecostrategic Construction Solutions
Tue, Sep 27, 2016
2016-09-27 08:17 United States
Pilot Credit Attempts
in Using the LEED Pilot Credit Library
44 Patricia Lloyd
Sustainability Manager
Leopardo Companies, Inc.
Mon, Sep 26, 2016
2016-09-26 17:38 United States
100% OA Laboratory System
in NC-v4: Minimum energy performance
168 Charles Daze
Project Engineer
Burns & McDonnell
Mon, Sep 26, 2016
2016-09-26 12:23 United States

Copyright 2017 – BuildingGreen, Inc.